Skip to main content May 2015 Corporate Presentation – Crescent Point Energy Corp. | Shale Experts
Loading...

May 2015 Corporate Presentation – Crescent Point Energy Corp.

Crescent Point Energy Corp. · May 6, 2015 · 25 slides

Investor presentation from the Shale Experts oil & gas presentation and slide database. Every page is imaged and its text indexed for search across operators, plays, basins and time.

Slides

  1. May 2015 Corporate Presentation – Crescent Point Energy Corp. – slide 1
  2. May 2015 Corporate Presentation – Crescent Point Energy Corp. – slide 2
    COMPANY SNAPSHOT: CPG (TSX AND NYSE) Market Capitalization 14.3 billion (454.0 million shares fully diluted)(1) Net Debt 3.5 billion(2) Enterprise Value 17.8 billion 2015 Average Production 152,500 boe/d (90% oil weighted)(3)…
  3. May 2015 Corporate Presentation – Crescent Point Energy Corp. – slide 3
    Q1 2015 HIGHLIGHTS Q1 2015 production of 153,500 boe/d, up 18% year-over-year Completed unitization of the first waterflood unit in the Viewfield Bakken resource play April 1, 2015 allowing for accelerated waterflood expansion over…
  4. May 2015 Corporate Presentation – Crescent Point Energy Corp. – slide 4
    THE CRESCENT POINT ADVANTAGE Proven Management Team Proven track record of reserves, production and cash flow growth 5-year weighted average F&D of 19.33 per 2P boe of reserves (2.6 times recycle ratio)(1) 10-year total shareholder…
  5. May 2015 Corporate Presentation – Crescent Point Energy Corp. – slide 5
    BUSINESS STRATEGY Develop and Exploit Increase recovery factors through step-out and infill drilling, waterflood optimization and improved technology Acquire Focus on high-quality, large resource-in-place pools with the potential…
  6. May 2015 Corporate Presentation – Crescent Point Energy Corp. – slide 6
    PROVEN TRACK RECORD 160,000 Production Growth (boe/d) Funds Flow (MM) 3,000 2,500 120,000 2,000 80,000 1,500 1,000 40,000 500 0 0 (1) 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014…
  7. May 2015 Corporate Presentation – Crescent Point Energy Corp. – slide 7
    HEDGING STRATEGY Total Oil Hedges(1) 80,000 58% 70% 2015 average floor price 88/bbl 70,000 60% 2016 average floor price 83/bbl 60,000 Percent hedged 34% 2017 average floor price 81/bbl 50% 50,000 40% bbl/d 40,000 30%…
  8. May 2015 Corporate Presentation – Crescent Point Energy Corp. – slide 8
    FOCUSED GROWTH Strategic positions in four of the largest light to medium oil resource pools in Canada (including Viking)(1) Largest player in the Canadian Bakken, which has the OOIP strongest break-even 5.3 billion barrels…
  9. May 2015 Corporate Presentation – Crescent Point Energy Corp. – slide 9
    VIEWFIELD BAKKEN Q1/15 production 62,000 boe/d CPG Stoughton Rail Terminal First waterflood unit complete 4.6 billion barrels of original oil in place with recovery to date of 3.5%(1) 25-stage cemented liner completion technique…
  10. May 2015 Corporate Presentation – Crescent Point Energy Corp. – slide 10
    VIEWFIELD BAKKEN WATERFLOOD UNITIZATION Completed first unitization of Stoughton Unit 27 net sections in size 105 potential injection wells; 50% of conversions expected to be completed by year-end 2015 Leads to increased pressure…
  11. May 2015 Corporate Presentation – Crescent Point Energy Corp. – slide 11
    VIEWFIELD BAKKEN TECHNOLOGY ADVANCEMENTS Viewfield Bakken Independent type well changes(1) Change in Ultimate Recoverable Reserves (MMboe) (Primary recovery) assigned by Independent Evaluators due to waterflood(2) % change since…
  12. May 2015 Corporate Presentation – Crescent Point Energy Corp. – slide 12
    SHAUNAVON Q1/15 production 25,000 boe/d 17 years in drilling inventory(1) 5.3 billion barrels of original oil in place with recovery to date of 1.0%(2) Latest 25-stage cemented liner technology has improved production rates by up…
  13. May 2015 Corporate Presentation – Crescent Point Energy Corp. – slide 13
    UINTA BASIN Multi-Zone Basin Ouray Valley Gusher Horseshoe Bend Rocky Point Randlett Aurora Blacktail Ridge Greater Monument Butte Lake Canyon Crescent Point Energy lands Q1/15 production 15,000 boe/d 1,300 net…
  14. May 2015 Corporate Presentation – Crescent Point Energy Corp. – slide 14
    FLAT LAKE: TORQUAY (THREE FORKS) & BAKKEN Flat Lake core boundary Torquay edge USA border Flat Lake Torquay lands Viewfield Bakken and SE Saskatchewan conventional lands Recent discovery of 1 billion barrels of…
  15. May 2015 Corporate Presentation – Crescent Point Energy Corp. – slide 15
    BUILDING FREE CASH FLOW ASSETS Viewfield Bakken 1,600 600 Shaunavon 1,200 450 MM MM 800 300 400 150 0 (1) 0 (1) Yr 1 Yr 2 Yr 3 Yr 4 Yr 5 Yr 6 Yr 7 Yr 8 Yr 1 Yr 2 Yr 3 Yr 4 Yr 5 Yr 6 Development Capex Operating…
  16. May 2015 Corporate Presentation – Crescent Point Energy Corp. – slide 16
    MANAGING THE CURRENT ENVIRONMENT Reduce internal costs Partner with vendors to reduce costs CURRENT Improve drilling and capital efficiencies FOCUS Continue efficient allocation of capital with an appropriate drilling program…
  17. May 2015 Corporate Presentation – Crescent Point Energy Corp. – slide 17
    FUTURE GROWTH OUTLOOK Develop and exploit large inventory of economic wells Apply horizontal drilling within emerging Uinta play Advance and grow highly economic Torquay discovery at Flat Lake Increase recovery factors and lower…
  18. May 2015 Corporate Presentation – Crescent Point Energy Corp. – slide 18
    APPENDIX
  19. May 2015 Corporate Presentation – Crescent Point Energy Corp. – slide 19
    PER SHARE FOCUS Production Per Share(1) Reserves Per Share (boe)(1)(3) 360 CAGR 6.7% 2.25 + Yield CAGR 6.2% 2 + Yield 320 1.75 280 1.5 240 1.25 200 (2) 1 2010 2011 2012 2013 2014 2015E 2010 2011 2012 2013 2014…
  20. May 2015 Corporate Presentation – Crescent Point Energy Corp. – slide 20
    PIONEER IN ADVANCING NEW TECHNOLOGY 2008 - 2009 2010 - 2012 2013 - 2014 Completed first cemented liner in the Bakken Expanded waterflood area within the core of the Became the largest driller of horizontal wells in oil resource…
  21. May 2015 Corporate Presentation – Crescent Point Energy Corp. – slide 21
    IMPACT OF TECHNOLOGY IMPROVEMENTS Viewfield Bakken Fresh Water Usage Viewfield Bakken Drilling Progression Spud to Rig Release 900 16.00 800 Water (m3) per well 700 600 12.00 500 Days 400 300 8.00 200 100 0 4.00…
  22. May 2015 Corporate Presentation – Crescent Point Energy Corp. – slide 22
    ACQUISITION HISTORY: RESERVES MORE THAN DOUBLED Initial 2P Estimated Current 2P Total 2P Increase in Reserves Production Reserves Reserves 2P Reserves % Increase Property (Mboe) (Mboe)(1) (Mboe)(1) (Mboe)(2) (Mboe)(3) in Reserves…
  23. May 2015 Corporate Presentation – Crescent Point Energy Corp. – slide 23
    FUNDS FLOW IS A BETTER PROXY FOR PERFORMANCE Peer analysis solely on net income does not account for various non-cash charges such as Crescent Points hedging strategy Crescent Point Energy Corp. (millions) 2014A 2013A Net income 508.9…
  24. May 2015 Corporate Presentation – Crescent Point Energy Corp. – slide 24
    DEFINITIONS 1. Original Oil In Place (OOIP) is equivalent to Discovered Petroleum Initially-In-Place (DPIIP). DPIIP, as defined in the Canadian Oil and Gas Evaluations Handbook (COGEH), is that quantity of petroleum that is estimated,…
  25. May 2015 Corporate Presentation – Crescent Point Energy Corp. – slide 25
    www.crescentpointenergy.com BANKER Bank of Nova Scotia AUDITOR PricewaterhouseCoopers LLP LEGAL COUNSEL Norton Rose Fulbright Canada LLP EVALUATION ENGINEERS GLJ Petroleum Consultants Ltd Sproule Associates Ltd REGISTRAR & TRANSFER…

From the store

Browse maps, data & reports in the Shale Experts store