Skip to main content Capital Markets Day – Lundin Petroleum Investor Presentation | Shale Experts
Loading...

Capital Markets Day – Lundin Petroleum

Lundin Petroleum · Jan 24, 2006 · 11 slides

Investor presentation from the Shale Experts oil & gas presentation and slide database. Every page is imaged and its text indexed for search across operators, plays, basins and time.

Slides

  1. Capital Markets Day – Lundin Petroleum – slide 1
    Contingent Resources Capital Market Day Presentation WF8328 01.06 24th January 2006
  2. Capital Markets Day – Lundin Petroleum – slide 2
    5HVRXUFH&ODVVLILFDWLRQ6VWHP 4PDJFUZPG1FUSPMFVN&OHJOFFSTMBTTJmDBUJPO 130%65*0/ 3&4&37&4 PNNFSDJBM 1SPWFE 1SPWFE 1SPWFE1SPC 1SPCBCMF 1PTTJCMF 0/5*/(&/5 %JTDPWFSFECVUVODPNNFSDJBM 3&4063&4 13041&5*7&…
  3. Capital Markets Day – Lundin Petroleum – slide 3
    Contingent Resources Internal estimate 131.5 mmboe net Lundin France Paris Basin, 9.8 Norway, 48.8 Alvheim upside Hamsun waterood Other, 32.3 PL292 PL148 PL006c PL340 PL167 United Kingdom, 40.4 Heather improved…
  4. Capital Markets Day – Lundin Petroleum – slide 4
    Production Forecast - Contingent Resources mboepd 90.0 80.0 70.0 60.0 Undeveloped Reserves Developed Reserves 50.0 40.0 30.0 20.0 10.0 0.0 0 05 0 06 0 07 0 08 0 09 0 10 0 11 0 12 0 13 0 14 0 15 0 16 0 17 0 18 0…
  5. Capital Markets Day – Lundin Petroleum – slide 5
    Production Forecast - Contingent Resources mboepd 90.0 80.0 Contingent Resources - Others Contingent Resources < 25 /boe 70.0 Contingent Resources < 15 /boe 60.0 Undeveloped Reserves Developed Reserves 50.0 40.0 30.0…
  6. Capital Markets Day – Lundin Petroleum – slide 6
    Contingent Resources Discovered Hydrocarbons Not in the 146.1 MMboe reserves Not currently regarded commercial because: Additional appraisal required Maturation technical work required Additional seismic required Pilot…
  7. Capital Markets Day – Lundin Petroleum – slide 7
    Contingent Resource- Additional Appraisal Required 20'0E Talisman 0 km 6 DNO Nor UK NORWAY - PL148 way Oil discovery Blackcurrent Leads Blackberry Lead 21 MMstb recoverable volume Reserves Awaiting appraisal to rm up…
  8. Capital Markets Day – Lundin Petroleum – slide 8
    Contingent Resource - Pilot Required Intervals covered by Petrophysical analyses UK - Heather Triassic depth interval of oil shows Underlying Heather Brent Sequence 8.3 MMstb recoverable volume (assumes 5% RF) UPPER…
  9. Capital Markets Day – Lundin Petroleum – slide 9
    Contingent Resources - Maturation Technical Work Grandville 600 500 FRANCE - Villeperdue 400 North-East Underdeveloped 300 Partially depleted reservoir, needs inll and water injection 200 Needs underbalanced drilling 100…
  10. Capital Markets Day – Lundin Petroleum – slide 10
    Contingent Resource - Additional Seismic Required Broom UK - SW Heather Oil discovery Complex structure Poor seismic denition 3D seismic in Q2 2006 12 MMboe recoverable volume South West Heather WF8360 01.06
  11. Capital Markets Day – Lundin Petroleum – slide 11
    Contingent Resource - Currently not Economic TUNISIA - Birsa Oil Discovery, appraised with 5 wells Complex Structure Complex geology Carried out 2005 development study 2006 12 MMboe recoverable volume Maximum Development…

From the store

Browse maps, data & reports in the Shale Experts store