Skip to main content ANTELOPE 1 WELL DRILLING UPDATE – Interoil Corporation Investor Presentation | Shale Experts
Loading...

ANTELOPE 1 WELL DRILLING UPDATE – Interoil Corporation

Interoil Corporation · Dec 18, 2008 · 5 slides

Investor presentation from the Shale Experts oil & gas presentation and slide database. Every page is imaged and its text indexed for search across operators, plays, basins and time.

Slides

  1. ANTELOPE 1 WELL DRILLING UPDATE – Interoil Corporation – slide 1
    Antelope-1 Well Drilling Update December 18, 2008 1
  2. ANTELOPE 1 WELL DRILLING UPDATE – Interoil Corporation – slide 2
    Antelope-1 Location The Antelope-1 well is the 4th appraisal well in InterOils Elk/Antelope gas field Antelope-1 lies 1.73 miles (2.29 km) from the Elk-4 discovery well Antelope-1 is the first test of the reef play in the…
  3. ANTELOPE 1 WELL DRILLING UPDATE – Interoil Corporation – slide 3
    Antelope 1 Update 12 hole section has been drilled from 3,288 feet (1,002 meters) to 5,738 feet (1,749 meters) Dolomite/Limestone was encountered at 5,735 feet (1,748 meters) close to the pre-drill prognosed depth The top of…
  4. ANTELOPE 1 WELL DRILLING UPDATE – Interoil Corporation – slide 4
    Antelope Platform / Reef Complex Model Elk-4 Antelope-1 Antelope-1 Top Limestone 1,595ft (486m) higher than Elk-4 Elk-4 Top Antelope-1 Top Limestone at Limestone at 6,677ft TVDSS 5,735ft TVDSS Reef Platform Antelope…
  5. ANTELOPE 1 WELL DRILLING UPDATE – Interoil Corporation – slide 5
    Antelope 1 Forward Plan Run 9 5/8 initial stage of casing to the top of limestone along with the required Downhole Deployment Valves Perform VSP and wireline logging operations Drill the limestone formation with 8 1/2 hole Log…

From the store

Browse maps, data & reports in the Shale Experts store