Agenda Overview Operating Results and Highlights Financial Performance and Analysis Outlook 3
Overview Smooth progress on exploration, development and production Net production was 432.5 million boe*, up 5.1% YoY 20 new discoveries were made, success rate of independent exploration wells in offshore China reached 50-70%…
Operating Results and Highlights
Exploration Summary 80 5 60 16 1 3 40 63 50 20 0 Wildcat Appraisal (km) (km2) 3,475 500 4,873 20,477 17,953 2D Seismic 3D Seismic China - Independent China - PSC Overseas We continued to focus on exploration and…
New Discoveries in 2014 China Bohai Lingshui 25-1 Success rate of independent Bozhong 22-1 Wenchang 19-6 exploration wells in offshore Luda 16-3S Weizhou 12-10 China reached 50-70% Kenli 16-1 Eastern South Jinzhou 23-2 China…
Exploration Breakthroughs Our independent deepwater exploration achieved the first large-size gas discovery, Lingshui 17-2 Exploration breakthrough in Bohai included important discoveries such as Jinzhou 23-2 and Bozhong 22-1…
Significant Progress in Deepwater Exploration New hydrocarbon accumulation model was discovered, providing guidance for independent deepwater exploration Our independent deepwater exploration achieved first large-size gas discovery,…
Reserve (mmboe) 534 5 -41 -15 -433 4,428 4,478 RRR achieved 112%, and reserve life was 10.4 years at end of 2014. 10
Production (mmboe) 600 500 432.5 411.7 400 36% 38% 300 200 64% 62% 100 0 2013 2014 China Overseas Production efficiency offshore China, overseas (excluding Nexen) and Nexen reached record high of 95%, 93% and 88%…
Production Summary 2014* 2013* Crude and Natural Crude and Natural Total Total Liquids Gas Liquids Gas (mm bbls) (bcf) (mm boe) (mm bbls) (bcf) (mm boe) China Bohai 147.4 50.3 155.8 143.2 46.5 151.0 Western South China Sea 29.4…
2014 New Projects Most projects came on stream ahead of schedule and below budget Gross Peak Working Project Location Startup Production Interests (boe/day) 1 Liuhua 19-5 gas field Eastern South China Sea Q1 4,800 100% 2 Liwan…
Focus on Quality and Efficiency Strengthen FEED, optimize overall development plan Optimize exploration plan and project design Integrate exploration, development and engineering construction Implement comprehensive adjustment and…
Achievements of the Year of Quality and Efficiency Due to our efforts in the Year of Quality and Efficiency, significant achievements were made in cost control Demonstrated our culture of execution and project management capability…
Achievements of the Year of Quality and Efficiency Operating expenses savings of RMB 5.5 bn compared to budget SG&A savings of RMB 1.0 bn compared to budget Capex savings of RMB 9.0 bn compared to project estimate 110% of planned…
Health, Safety and Environmental Protection Health, safety and environment protection are always our top priority The Company maintained excellent HSE performance even with substantially increased workload 0.4 160 140 120 0.3…
Nexens HSE Performance Nexens OSHA* Statistics reached record level in 2014 Rate of Recordable Cases Rate of Lost Workdays Cases (per 200,000 man hours) (per 200,000 man hours) 1.0 0.3 0.76 0.8 0.69 0.57 0.2 0.17 0.16 0.6 0.15…
Financial Performance and Analysis
Summary Results 2014 2013 change% Production (mm boe) 432.5 411.7 5.1% - Crude and liquids (mm bbls) 348.8 333.1 4.7% - Natural gas (bcf) 485.5 455.3 6.6% Realized oil price (US/bbl) 96.04 104.60 -8.2% Realized gas price (US/mcf)…
Movement of Financial Position (RMB bn) Dec 31, 2013 Dec 31, 2014 Cash, cash equivalent 37.8 and time deposits with 103.0 maturity over three 40.5 months 106.0 Other current Total assets mainly include: Assets RMB459.2 bn of oil…
Movement of Cash and Cash Equivalent (RMB mm) 150,000 120,000 90,000 95,673 110,508 60,000 30,000 20,216 3,372 4,844 3,131 3,383 4,114 92 14,318 1,719 14,918 - Primary source of cash was operating cash flow, and…
Capex (RMB bn) 107.0 120 90.9 1.3 1.0 12.9 10.6 70-80 80 69.7 61.1 40 18.2 23.2 0 2013 2014 2015B Exploration Development Production Other Exploration and development work increased in 2014, total capex rose by…
All-in Cost (US/boe) 50 45.02 42.30 6.51 40 4.64 3.21 2.59 2.02 1.55 30 21.03 21.30 20 10 12.25 12.22 0 2013 2014 Opex DD&A Dismentalment SG&A Taxes other than income tax All-in cost decreased by 6.0% YoY,…
Cost Analysis Opex SG&A (US/boe) (US/boe) 16 4 12.25 12.22 3.21 12 3 2.59 8 2 4 1 0 0 2013 2014 2013 2014 DD&A Opex of US12.22/boe, a slight decrease of 0.2% YoY, due to (US/boe) 30 effective cost control and steady…
Dividend Recommendation Proposed year-end dividend: HK0.32 per share (tax inclusive) Flat from 2013 final dividend Payout ratio of 33.5%(1) Dividend yield of 5.1%(2) Final dividend payment will be approximately RMB11.33 billion(3),…
Outlook
2015Operating Strategy and Highlights Maintain prudent financial policy and investment decision Strengthen cost control, continue to improve quality and efficiency Ensure safe operation of producing projects Keep sanctioned…
Three-year Rolling Target (mmboe) 600 513 509 475-495 500 433 33% 33% 34% 400 38% 300 200 67% 67% 66% 62% 100 0 2014 2015 Target 2016 Target 2017 Target China Overseas 2016 and 2017 production will see stable…
Long-term Vision Our vision is to become a world leading and respected international oil company o Strengthen foothold at home in offshore China o Prioritize return and establish a competitive asset portfolio o Lead our future…