FPSO progress – BG Group

BG Group · Feb 27, 2012 · 15 slides

Investor presentation from the Shale Experts oil & gas presentation and slide database. Every page is imaged and its text indexed for search across operators, plays, basins and time.

Slides

  1. FPSO progress – BG Group – slide 1
    FPSO progress Steve Ollerearnshaw VP Projects Geraldo Falcao Banco de Imagens Petrobras
  2. FPSO progress – BG Group – slide 2
    FPSO progress Key messages Fast track developments Modular approach to production On track to deliver 2.3 mmboed of FPSO capacity by 2017 in Phase 1 FPSO 1 performing better than expected FPSOs 2-5 on schedule and lower unit…
  3. FPSO progress – BG Group – slide 3
    FPSO progress Initial FPSOs already committed Committed FPSOs Oil Gas Rio de Janeiro kbod mmscfd Module Onstream 1 Lula Leased 100 176 2010 2 Sapinhoa South Leased 120 176 2013 3 Lula NE Leased 120 176 2013 4 Sapinhoa North…
  4. FPSO progress – BG Group – slide 4
    FPSO progress FPSO strategy Phase 1 field development: 13 FPSOs Processing capacity of 2.3 million boed by 2017 FPSOs 1-5, leased FPSOs Shorter lead time to first oil Could be committed one unit at a time FPSOs 6-13, owned…
  5. FPSO progress – BG Group – slide 5
    FPSO progress FPSO 1 performing better than expected Offloading from the FPSO CAR 3 producer wells connected to FPSO Exceptional well deliverability Approaching 90 kboed Bring fourth well onstream in 2012 15 mmboe gross…
  6. FPSO progress – BG Group – slide 6
    FPSO progress FPSO 2 FPSO 2 Production unit Sapinho South Name Cidade de So Paulo Contractor Modec/Schahin Oil production 120 kbopd Gas production 176 mmscfd Hull conversion China Topsides integration BrasFELS, Brazil Hull…
  7. FPSO progress – BG Group – slide 7
    FPSO progress FPSO 3 FPSO 3 Production unit Lula NE Name Cidade de Paraty Contractor SBM/Queirz Galvo Oil production 120 kbopd Gas production 176 mmscfd Hull conversion Singapore Topsides integration BrasFELS, Brazil Hull…
  8. FPSO progress – BG Group – slide 8
    FPSO progress FPSO 4 FPSO 4 Production unit Sapinho North Name Cidade de Ilhabela Contractor SBM/Queirz Galvo Oil production 150 kbopd Gas production 211 mmscfd Contract awarded in August 2011 Hull conversion is being…
  9. FPSO progress – BG Group – slide 9
    FPSO progress FPSO 5 FPSO 5 Production unit Cernambi South Name Cidade de Mangaratiba Contractor Modec/Schahin Oil production 150 kbopd Gas production 281 mmscfd Contract awarded in September 2011 Hull conversion is being…
  10. FPSO progress – BG Group – slide 10
    FPSO progress Lower cost per unit of production Cost per unit of production ) 100% 50% 0% FPSO 2 FPSO 3 FPSO 4 FPSO 5 11
  11. FPSO progress – BG Group – slide 11
    FPSO progress FPSOs 6-13 exceeding LC requirement Dedicated 8 FPSOs for BM-S-9 and 11 Over 40% contracted Costs in line with international benchmarks Fully contracted in 2012 FPSO 6: welding of hull underway LC requirement for…
  12. FPSO progress – BG Group – slide 12
    FPSO progress Eight domestic FPSOs Eight replicant FPSOs Standard design and a common construction strategy One hull fabricator and five separate topsides module fabricators Three separate integration sites Increased local…
  13. FPSO progress – BG Group – slide 13
    FPSO progress Eight FPSOs contracts awarded Hulls EPC Engevix Engenharia Topsides FEED Doris Engenharia Automation and controls Altus Sistemas de Informatic Turbo generators Rolls Royce Energy Systems Compressors Dresser Rand…
  14. FPSO progress – BG Group – slide 14
    FPSO progress Key messages Fast track developments Modular approach to production On track to deliver 2.3 mmboed of FPSO capacity by 2017 in Phase 1 FPSO 1 performing better than expected FPSOs 2-5 on schedule and lower unit…
  15. FPSO progress – BG Group – slide 15

From the store