2015 Development Program Dawson Bordon Jones Holton 101H 68gross(64net)wellstobedrilled Jones Holton 201H Smith SN 4837 101H 57gross:lateralsof6,700and Jones Holton 401H 7,500;GlasscockandMartin Wilbanks SN 1615 101H counties Howard…
REFLECT EFFICIENCIES PLUS DRILLING AND SERVICE COST REDUCTIONS MIDLANDBASINDEVELOPMENTWELLS(MM) Current EOYTarget OriginalBudget South North South North Wolfcamp A(7,500'lateral) 6.1 6.3 5.9 6.1 Wolfcamp B(7,500'lateral) 6.3 6.5 6.0…
GLASSCOCK COUNTY WOLFCAMP A/B TYPE CURVE NORMALIZED TO 7,000 (UNRISKED) 1,000 NormalizedGrossProductionRate(boepd) 100 EURsforWolfcamp A/Bdevelopment wellsinGlasscockCo.,MidlandBasin 850MBOEfor7,500lateral…
WOLFCAMP A/B WELL RESULTS COMPARED TO NORMALIZED 7,000 TYPE CURVE 10,000 NormalizedGrossProductionRate(boepd) 1,000 100 Productionnormalizedfor7,000 lateralandoperationaldowntime Day0=PeakDay 10 0 30 60 90 120 150…
2,127 POTENTIAL WOLFCAMP/CLINE LOCATIONS Martin Co. Glasscock Co. 8,010 UpperSpraberry 6,113 PotentialWells* 8,523 LowerSpraberry 6,619 4,400 6,700 7,500 9,328 Dean 7,525 9,550 Wolfcamp A 7,698 350 155 159 (66,333netacres) 9,879…
2015 Drilling Program New Mexico Texas Wolfcamp Focusonretainingleases Winkler Loving 36.8MMtoextend certainleases Winchester 5710 1H Drill6gross(6net)Tier1 University 2821 1H wellsand2gross(2net) Tier2wells Langley 236 1H…
REFLECT EFFICIENCIES PLUS DRILLING AND SERVICE COST REDUCTIONS DELAWAREBASINEXPLORATORYWELLS(MM) Paddrilling SingleWell Current OriginalBudget Development PadTarget WellTarget Wolfcamp A&B(4,500'West) 8.3 8.1 7.5 Wolfcamp…
REFLECT EFFICIENCIES PLUS DRILLING AND SERVICE COST REDUCTIONS SANJUANBASINEXPLORATORYWELLS(MM) Current OriginalBudget Mancos(4,500'SouthCentral) 5.1 6.5 Mancos(4,500'EastandWest) 5.5 NOTES:…
POTENTIAL BY COUNTY (unrisked, 660-foot spacing, 4,400/6,700/7,500 lateral lengths, engineered locations) Wolfcamp A Wolfcamp B Wolfcamp C Cline Net Net Net Net NetAcres NetAcres NetAcres NetAcres Locations Locations Locations…
POTENTIAL BY TIER & COUNTY (unrisked, 880-foot spacing, 4,400 lateral lengths, engineered locations) Wolfcamp A Wolfcamp B Wolfcamp BC Wolfcamp C Net Net Net Net NetAcres NetAcres NetAcres NetAcres Locations Locations Locations…
POTENTIAL BY COUNTY (unrisked, 1,320-foot spacing, 4,400 lateral lengths, engineered locations) Mancos Formation NetLocations NetAcres Southwest 125 20,154 South Central 53 8,609 Southeast/Jicarilla 387 62,290 Total 565 91,053 23
Peak 24-Hour IP Peak 30-day Average Completed Frac Well County Zone Lateral Stages Oil NGL Gas Oil NGL Gas Length Boepd Boepd (Bopd) (Bpd) (Mcfd) (Bopd) (Bpd) (Mcfd) Lavaca38101H Glasscock A 4,132 17 861 519 192 898 699 417 159…
Com- Peak 24-Hour IP Peak 30-day Average pleted Frac Well County Zone Lateral Stages Oil NGL Gas Oil NGL Gas Boepd Boepd Length (Bopd) (Bpd) (Mcfd) (Bopd) (Bpd) (Mcfd) JonesHolton 101H Martin WCA 6,675 27 1,171 842 190 836 843 630…
Peak 24-Hour IP Peak 30-day Average Completed Frac Well County Zone Lateral Stages Oil NGL Gas Oil NGL Gas Length Boepd Boepd (Bopd) (Bpd) (Mcfd) (Bopd) (Bpd) (Mcfd) University28211H Winkler A 4,121 16 969 720 137 672 653 482 94…
Peak 24-Hour IP Peak 30-day Average Completed Frac Well County Zone Lateral Stages Oil NGL Gas Oil NGL Gas Length Boepd Boepd (Bopd) (Bpd) (Mcfd) (Bopd) (Bpd) (Mcfd) University16171H Ward B 4,808 20 1,896 1,483 214 1,191 1,081 797…
Peak 24-Hour IP Peak 20-day Average Completed Frac Well Area Lateral Stages Oil NGL Gas Oil NGL Gas Length Boepd Boepd (Bopd) (Bpd) (Mcfd) (Bopd) (Bpd) (Mcfd) South Chaco230809A145H 4,500 14 1,155 717 225 1,275 752 466 147 829…
County WC A WC B WC C Spraberry Notes Glasscock 1 2 1 1 3w/10,000laterals Martin 2 0 0 4 Midland 1 1 0 1 Howard 0 0 0 1 TOTALMIDLAND 4 3 1 7 County WC A WC B WC BC WC C Notes Tier1 1 5 0 0 Tier 2 1 1 0 0 1w/7,500lateral TOTAL…