  1. GOLDMAN SACHS PRESENTATION – Awe Limited – slide 1
    Goldman Sachs Presentation 3 August 2010
  2. GOLDMAN SACHS PRESENTATION – Awe Limited – slide 2
    Highlights June quarter production up 47% to 1.65 million BOE. Full year production totalled 6.1 million BOE. Revenue for the quarter rose 10% to 86 million. Annual revenue 354 million. Reduced operating expenses. EBITDAX 57…
  3. GOLDMAN SACHS PRESENTATION – Awe Limited – slide 3
    AWE Quarterly Revenue & Production
  4. GOLDMAN SACHS PRESENTATION – Awe Limited – slide 4
    AWE Quarterly Production by Project AWE Quarterly Production by Project 3.0 Onshore PB Tui Area 2.5 Cliff Head Million barrels of Oil Equivalent Casino BassGas 2.0 Other (mm BOE) 1.5 1.0 0.5 0.0 Sep-07…
  5. GOLDMAN SACHS PRESENTATION – Awe Limited – slide 5
    BassGas project Development studies continued on Trefoil gas AWEs share of quarterly production reached 2.3 discovery (AWE 47.5%) PJ of gas with approximately 80,000 barrels of condensate and approximately 3,900 tonnes of Yolla…
  6. GOLDMAN SACHS PRESENTATION – Awe Limited – slide 6
    New Zealand Tui SW-1 and Kahu-1 disappointed. Tuatara (AWE 60%) drilling final well in in New Zealand program. 2D seismic survey in PEP 38451 (AWE10%). Pateke-3H well was shut-in after identification of a minor leak within the…
  7. GOLDMAN SACHS PRESENTATION – Awe Limited – slide 7
    Western Australia Redback-2 gas exploration well (AWE 33%) will be tied-in to Beharra Springs. Wolf-1 appraisal well drilling. Core analysis of the three cores recovered from Carynginia Shale in the Woodada Deep-1 indicated that…
  8. GOLDMAN SACHS PRESENTATION – Awe Limited – slide 8
    Casino Production operations continued at the Casino and Henry/Netherby gas (AWE 25%) Gas production averaged 107 TJ per day AWEs share of production was 2.4PJ of gas with approximately 2,900 barrels of associated condensate
  9. GOLDMAN SACHS PRESENTATION – Awe Limited – slide 9
    Yemen Al Meashar-1 well (AWE 19.25%) drilled to a A further well nearby the Al Meashar total depth of 3,660 metres and produced oil discovery is planned. from the fractured basement. Increased equity in Block 74 following the…
  10. GOLDMAN SACHS PRESENTATION – Awe Limited – slide 10
    Indonesia Liyun-1 drilled in the Bulu PSC (AWE 25%). Failed to encounter hydrocarbons in the target reef systems. East Lengo-1 was drilled in the East Muriah PSC. AWE did not participate. The well was plugged and abandoned.…
  11. GOLDMAN SACHS PRESENTATION – Awe Limited – slide 11
    Summary Exploration program has disappointed. Some success - Trefoil - Perth Basin - Yemen Base business is performing well. Contingent resources for future development.