Investor Presentation Enercom Oil and Gas Service Conference NASDAQ: EXXI AIM:EXXI www.energyxxi.com February 21-23, 2012 2/17/12
Highlights The 3rd Largest Producer on the Major EXXI Fields Gulf of Mexico Shelf 72% of Production is Oil Operate 6 of the 11 Largest Oil Fields on the Gulf of Mexico Shelf Proved Reserves Increased 54% to 116.6 MMBOE in Fiscal…
Strong Focus 72% Crude Energy XXI operates 6 of the 11 largest oil fields on the West Delta 73 4,400 BOE/d 4,050 West Delta West Delta 30 3,000 BOE/d 3,800 BOE/d 30 Gulf of Mexico shelf Grand Isle Grand Isle 16, 16, 18 18…
Continued Reserve Growth Yearly Proved Reserves Growth Yearly 3P Reserves Growth 116.6 196.2 75.6 104.1 53.1 81.7 2009 2010 2011 2009 2010 2011 Crude Gas Crude Gas 5
Low Cost Development of 3P Reserves 3P: 196 MMBOE POSS DEV POSS 4 MMBOE UNDEV 3.41/BOE 30 MMBOE 4.98/BOE PDP PROB 60 MMBOE UNDEV 30 MMBOE 6.99/BOE PUD PROB DEV 35 MMBOE PDN 16 MMBOE 11.69/BOE 22 MMBOE 2.39/BOE 7.25/BOE…
Consistently Improving Balance Sheet EBITDA (MM) Net Income (MM) 97 250 225 100 200 80 150 60 107 100 40 50 20 11 0 0 Dec 10 Mar 11 Jun 11 Sep 11 Dec 11 Dec 10 Mar 11 Jun 11 Sep 11 Dec 11 Net Debt (MM) Net Debt / Total Cap…
Current Rig Activity = 25% of GOM Shelf Activity Grand Isle 16 Hercules 201 Rig Winters Completing West Delta 73 Nabors P-17 Magnum Grand Isle 16 Drilling Ensco 90 Cameron Parish, LA Multi-well Development Program Unit 201…
Energy XXI Rig Schedule Field Dec-11 Jan-12 Feb-12 Mar-12 Apr-12 May-12 Jun-12 Jul-12 Aug-12 South Marsh Island 230 Davy Jones Rowan EXL 3 West Delta 73 Magnum Miller Nabors P-17 Main Pass 60 Bullfrog Hercules 205 Grand Isle 16…
Multi-Year Drilling Inventory 201215 FY 2012 2013 2014 2015 95+ Additional Opportunities Identified for 2016 and Beyond Sunny (R22ST) Pontiff 2 Hyden Pud* Glendullan* Maroon Pud* Quinto Lancer* EI 330 (5 wells) Traynor Torrey* Brahma,…
Operations Overview 14
Oil Production Increases 40%* 25 20 Thousand Barrels per Day 7.6 15 6.1 6.5 6.1 10 13.8 12.0 5 9.9 10.3 0 3Q F11 4Q F11 1Q F12 2Q F12 MBbl/d Crude MBOE/d Gas *Production values are NET and refer to ExxonMobil…
Main Pass Complex 100% WI Gross Field BOE/d Ashton and Onyx Wells Re- 18000 Defined Salt Model 16000 12,000 BOE/d Both Wells Tested Salt 14000 Flanks Updip to Production 12000 10000 Ashton TDd at 8,353 TVD 8000 and Encountered Seven…
Grand Isle 16 Well Activity Gross Field BOE/d 7,000 5,300 BOE/d 6,000 Successfully Recompleted 10 Wells 5,000 EXXI Plan To Spud Costello February 2012 acquired operations 4,000 Current Production: 5,200 BOEPD 3,000 2,000…
Grand Isle 16 Winters Winters Well Log K-2 Sand K-2 Sand Structure Map LKG -16,564 Winters Salt Drilled to 17,400 MD / 16,547 TVD Encountered 83 Net Pay in K-2 sands Planned IP = 20 MMcf/d Net First Production…
Grand Isle 16 Costello C-4 Sand Structure Map Costello Type Log C-4/C- 4A Sands Rig Scheduled February 2012 Single Completion Targeting the C-4/C-4A Sands With Two Packs Planned TD = 12,883 MD Planned IP = 1,000 BOE/d First…
West Delta 73 - Well Activity Gross Field BOE/d 7,000 EXXI acquired operations Compressor 4 PUD Development Wells with Planned Repairs 6,000 4,400 IP of 3,250 BOE/d Net BOE/d 5,000 1 Exploration Well with Planned IP of 4,000…
West Delta 73 Magnum MAGNUM LOG F-35 SAND STRUCTURE MAP F30 -7893 OO/W -7960 MAGNUM F35 -8000 Drilled to 8,500 TVD F40 Oil Accumulations Found in F-30, F-35 and F-40 60 Net Oil Pay -8207 OO/W -8265 -8236 Planned…
West Delta 73 Miller WD 73 TYPE LOG PLIOCENE F-45 SAND STRUCTURE MAP MMR 2 PTD 23,100 A Rob L Operc F Sds MILLER Time Slice Level (Gyrodina) F45 Expected Spud March 2012 Primarily Targeting the F-45 Sand;…
West Delta 73 Golden Bear WD 73 C-38st2 K-30 STRUCTURE / AMPLITUDE MAP Currently scheduled for April 2012 Proposed TD: 14,100MD / 12,900TVD 98 BCF; 2 MBO Reserve Potential: 56 BCF Planned IP: 30 MMCF/d 23
South Timbalier 54 Well Activity Gross Field BOE/d 6,000 EXXI acquired operations August 9th 4,600 3-well Program with Planned IP of BOE/d 5,250 BOE/d 5,000 4,000 1 Gas Well (Exploration) 3,000 2 Oil Wells (Development) 2,000…
South Timbalier 54 Camshaft Camshaft Type Log G-9A Sand Structure Map Camshaft Currently Drilling Below 10,500 Drilling to 12,000 TVD to Target the G-6B, G-8, G-9A Sands Plans are to Dual-Complete the G-9A and G-8 Sands…
Probing the Depths 26
Ultra-Deep Well Summary Davy Jones 1 Blackbeard West SMI Block 230 ST Block 168 20 water 80 water Blackbeard West 2 SS Block 188 Davy Jones Offset 72 water SMI Block 234 20 water Lafitte Blackbeard East 1 EI Block 223…
Davy Jones 1 Well Design Update Mud Motor Recovered 5 Liner Cleaned Out to 29,800 Drilling Mud Displaced With Completion Fluid Set Bridge Plug; Logged w/PNL Remaining Operations Run and set perforating guns Run tubing and install…
Blackbeard Summary Located in 85 Feet of Water Blackbeard West - Shallow Blackbeard West Blackbeard East Spud on November 25, 2011 Identified 4 hydrocarbon bearing Drilled to 33,882 (new record) Drilling below 17,200 sands in…
Lafitte Summary Located at Eugene Island Block 223 in 140 NE SW of water Very Large 3-way Structure / 2,000 Column Potential Targeting Miocene, Frio & Sparta Sections Current Depth Drilling ahead 33,500 33,500 Target = Sparta…
Ultra-Deep Resource Potential* Gross EXXI Prospect Sand Age Resource Net Resource Potential (Tcfe) Potential (Tcfe) Wilcox 3.88 0.48 Davy Jones 1 and 2 Tuscaloosa 0.39 0.05 Lower Cretaceous 0.35 0.04 Miocene 0.90 0.15 Blackbeard…
Key Investment Highlights % Oil Production 70% 69.1% 69.5% 65.9% 67.1% 68.5% 71.6% 3rd Largest Producer on the Gulf 60% of Mexico Shelf 50% 72% of production is oil Sep 10 Dec 10 Mar 11 Jun 11 Sep 11 Dec 11 Large resource…
Contact NASDAQ: EXXI AIM:EXXI www.energyxxi.com Stewart Lawrence, IRO Greg Smith, Director of IR Energy XXI (Bermuda) Limited Energy XXI (Bermuda) Limited 1021 Main Street, Suite 2626 1021 Main Street, Suite 2626 Houston, Texas 77002…
Addendum 34
Energy XXI: Growing Larger and Stronger Production (MBOE/d) Reserves (MMBOE) 50 140.0 42.7 116.6 120.0 40 54% 100.0 29.4 75.6 30 20.9 80.0 Growing 60.0 20 40.0 Production 10 20.0 0 - Replacing FY 2Q 2010 FY 2Q 2011…
Results Fiscal Year to Date Capital Spent BOE/d IP Average Payout 1H FY2012 Sunny 10.2 1,500 8.0 SP 89 Recompletion 18.5 5,380 3.6 Program GI 16 Recompletion 30.6 6,110 7.3 Program Total 59.3 12,990 6.3 42
Blackbeard East Summary Blackbeard West Located in 85 Feet of Water TD Very Large 3-way Structure / 2,500 Column Potential Final TD 33,882MD/ 33,318TVD Structural Cross Section Through Blackbeard Complex Logged Pay…
Blackbeard West 2 Summary ST 168 Unit Ship Shoal South Timbalier Located in 75 Feet of Water BBW 3 BBW A Large 3-way Structural Closure Younger Miocene Pay Underneath and Adjacent to a Salt Zones Weld PTD 26,000TVD…
Barataria - Lafitte - Captain Blood Cross Section Barataria EAST Lafitte Captain Blood SOUTH WEST Drilling +9.85 - Miles +15.2 - Miles S A LT SALT Salt Weld -20,000 -20,000 Salt TD 32,997 Current TD 24,900…