Do It Right From the Start Focus on long-term value from the beginning Hire quality people, and support them with the tools they need to be successful Acquire contiguous acreage in the right basin Collect quality data at the right…
Contiguous Acreage Position With High Working Interest 179,722 Gross/149,141 net acres1 4.3 billion barrels of resource potential on 7,700 identified locations 3,200 operated Development Ready Hz locations with 90% average WI…
Permian Asset Extensive Technical Database Technical database consisting of whole cores, sidewall cores, single-zone tests, open-hole logs, 3D seismic and production logs Provides the building blocks for identification of resource…
Regional Cross-Section 1 1 2 3 4 5 6 7 8 9 10 2 North South 3 Upper 4 Spraberry 5 6 7 Lower Spraberry 8 UWC 9 MWC 10 10 MILES LWC Flattened on the Middle Wolfcamp Canyon 500 Cline Strawn - GAMMA RAY ABW -…
Location(s), Location(s), Location(s) Concentrated multi-zone horizontal development Laredo Petroleum has categorized its horizontal drilling inventory utilizing the following classifications: De-Risked Development Ready Locations…
Earth Model Objectives Standard Wellbore 1 Select Landing Point 2 3 4 6 2 Geosteering (stay in zone) 3 Frac Design 5 & Spacing 4 Frac 1 Barrier 5 Lateral Length 6 Earth Model potential to optimize development &…
Contrasting Upper Wolfcamp Lookback Examples Above Type Curve Below Type Curve Projected 90-day Cumulative Oil: 47,000 BO Projected 90-day Cumulative Oil: 24,636 BO 7,741 Lateral Length Actual 7,257 Lateral Length 90-day Percent…
Potential Upper Wolfcamp Economic Uplift Implications 7,500 Upper Wolfcamp Multi-Well Pad Type Curve 50% 40% Earth Model demonstrates increases in Earth Model Potential 90-day cumulative oil production ROR % 30% Upper…
Contiguous Acreage Enables Efficient Development Regan North development program Example of a development ready corridor LPI leasehold containing at least 450 future locations with an 98% average working interest1 1 As of…
Multi-Well Pad Savings 500,000 450,000 400,000 Completion 350,000 Savings per well 300,000 250,000 200,000 150,000 Drilling 100,000 50,000 - 2-Well Pad 4-Well Pad Rig moves Location Drill pipe handling Frac…
Growing Production with Greater Efficiencies Delineation Development Testing Development Transition to Single-Well Pads Multi-Well Pads Multi-Well Pads 50 45 40 35 30 MBOE/D 25 20 15 10 5 0 1Q-11…
Drilling & Completion: Service Cost Reductions D&C AFE Components Rentals Cement 5% 3% Drilling Rig Completion 10% Services 34% 15% - 20% cost reductions to date D&C Fluids from service costs 13% D&C Tangibles Other +…
Improved Drilling Efficiencies Cline Best Composite Well 0 1,000 2013 Composite well goals 2,000 Continuous improvement 3,000 2014 Identification of best practices 4,000 2015 Implementation of best practices 5,000 6,000…
Production Corridor Implementation: Reagan North Oil Takeaway Pipeline Oil Gathering Station Plains to Midland Oil Gathering Line Gas Lift Compression Facility Oil Takeaway Pipeline Medallion to Colorado City Gas…
Reagan North Corridor Per well estimated benefits of corridor investment (capital savings, LOE savings and price uplift) Natural gas for rig fuel, displaces higher cost diesel 37,500 Approximately 40% total investment pays out…
Medallion Crude Oil System Overview Medallion facilities Wolfcamp Connector: 3rd-party dedications 100% Active: 60 miles of 12 LPI leasehold Laredo Acreage Capacity: 140,000 BOPD Active October 2014 Medallion pipelines lateral…
Increased Financial Flexibility Borrowing Base Decreased total debt 675 MM 1,200 Reduced annual interest payment 40 MM 1,000 Extended first maturity to seven years 800 MM 600 Reduced weighted-average cost of long-term 400…
2015 Capital Program Bringing capital in balance to cash flows 50% reduction in capital budget 80% of capital focused on drill & complete costs Drill & complete Additional service cost savings could Facilities reduce outspend…
Self-Fund a Growing Percent of Capital Expenditures 90% 80% 70% % of Capital Self-funded1 60% 50% 40% 30% 20% 10% 0% 2012 2013 2014 2015P Laredo remains committed to self-funding a growing percent of our capital…
2015 Estimated Production Growth 45 40 35 30 MBOE/D 25 20 15 10 5 0 2011 2012 2013 2014 2015P Avg. Daily Production1 Estimated Avg. Daily Production2 1 Quarterly production numbers prior to 2014 have been…
Flexibility in Face of Commodity Price Decline Laredo took immediate and decisive action to structure the Company for a low-price environment 105 95 85 Aligning cash flows and capital expenditures LPI Hedge Floor: 81/Bbl 75…
Laredo has . . . Strong Board and management team with highly experienced employee base High-quality, contiguous acreage across its large leasehold Deep inventory of data-supported locations in stacked zones Growing and valuable…