Skip to main content SEPTEMBER 2014 CORPORATE PRESENTATION – Interoil Exploration & Production Asa | Shale Experts
Loading...

SEPTEMBER 2014 CORPORATE PRESENTATION – Interoil Exploration & Production Asa

Interoil Exploration & Production Asa · Sep 11, 2014 · 9 slides

Investor presentation from the Shale Experts oil & gas presentation and slide database. Every page is imaged and its text indexed for search across operators, plays, basins and time.

Slides

  1. SEPTEMBER 2014 CORPORATE PRESENTATION – Interoil Exploration & Production Asa – slide 1
    Company presentation Pareto conference 11th September 2014 1
  2. SEPTEMBER 2014 CORPORATE PRESENTATION – Interoil Exploration & Production Asa – slide 2
    Recent developments Norway, Oslo Puli C development program mixed results, upside remains Headquarter Disappointed with production development, but remain confident in asset potential Colombia, Puli-C & exploration Main reason…
  3. SEPTEMBER 2014 CORPORATE PRESENTATION – Interoil Exploration & Production Asa – slide 3
    Actions taken As a consequence of these results the following actions have been taken: Altair Revised investment plan in order to realize high- potential LLA-47 exploration option in early 2015 Substantial strengthening of…
  4. SEPTEMBER 2014 CORPORATE PRESENTATION – Interoil Exploration & Production Asa – slide 4
    Revised strategy Revised strategy 2014: Lince-Leopardo Drill the Lince-Leopardo prospect on LLA-47: Aim to start drilling in December 2014 2015 plan: New models and increased organizational strength will enable Interoil to…
  5. SEPTEMBER 2014 CORPORATE PRESENTATION – Interoil Exploration & Production Asa – slide 5
    New drilling strategy Interoil has the opportunity to test the exploration option in the short term by drilling one well on the Western trend (Lince-Leopardo) of LLA-47 The geological probability of success (PoS) has been…
  6. SEPTEMBER 2014 CORPORATE PRESENTATION – Interoil Exploration & Production Asa – slide 6
    Clear trends identified in prospective neighborhood Copas - C3, C5 y C7 Remaches - C5 Mapache - 9390 BOPD - API 32 to 757 BOPD - API C7/Mirador 40 33.9 677 BOPD - API 34 4.3+3.2+3.1 MMBbls 5.1+3.9 MMBbls 2.58 MMBbls 2000…
  7. SEPTEMBER 2014 CORPORATE PRESENTATION – Interoil Exploration & Production Asa – slide 7
    LLA-47 Interpretation results Seismic processing with encouraging results Several opportunities mapped: C3 12 opportunities in one Tertiary C7 K1 reservoir K2. 15 opportunities in one Cretaceous reservoir Another 4…
  8. SEPTEMBER 2014 CORPORATE PRESENTATION – Interoil Exploration & Production Asa – slide 8
    Lince-Leopardo opportunity Northwestern area of block 48% probability of success, reflecting: P10 P50 El Duya Reservoir: The presence and quality is confirmed from surrounding fields P90 Trap: Confirmed by 3D seismic and…
  9. SEPTEMBER 2014 CORPORATE PRESENTATION – Interoil Exploration & Production Asa – slide 9
    9

From the store

Browse maps, data & reports in the Shale Experts store