Contingent Resources Discovered Hydrocarbons Not in the 146.1 MMboe reserves Not currently regarded commercial because: Additional appraisal required Maturation technical work required Additional seismic required Pilot…
Contingent Resource- Additional Appraisal Required 20'0E Talisman 0 km 6 DNO Nor UK NORWAY - PL148 way Oil discovery Blackcurrent Leads Blackberry Lead 21 MMstb recoverable volume Reserves Awaiting appraisal to rm up…
Contingent Resource - Pilot Required Intervals covered by Petrophysical analyses UK - Heather Triassic depth interval of oil shows Underlying Heather Brent Sequence 8.3 MMstb recoverable volume (assumes 5% RF) UPPER…
Contingent Resources - Maturation Technical Work Grandville 600 500 FRANCE - Villeperdue 400 North-East Underdeveloped 300 Partially depleted reservoir, needs inll and water injection 200 Needs underbalanced drilling 100…
Contingent Resource - Additional Seismic Required Broom UK - SW Heather Oil discovery Complex structure Poor seismic denition 3D seismic in Q2 2006 12 MMboe recoverable volume South West Heather WF8360 01.06
Contingent Resource - Currently not Economic TUNISIA - Birsa Oil Discovery, appraised with 5 wells Complex Structure Complex geology Carried out 2005 development study 2006 12 MMboe recoverable volume Maximum Development…