Geographically Focused Areas of Operation Osage Electra/ Fitts--Allen Fitts Burkburnett Louisiana = Rig working/planned Area of focus in 2011 Lacopita capital budget South Texas 3
Oil and Liquids Rich Reserve Base Benefitting from Existing Price Premium for Oil 66% of production is based on price of oil (1) Oil and liquids account for 85% of sales Oil and liquids account for 64% of proved reserves…
Repositioned for Growth Strategic alternatives review executed completed - RAM closed two non-core asset sales in 2010, gross proceeds totaled 51.7 MM - Reduced bank debt 20% or 49 MM to 196.7 MM at year-end 2010 - Refinanced…
2011 Capital Expenditure Budget and Targets 2011 Capital budget of 35 MM is targeted to be within estimated annual cash flow - 18 MM development and exploitation drilling - 9 MM allocated to exploration p - 8 MM geological,…
Substantial Inventory of Projects(1) RAM has deep inventory of project locations Non- Mature Oil Fields: Proved Proved Total Electra/Burkburnett 214 49 263 N.E. Fitts/Allen 69 10 79 Developing Fields: South Texas 23 55 78…
Recent Drilling Achievements Consistent with Long and Successful Track Record Wells Drilled Wells Drilled Total Wells Drilled 2009 2010 (1) 1987- 2010 (1) Producers 44 62 821 Dry Holes 1 1 18 Drilling or Completing 0 7 7 Total 45…
Major Oil Fields: Strong Operating Cash Flow Supports Company CAPEX Electra / Burkburnett and N.E. Fitts/Allen Areas Combined(1) 50 2,213 BOE/D 52.00/BOE December 2010 net lease operating cash flow from these areas was…
Piper Lease Production Enhancement through Waterflood Historically: Typical of Electra area, wells produce from multiple sands and principal source of production increase has been due to infill drilling Waterfloods Waterflood s…
RAMs Osage Concession: Part of Broad Industry Mississippian Exploration Oil Play Pawnee Harvey Stafford Reno Edwards Greenwood RAM has a concession in Osage g Sedgwick g Butler Pratt County, Oklahoma covering Kiowa Kingman…
Osage Concession Cost to drill and complete vertical well; ll 350 - 400 M ffor iinitial iti l wells; subsequent well cost estimated at 250 M Initial 3-D 3 D seismic acquisition covering 16,000 acres is being drilled Second…
RAMs Osage Concession: Part of Broad Industry Mississippian pp Exploration p Oil Play y 2010 Activity - Mashunkashey 1 - Surber 1 - Rickets 3 13
RAMs Osage Concession: Part of Broad Industry Mississippian pp Exploration p Oil Play y 2010 Activity - Mashunkashey 1 - Surber 1 - Rickets 3 2011 Activity - 1Q: Surber Su be 3, S SWD Farmland 1 Surber 2(Twin) 14
RAMs Osage Concession: Part of Broad Industry Mississippian pp Exploration p Oil Play y 2010 Activity - Mashunkashey 1 - Surber 1 - Rickets 3 2011 Activity - 1Q: Surber Su be 3, S SWD Farmland 1 Surber 2(Twin) - 2Q: 2Q…
RAMs Osage Concession: Part of Broad Industry Mississippian pp Exploration p Oil Play y 2010 Activity - Mashunkashey 1 - Surber 1 - Rickets 3 2011 Activity - 1Q: Surber Su be 3, S SWD Farmland 1 Surber 2(Twin) - 2Q: 2Q…
RAMs Osage Concession: Part of Broad Industry Mississippian pp Exploration p Oil Play y 2010 Activity - Mashunkashey 1 - Surber 1 - Rickets 3 2011 Activity - 1Q: Surber Su be 3, S SWD Farmland 1 Surber 2(Twin) - 2Q: 2Q…
Attractive Valuation Price/Cash Flow Potential appreciation of 35% if RAM multiple equals 2011 peer group price/cash flow average of 5.4X 8X 7 6.2 6 57 5.7 5.8 ash Flow Multiple e 5.4 5.2 5 4.8 4.3 4 3.8 3.5…
Summary of Investment Considerations Repositioned for growth; - Above average oil weighting in production and reserves compared to peers - Stable cash flow base supported by substantial inventory of projects - Osage Concession…
APPENDIX
EBITDA & Free Cash Flow Per Share Non-GAAP Financial Measures Modified EBITDA, a non-GAAP measure, is determined by adding the following to net income (loss): interest expense, income taxes, depreciation, amortization, accretion,…
2011 and 2012 Derivative Positions (1) Crude Oil (Bbls) (2) Natural Gas (Mmbtu) (3)(4) Floors Ceilings g Floors Ceilings g Year Per Day Price Per Day Price Year Per Day Price Per Day Price Q2 11 2,500 80.00 2,500 105.00 Q2 11…
RAM Production by Area Texas Oklahoma Louisiana Other Total Year Ended December 3131, 2010 Aggregate Net Production Oil (MBbls) 559 322 79 35 995 NGLs (MBbls) 341 10 - 13 364 Natural Gas (MMcf) 3,128 849 689 150 4,816 MBoe 1,421 473…
RAM Production by Area Texas Oklahoma Louisiana Other Total Three Months Ended December 31, 2010 Aggregate Net Production Oil (MBbls) 134 78 17 9 238 NGLs (MBbls) 79 3 - 2 84 Natural Gas ((MMcf)) 688 205 175 34 1 102 1,102 MBoe…
Total Debt Debt reduced 139 MM or 41% since December 31, 2007 level of 336 MM after acquisition of Ascent Energy 400 336 300 255 246 Debt MM 200 197 Total D 100 0 2007 2008 2009 2010 26 (1) As of 12/31…
5100 East Skelly Drive Meridian Tower, Suite 650 Tulsa, Oklahoma 74135 (918)663-2800 www.ramenergy.com