Production Uplift 40,000 BOE/d Actual / Forecast IP Well Name 2Q FY12 3Q FY12 4Q FY12 1Q FY13 BOE/d Net Sunny 1,200 Winters 6,400 Magnum 800 Onyx Recompletes Camshaft Miller Costello 5,000 2,550…
Total Liquidity Total Liquidity (MM) 700 Pref. Dividend 600 Bond Interest 500 400 300 Total Cash Revolver Availability 200 Revolver Fully Undrawn Total Liquidity (60 day MA) 100 0 1/1/2011 4/1/2011 7/1/2011…
3Q FY 2012 Operational Highlights 9
MP 72 LP-1G Sand Development Onyx Log LP-1G Sand Structure Map C-12 C-2 120 Feet of Water Sands at 4,900 TVD Currently Producing 5,700 BOE/d Gross LP-1G Sand has Produced 564 MBbls Oil Since June 2011 recompletions began…
South Timbalier 54 Camshaft Camshaft Log G-9A Sand Structure Map G-6B G-7 Camshaft G-7A G-8 Drilled to 11,575 TVD / 12,743 MD G-9A Logged 177 Net Pay in the G-6B, G-7, G-7A, G-8 and G-9A Sands Completed as a Dual in…
Grand Isle 16 Costello Finds Updip Oil C-4 Sand Structure Map Costello Log C-4 Sand C-4 C-4 C-4A Drilled to 13,105 MD / 11,849 TVD Encountered 279 MD Total Net Pay; 169 in the Primary Target C4 Sand, 110 of MD Net Pay in…
West Delta 73 Miller Miller Log PLIOCENE F-45 SAND STRUCTURE MAP F30 F35 MILLER F40 Currently Completing as a Dual in F-30 and F-35 with 2 Alternatives in Lower F-35 and F-40 F45 Total Depth: 8,510 TVD / 8,960MD First…
Davy Jones 1 Summary Davy Jones 1 Log Drilled and Cased to 29,122 MD Attempted to Perforate Wilcox F Sand with TCP Guns Gun System Failure Thru-Tubing Perforated Wilcox C and D Sands Initial Positive Pressure Response Small…
Q&A 15
Contact NASDAQ: EXXI AIM:EXXI www.energyxxi.com Stewart Lawrence, IRO Greg Smith, Director of IR Energy XXI (Bermuda) Limited Energy XXI (Bermuda) Limited 1021 Main Street, Suite 2626 1021 Main Street, Suite 2626 Houston, Texas 77002…