Skip to main content

Spraberry Play

Spraberry Play News

HighPeak Boosts Capex 20% for 2021, Drilling Up 47%; Full Year 2020 Results

HighPeak Boosts Capex 20% for 2021, Drilling Up 47%; Full Year 2020 Results

HighPeak Energy, Inc. reported its Q4 and full year 2020 results as well as its 2021 capital plan. 2021 Plan - Capex: $135-150 million - up 20% vs.…

Callon's Drilling Ops Up Over +30% YOY in Q1; Spending, Production Also Jumps

Callon's Drilling Ops Up Over +30% YOY in Q1; Spending, Production Also Jumps

Callon Petroleum Co. reported its Q1 2019 results. Highlights from its report and presentation follow. Q1 Summary - Well Activity (gross): Drilled 21 wells / TIL 13 wells…

SM's Permian Completions Jump +71% YOY as Eagle Ford Drops 60%; Touts Latest IP30s

SM's Permian Completions Jump +71% YOY as Eagle Ford Drops 60%; Touts Latest IP30s

SM Energy Co. reported its Q1 2019 results. Highlights from its report and presentation are below. Q1 Summary: Permian Ops Up +71% YOY as Eagle Ford Drops -60%…

Diamondback's Drilling Up 41% YOY; Focuses on Cutting Costs Post-Merger

Diamondback's Drilling Up 41% YOY; Focuses on Cutting Costs Post-Merger

Diamondback Energy, Inc. reported its Q1 2019 results. Here are the highlights from its report and presentation. Q1 Summary - Q1 D&C Spend: Diamondback spent $533 million during…

Laredo's Oil Production Falls off The Cliff; Ups 2019 Budget, More Wells

Laredo's Oil Production Falls off The Cliff; Ups 2019 Budget, More Wells

Laredo Petroleum reported its Q1 results and One thing that something that stuck out was that the company's oil mix continues to fall even though its production keep…

SM Turns on Taps at 25-Well Merlin Maximus Pad; Spraberry, Wolfcamp Targets

SM Turns on Taps at 25-Well Merlin Maximus Pad; Spraberry, Wolfcamp Targets

SM Energy Co. detailed its recent operations on its 25-well Merlin Maximus development (targeting the Spraberry / Wolfcamp) within its RockStar area. All 25 wells were drilled and…

Pioneer Unveils 2019 Capital Plans; Relatively Flat Drilling, Spending

Pioneer Unveils 2019 Capital Plans; Relatively Flat Drilling, Spending

Pioneer Natural Resources has detailed its 2019 outlook. 2019 Plans - 2019 Capex: $3.1-3.4 billion Permian Budget: $2.8-3.1 billion - 2019 Production: 320-335 MBOEPD - Rig Count: 21-23…

Record Well: Operator Drills Best Well in Glasscock County; Flows 3,900 BOEPD; 90% Oil

Record Well: Operator Drills Best Well in Glasscock County; Flows 3,900 BOEPD; 90% Oil

Pioneer Natural Resources has drilled a record breaking well in Glasscock County, TX. The Jim Tom E41S 119H well targeted the Spraberry in Glasscock County, TX and flowed…

Diamondback Talks 2019 Capex Post-Energen Takeover; YOY Comparison, Rigs, Wells, Capex

Diamondback Talks 2019 Capex Post-Energen Takeover; YOY Comparison, Rigs, Wells, Capex

Diamondback Energy detailed its 2019 development plans, budget and guidance. CEO Travis Stice noted that the budget / operating plans could be cut if commodity price volatility continues:…

Diamondback Adds 14th Rig to Fleet; Talks Latest Well IPs

Diamondback Adds 14th Rig to Fleet; Talks Latest Well IPs

Diamondback Energy reported its Q3 2018 results. - Q3 production of 123 MBOEPD - up 9% from 2Q18 and up +45% YOY Increasing full year 2018 production guidance…

Spraberry Play Well Completion Trend

Spraberry Play Map

Spraberry Play Rig Data: August 13, 2026

Spraberry Play Overview

The Spraberry field was discovered in 1935 and extends over several counties in West Texas comprising about 1.6 million acres. The field is 150 miles long and 75 miles wide, and it has undergone much change and expansion over the years, both aerially and vertically. The correlative interval is now over 3,500 feet thick and includes the Clearfork, Upper Spraberry, Lower Spraberry, Dean, and Wolfcamp formations. These formations are correlative over the area, but are lenticular in nature and vary in thickness, porosity, and permeability even over short distances. The…

Spraberry Play Transactions By Quarter ($MM)