    Lundin Petroleum - United Kingdom Capital Market Day Presentation 30th January 2007
  2. CAPITAL MARKET DAY PRESENTATION – Lundin Petroleum – slide 2
    UK Northern North Sea Asset Location Otter Nor UK THISTLE way Eider 16 1 b Tern Hudson 2 Statfjord aS a Melville 211/28b 28b 2 29F F1 Hutton HEATHER North Terrace c 1 Strathspey 4a 5F1 5 Lyell 4b…
  3. CAPITAL MARKET DAY PRESENTATION – Lundin Petroleum – slide 3
    Thistle 2005 to 2007 Improving Performance Plant stability investment Water injection capability now in excess of 150,000 bwpd Power generation reliability Increasing oil production Average water injection rate 2007 forecast…
  4. CAPITAL MARKET DAY PRESENTATION – Lundin Petroleum – slide 4
    Heather 2005 to 2007 Improving Performance Plant stability investment Water injection capacity now in excess of 55,000 bwpd Heather injection shut in during Triassic drilling Process uptime Average water injection rate 2007…
  5. CAPITAL MARKET DAY PRESENTATION – Lundin Petroleum – slide 5
    Broom 2005 to 2007 Improving Performance Recovery from April low Stable water injection at 45,000 bwpd Oil production ahead of forecast Average water injection rate 2007 forecast Produced water rate 2007 injection forecast Actual…
  6. CAPITAL MARKET DAY PRESENTATION – Lundin Petroleum – slide 6
    Thistle Redevelopment 7a 8a 6b 5 Nor MAGNUS NORTH WEST UK way Magnus 6c PENGUIN CLUSTER 11a a 13a 13 a 12 2a 14 4 033 12b 13b 6a Don West 18a 18 18 8aF4 Don 9d 18c PLAYFAIR 1 17 THISTLE 19a 9b…
  7. CAPITAL MARKET DAY PRESENTATION – Lundin Petroleum – slide 7
    Thistle Redevelopment Value Creation 409 MMboe produced STOIIP 846 MMboe No drilling since 1990 No active reservoir management since 1990s Water injection critical Lundin Petroleum commitment to Thistle regeneration in May 2006…
  8. CAPITAL MARKET DAY PRESENTATION – Lundin Petroleum – slide 8
    Thistle Redevelopment Potential Third Party Business 7a 8a 6b 5 Nor MAGNUS NORTH WEST West Don UK way Magnus 6c Subsea tie back PENGUIN CLUSTER 11a 12a 13a Active tari negotiations 14 033 Targeting late 2008/ early…
  9. CAPITAL MARKET DAY PRESENTATION – Lundin Petroleum – slide 9
    Securing the Thistle Upside in 2007 Ongoing redevelopment investment Subsurface detective work with existing data 2007 seismic shoot 2007/8 revamp of Thistle reservoir model Reactivation of drilling package Preparing for 2008…
  10. CAPITAL MARKET DAY PRESENTATION – Lundin Petroleum – slide 10
    Heather Development and Production Hub 21a 21 1aF aF1 25d 22b 24a 21b 25b MELVILLE 26b CORMORAN 210 F1 211 211 29 30 26c HUTTON 27a a 2 26a 26 26d PELICAN 27e Heather 1c c 5F1 4a LYELL 4b 5 2F1 2F 1…
  11. CAPITAL MARKET DAY PRESENTATION – Lundin Petroleum – slide 11
    Heather Development and Production Hub Value Creation 131 MMboe produced STOIIP 507 MMboe Broom host Drilling facilities reactivated Life extension investment Greater Heather area 3D seismic shot in 2006 Ongoing Projects…
  12. CAPITAL MARKET DAY PRESENTATION – Lundin Petroleum – slide 12
    Heather Development and Production Hub 21a 21 1aF aF1 25d 22b 24a 21b 25b Melville MELVILLE South West Heather (CR) Lundin Petroleum 55% 26b CORMORAN Brent reservoir tested at 5 Mbopd Sterling 210 21 100 F1 211 211…
  13. CAPITAL MARKET DAY PRESENTATION – Lundin Petroleum – slide 13
    Securing the Heather Upside in 2007 Ongoing life extension investment Subsurface detective work integrating new 3D seismic 2007 revamp of Heather reservoir model Generating Heather inll candidates Preparing for 2008 workover…
  14. CAPITAL MARKET DAY PRESENTATION – Lundin Petroleum – slide 14
    Broom First oil August 2004 20 MMbbls produced 3D seismic shot in 2006 Contracted GSF Arctic II Heather Alpha for next 2 wells 6 Gas Import BROOM FIELD* SSIV Manifold Water Injector West 16 ndle Heather 7 km Bu O il…
  15. CAPITAL MARKET DAY PRESENTATION – Lundin Petroleum – slide 15
    Broom Ongoing Projects First oil August 2004 2007 revamp of Broom reservoir 20 MMbbls produced model integrating new seismic 3D seismic shot in 2006 Installation of water handling equipment on Heather Contracted GSF Arctic II…
  16. CAPITAL MARKET DAY PRESENTATION – Lundin Petroleum – slide 16
    UK - Exploration 213 211 Thistle/Deveron 211/28b 6005 6004 207 3/1b 0029 0029 002 0 029 2007 Drilling Activity 205 206 176 204 Heather/Broom 002 002 003 0030 12/17b Lundin Petroleum (P1301) 9/10b 010 12/27 Endeavour…
  17. CAPITAL MARKET DAY PRESENTATION – Lundin Petroleum – slide 17
    Licence P1301 Block 12/17b Gross Resources: 40 MMboe 12/17-J1 Prospect Planned Well 12/17-J1 LundinPetroleum interest: 30% Operator: Lundin Petroleum Drilling Date: 3/4Q 2007 Block 12/17b Top Volgian Reservoir WF9235 01.07
  18. CAPITAL MARKET DAY PRESENTATION – Lundin Petroleum – slide 18
    Licence P1399 Block 12/27 Gross Resources: 821 Bcf Delgany 444 Wenvoe 100 Southerndown 166 Carne 70 Delgany Cruit 41 Lundin Petroleum interest: 15% Operator: Endeavour Drilling Date: 3Q 2007 Carne Captain Beatrice…
  19. CAPITAL MARKET DAY PRESENTATION – Lundin Petroleum – slide 19
    Licence P1089 / P1295 Block 14/28a Gross Resources: 408 MMboe Birch/Kopervik 384 Piper 24 Planned Well Lundin Petroleum interest: 10% Operator: OilExCo Drilling Date: 1Q 2007 004 Exploration Assets 010 005 00 05…
  20. CAPITAL MARKET DAY PRESENTATION – Lundin Petroleum – slide 20
    Licence P1107 / P1109 Block 21/8 Gross Resources: 145 MMboe Banchory 41 Banchory East 27 Banchory North 23 Scolty 10 Torphins 28 P1107 & P1109 Belfry 16 Lundin Petroleum interest: 40% Operator: Lundin Petroleum Torphins (pal)…
  21. CAPITAL MARKET DAY PRESENTATION – Lundin Petroleum – slide 21
    Licence P1129 Block 41/10 Gross Resources: 762Bcf Lytham 295 Haupt 93 St.Annes 164 String Of Pearls 210 St. Annes Prospect Lundin Petroleum interest: 25% Operator: Lundin Petroleum Lytham Prospect Drilling Date: 3Q 2007…
  22. CAPITAL MARKET DAY PRESENTATION – Lundin Petroleum – slide 22
    UK Exploration Drilling Schedule 2007 UK Likely Drilling Schedule 2007 Country Licence Net Interest Operator Q1 Q2 Q3 Q4 UK P1399 15% Endeavour P1129 25% Lundin P1301 30% Lundin P1109 & P1107 40% Lundin P1089 & P1295…
  23. CAPITAL MARKET DAY PRESENTATION – Lundin Petroleum – slide 23
    UK 2007 Exploration Budget 2007 Wells Licence Block Equity Operator P1301 12/17b 30 Lundin Petroleum P1399 12/27 15 Endeavour P1089 & P1295 14/28a 10 OilExCo P1107 & P1109 21/8 40 Lundin Petroleum P1129 41/10 25 Lundin…