Skip to main content Q4 2012 Supplemental Information – Noble Energy, Inc. Investor Presentation | Shale Experts
Loading...

Q4 2012 Supplemental Information – Noble Energy, Inc.

Noble Energy, Inc. · Feb 7, 2012 · 15 slides

Investor presentation from the Shale Experts oil & gas presentation and slide database. Every page is imaged and its text indexed for search across operators, plays, basins and time.

Slides

  1. Q4 2012 Supplemental Information – Noble Energy, Inc. – slide 1
    Fourth Quarter 2012 Supplemental Information
  2. Q4 2012 Supplemental Information – Noble Energy, Inc. – slide 2
    Key 4Q Highlights and Messages Excellent finish for 2012, momentum going into 2013 All Core Areas Contributed to Record Quarterly Sales Volume* 4Q up 10% versus 3Q, adjusted for property sales Liquids reached a record 120 MBbl/d,…
  3. Q4 2012 Supplemental Information – Noble Energy, Inc. – slide 3
    Financial Metrics Quarter and year improvements Sales Volumes Cont. Ops. Adj. Earnings Cont. Ops. (MBoe/d) (Per Share) 242 255 1.65 224 1.55 0.93 4Q 2011 3Q 2012 4Q 2012 4Q 2011 3Q 2012 4Q 2012 Disc. Cash Flow Cont. Ops.…
  4. Q4 2012 Supplemental Information – Noble Energy, Inc. – slide 4
    Liquids Sales Volumes Approaching 50% of total sales 4Q Liquids Volumes, Year Change Total 120 MBbl/d, Up 40% DJ Basin 51 MBbl/d, Up 34% DW GOM 21 MBbl/d, Up 110% West Africa 42 MBbl/d, Up 68% MBbl/d % Total 125 50 100 40 75…
  5. Q4 2012 Supplemental Information – Noble Energy, Inc. – slide 5
    2012 Proved Reserves Changes Replaced 136 percent of production MMBoe 1,500 Net Additions = 121 1,400 218 1,300 23 94 26 1,209 1,200 Adds (MMBoe) 1,184 DJ Basin 149 89 57 Marcellus 56 1,100 Tamar 7 Other 6 Total…
  6. Q4 2012 Supplemental Information – Noble Energy, Inc. – slide 6
    Onshore Horizontal Developments Delivering excellent results MBoe/d DJ Basin Net Production MMcfe/d Marcellus Net Production 100 15% QoQ 30% YoY Growth 150 19% QoQ 64% YoY Growth 80 120 60 90 40 60 20 30 0 0 4Q 11 1Q 12…
  7. Q4 2012 Supplemental Information – Noble Energy, Inc. – slide 7
    Optimizing DJ Basin Resource Recovery Potential for over 30 wells per section Wells Ranch Section 24 First Ever NBL Sim-Ops (drill and North Pad Niobrara A, Niobrara B, Codell complete concurrently) 5 Wells All 15 Wells Completed…
  8. Q4 2012 Supplemental Information – Noble Energy, Inc. – slide 8
    Extended-Reach Laterals Generating outstanding results Three Wells Online and Performing Above Expected Type Curve Avg. lateral lengths 9,100 ft. Six More Wells Drilled in 4Q Boe/d 3 with 9,000 ft. laterals 1,400 3 with 7,000…
  9. Q4 2012 Supplemental Information – Noble Energy, Inc. – slide 9
    Northern Colorado Niobrara Leveraging expertise to unlock new opportunity Superior Economics Wyoming Nebraska in East Pony with 80% Oil East Pony Three Well 80-Acre Pilot Keota Plant Yielding Best Results to Date Lilli Plant…
  10. Q4 2012 Supplemental Information – Noble Energy, Inc. – slide 10
    Marcellus Wet Gas Activity Ramping up liquids-rich production Majorsville Washington County NBL JV Area PA OH SHL1,3,6 WFN1: 7-well Producing Pad Drilling SHL 8: 10-well Pad Drilling Majorsville WEB 4: 11-well Pad…
  11. Q4 2012 Supplemental Information – Noble Energy, Inc. – slide 11
    Price Uplift for Wet Gas Nearly doubles value to over 7 per Mcf of wellhead gas /Mcf 8 7.10 15 Bbl/MMcf condensate at 80% WTI 6 50 Bbl/MMcf NGLs at 55% WTI 4 3.60 1,050 1,130 MMBtu residue gas 2 MMBtu (includes ethane)…
  12. Q4 2012 Supplemental Information – Noble Energy, Inc. – slide 12
    Rio Grande Area Big Bend and Troubadour Significant oil potential and near-term impact Rio Grande Area Gross Resources NBL Operated P75 P25 (MMBoe) Big Bend (WI 54%) 30 65 Troubador (WI 87.5%) 20 60 Total (WI 70%) 46 112…
  13. Q4 2012 Supplemental Information – Noble Energy, Inc. – slide 13
    Tamar Project Platform, jacket and deck installed Tamar Jacket Launch Tamar Platform Installed Jacket 14
  14. Q4 2012 Supplemental Information – Noble Energy, Inc. – slide 14
    Carla Development Next development and new discovery Estimated Gross Resources 36 136 MMBoe (P75 P25) Carla North Appraisal Drilling and Testing Ongoing Carla O7 Planning to Sanction in 2013 1-GI Alen Pilot Carla South…
  15. Q4 2012 Supplemental Information – Noble Energy, Inc. – slide 15

From the store

Browse maps, data & reports in the Shale Experts store