• Diamondback Energy, Inc. ( NASDAQ: FANG )

2024 Development Program Includes



Area

Category

2023

2024 Est. Initial
Updated
2024 Guidance
%Difference
(2023 vs 2024)
Company Wide Total Capital Expenditure ($mm)

        
Company Wide Production Daily Equivalent (boe/d)
Company Wide Production Oil (bbls/d)

 Click here for More Planned 2024 Activity

Permitting Activity


April 04,2024 : Diamondback Energy, Inc. Permitted the WILKINSON RANCH 7-5 A 1H Horizontal well in Midland,TX : Midland Basin,Permian Basin
March 26,2024 : Diamondback Energy, Inc. Permitted the ABU GARCIA 28-16 U 21WB Horizontal well in Martin,TX : Midland Basin,Permian Basin
March 26,2024 : Diamondback Energy, Inc. Permitted the ABU GARCIA 28-16 N 14WA Horizontal well in Martin,TX : Midland Basin,Permian Basin
March 26,2024 : Diamondback Energy, Inc. Permitted the ABU GARCIA 28-16 A 1MS Horizontal well in Martin,TX : Midland Basin,Permian Basin
March 26,2024 : Diamondback Energy, Inc. Permitted the ABU GARCIA 28-16 C 3JM Horizontal well in Martin,TX : Midland Basin,Permian Basin
Click here for More Permits Activity

Completion Activity / Well Results


December 07,2021 : Diamondback Energy, Inc. completed the BLACKFOOT EAST D 706WA well in Midland,TX with 25 Million lbs of proppant using Linear Gel/Slick Water Frac. The Well flowed 1,053 boe/d which consists of 883 Oil BOPD and 984 Mcf of gas on a 12,887 foot lateral .
November 17,2021 : Diamondback Energy, Inc. completed the SITES 9-4 E 7WA well in Glasscock,TX using Linear Gel/Slick Water Frac. The Well flowed 1,489 boe/d which consists of 884 Oil BOPD and 3.509 MMcf of gas on a 10,307 foot lateral .
November 17,2021 : Diamondback Energy, Inc. completed the SITES 9-4 D 5WA well in Glasscock,TX with 18 Million lbs of proppant using Linear Gel/Slick Water Frac. The Well flowed 1,379 boe/d which consists of 865 Oil BOPD and 2,983 Mcf of gas on a 10,332 foot lateral .
November 15,2021 : Diamondback Energy, Inc. completed the HOLE IN THE ROCK 46-47 H 8BS well in Pecos,TX . The Well flowed 547 boe/d which consists of 482 Oil BOPD and 0.378 MMcf of gas on a 10,129 foot lateral .
November 15,2021 : Diamondback Energy, Inc. completed the HOLE IN THE ROCK 46-47 G 7BS well in Pecos,TX . The Well flowed 1,125 boe/d which consists of 984 Oil BOPD and 0.815 MMcf of gas on a 10,200 foot lateral .
Click here for More Completion Activity

Latest News & Activity




Deals - Diamondback Energy, Inc. Acquisitions


Announce Date Price($MM) Region/Basin Headline
Feb-12-2024 Permian - Midland Basin  Diamondback To Acquire Endeavor Energy In $26 Billion Transaction
Nov-16-2022 Permian,Permian - Midland Basin  Diamondback Acquires Pure Play Permian; Lario
Oct-11-2022 Permian - Midland Basin  Diamondback to Acquire Permian E&P Firebird for $1.6B in Cash/Stock
Total
More Deals...


Deals - Diamondback Energy, Inc. Divestiture(s)


Announce Date Price($MM) Region/Basin Headline
Oct-21-2021 Permian  Rattler Midstream Acquires Permian Water Assets in $160MM Drop-Down Deal
May-04-2021 Permian - Delaware Basin,Permian - Midland Basin  Diamondback Unloads Non-Core Permian Assets in $87MM Deal
May-03-2021 Williston Basin  Oasis Acquries Bakken Property From Diamondback; $745 Million
Total
More Deals...


Capital Raised


Announced DateAmount($MM) Type Headline
Mar-04-2022 Debt Diamondback Offers $750 Million in 4.250% Senior Notes
Sep-20-2021 Buy Back Diamondback Initiaties $2.0 Billion Stock Buyback
Mar-19-2021 Debt Diamondback Energy Prices $2.2 Billion Debt Offering
Total
More Financing...


About


Diamondback Energy, Inc focuses on the acquisition, development, exploration, and exploitation of onshore oil and natural gas reserves in the United States It has interests in approximately 51,709 net acres of land in West Texas in the Permian Basin It

500 West Texas
Suite 1200
Midland TX 79701
Phone Number
432 221 7400




Latest Presentations       More Presentations>>


Key Slides found in this Presentation


 Drilling Activity ( Jan 2017 - Apr 2024)
Basin
CENTRAL BASIN PLATFORM
DELAWARE BASIN
GULF COAST BASIN
MIDLAND BASIN
SAN JUAN BASIN

Personnel (6 people)

-
VP Strategy and Corporate Development
Phone : -
-
VP Exploration and Geoscience
Phone : -
-
VP and General Counsel
Phone : -
-
VP Reservoir Engineering
Phone : -
-
Senior VP and CFO
Phone : -
-
President and CEO
Phone : -
Frist Name Last Name Title Email Phone
Kaes Van't Hof VP Strategy and Corporate Development 432-221-7400
Paul Molnar VP Exploration and Geoscience 432-221-7400
Randall Holder VP and General Counsel 432-221-7400
Russell PanterMuehl VP Reservoir Engineering 432-221-7400
Teresa Dick Senior VP and CFO 432-221-7400
Travis Stice President and CEO 432-221-7400

A valid subscription is required to view this information
Please sign in to see the details - Sign In
Need a Subscription?
Click Here to Subscribe
A valid subscription is required to view this information
Please sign in to see the details - Sign In
Need a Subscription?
Click Here to Subscribe

A valid subscription is required to view this information
Please sign in to see the details - Sign In
Need a Subscription?
Click Here to Subscribe

2024 Development Program Includes Click here for More Planned 2024 Activity    



Area

Category

2023

2024 Est. Initial
Updated
2024 Guidance
%Difference
(2023 vs 2024)
Company Wide Total Capital Expenditure ($mm)

        
Company Wide Production Daily Equivalent (boe/d)
Company Wide Production Oil (bbls/d)

 Company Divestiture

Announce Date Buyer$MMTypePlay/LocationDetails
Oct-21-2021 Asset Permian Basin 
May-04-2021 Property Midland Basin,Delaware Basin 
May-03-2021 Property Bakken Shale & Three Forks 


 Company Acquisitions

Announce DateSeller$MMTypePlay/LocationDetails
Feb-12-2024 Corporate Midland Basin 
Nov-16-2022 Corporate Midland Basin 
Oct-11-2022 Corporate Midland Basin 
No Results found

Company Hits Pay with 1180 BOPD Midland County Spraberry Well

June 22,2015
Horizontal well which IP'd at 1,184 BOPD in Midland County.

Midland County Spraberry Well, 1300 BOPD

May 12,2015
Horizontal well which IP'd at 1278 BOPD in Midland County.

Diamondback's Spraberry Wells Outperform Type Curve

May 07,2015
Diamondback's Q1 2015 production increased 19% to 30.6 Mboe/d from 25.7 Mboe/d in Q4 2014.

Diamondback's Spanish Trail Economic at $50

March 23,2015
Diamondback Energy is maintaining its earlier announced 2015 capital spend.

Diamondback Touts Strong Spraberry Results; Details 4Q

February 18,2015
The company detailed its latest results in the Spraberry, reserve growth and its 2015 outlook.

The Permian in 2015: 10 Companies to Drill ~1,460 Wells

February 08,2015
Part III of our feature series is focused on the Permian Basin. The ten companies below are planning to drill up to a combined 1,446 wells in 2015.

Diamondback Axes Plan to Accelerate Permian Drilling in 2015

January 16,2015
The company is also cutting down its rig count from eight to three.

Diamondback Continues Permian/Spraberry Dev; 2015 Budget Flat

January 13,2015
The company also detailed its latest results in the Wolfcamp and Spraberry plays.

Diamondback's Lower Spraberry Wells Pull Ahead; Six Rigs Running

November 05,2014
Q3 2014 production was 20.6 Mboe/d, an increase of 16% from Q2 2014 and 178% from Q3 2013.

Diamondback Drilling 60 HZ Wells in 2014, Production Increases 32%

August 06,2014
Q2 2014 production increased 32% to 17.8 Mboe/d from Q1 2014.

Diamondback Unveils Latest Permian Well Results; Will Add Rig

July 21,2014
The Neal F Unit 8 #6LS well in Upton County, with a 6,811 foot lateral, achieved a 24-hour initial production...

Top Permian Operator to Spud Its First Cline Shale Well

May 10,2014
Diamondback Energy Inc. provided the following update regarding its plan to test the Cline Shale during it's analyst call on May 10, 2014.

Pioneer, Diamondback, RSP Permian Showcase Big Wolfcamp Wells

May 10,2014
Diamondback Energy showcased significant wells in and around its acreage by the leading Permian Basin players.

DiamondBack Move Minerals To Viper Energy Partners; Files IPO

May 10,2014
Diamondback's spins out Viper Energy Partners to handle minerals underlying aproximately 12,687net acres in the Permian Basin Core (Midland county, Tx).

Wolfcamp B Well Produces 60 MBOE in 30 Days

May 08,2014
According to Shale Experts calculations, the well is on target to payout in <120 days.

Diamondback Boast Big Wolfcamp B Wells

April 10,2014
11 operated Wolfcamp B wells were completed during Q1 2014, ten of which have sufficient production history for an average 24 hour rate of...

Diamondback Sees Impressive Midland Wolfcamp Wells

February 07,2014
Diamondback reports impressive Midland Wolfcamp B Results; Reducing Well Cost through recycling Frac Water.

Operators Searching for Southern Midland Basin Wolfcamp Key

January 31,2014
What is still very clear is that operators continue to test various lateral length, frac stages and volumes of fluids used in frac these wells.

The 3 E&P Companies That Grew More Than 100% In 2013

January 07,2014
Three Companies have stood out in the last year and driven their stock to double in price in 2013.

Diamondback Happy With Initial Middle Spraberry Results; Grows Production

November 05,2013
The Company's first horizontal Middle Spraberry test well, the Sarah Ann 3814H, a non-operated well in Midland County, had a peak 24 hour initial production ("IP") rate of 733 Boe/d (90% oil)