Antelope-1 Well Drilling Update December 18, 2008 1
Antelope-1 Location The Antelope-1 well is the 4th appraisal well in InterOils Elk/Antelope gas field Antelope-1 lies 1.73 miles (2.29 km) from the Elk-4 discovery well Antelope-1 is the first test of the reef play in the…
Antelope 1 Update 12 hole section has been drilled from 3,288 feet (1,002 meters) to 5,738 feet (1,749 meters) Dolomite/Limestone was encountered at 5,735 feet (1,748 meters) close to the pre-drill prognosed depth The top of…
Antelope Platform / Reef Complex Model Elk-4 Antelope-1 Antelope-1 Top Limestone 1,595ft (486m) higher than Elk-4 Elk-4 Top Antelope-1 Top Limestone at Limestone at 6,677ft TVDSS 5,735ft TVDSS Reef Platform Antelope…
Antelope 1 Forward Plan Run 9 5/8 initial stage of casing to the top of limestone along with the required Downhole Deployment Valves Perform VSP and wireline logging operations Drill the limestone formation with 8 1/2 hole Log…