Skip to main content APRIL 2012 INVESTOR PRESENTATION – Kazmunaigas Exploration Production | Shale Experts
Loading...

APRIL 2012 INVESTOR PRESENTATION – Kazmunaigas Exploration Production

Kazmunaigas Exploration Production · Apr 11, 2012 · 14 slides

Investor presentation from the Shale Experts oil & gas presentation and slide database. Every page is imaged and its text indexed for search across operators, plays, basins and time.

Slides

  1. APRIL 2012 INVESTOR PRESENTATION – Kazmunaigas Exploration Production – slide 1
    JSC KazMunaiGas Exploration p Production Roadshow April 2012 11
  2. APRIL 2012 INVESTOR PRESENTATION – Kazmunaigas Exploration Production – slide 2
    KMG EP at glance The largest Kazakh oil producer listed on LSE and KASE Preferential access to reserves and infrastructure through NC KMG KGM C Corporate t governance ini liline with ith iinternational t ti l EMG standards…
  3. APRIL 2012 INVESTOR PRESENTATION – Kazmunaigas Exploration Production – slide 3
    Recent developments Net income in 2011 US1.4bn (-11%), production 7.9 mt or 159kbopd (-10%), export sales decreased by 16% 1Q2012 production was 1.9 mt (156kbopd), which is 5% less than in 4Q2011. Export sales increased by 7%…
  4. APRIL 2012 INVESTOR PRESENTATION – Kazmunaigas Exploration Production – slide 4
    Organisational changes Samruk-Kazyna Changes in top management 100% LSE/KASE NC KMG Changes in top management Staff reduction 37% 63% Including CIC 11% Changes in top management KMG EP Staff reduction Sta educt o 50%…
  5. APRIL 2012 INVESTOR PRESENTATION – Kazmunaigas Exploration Production – slide 5
    2011-2020 strategy Maximisation of shareholder value Reserves increase Production increase Profitability improvement Onshore Mature assets Offshore projects M&A exploration Restoring and maintaining of Agreement with…
  6. APRIL 2012 INVESTOR PRESENTATION – Kazmunaigas Exploration Production – slide 6
    Cash and financial assets Cash and financial assets US4.8 bn. Possible use of cash over 3 years as at 31.12.2011 Core assets capital p expenditures: p Existing business plan: 2bn Preliminary estimates of additional expenditures…
  7. APRIL 2012 INVESTOR PRESENTATION – Kazmunaigas Exploration Production – slide 7
    KMG EP production assets overview Core mature assets Joint ventures (net working interest) Uzenmunaigas (UMG) and Embamunaigas (EMG) 2P reserves as at 31/12/11: 80mmbbl 2P reserves as at 2011 year end 1 1.7bn 7bn bbl KGM Production…
  8. APRIL 2012 INVESTOR PRESENTATION – Kazmunaigas Exploration Production – slide 8
    Challenging production plan at UMG in 2012 Number of wells and production 3 500 3 260 3 152 3 001 2 987 2 795 Increase in quantity 25 3 000 Unfavorable and qquality y of Production recover weather conditions repair 2 500 20…
  9. APRIL 2012 INVESTOR PRESENTATION – Kazmunaigas Exploration Production – slide 9
    Mature assets modernisation Development Drilling Production Workover further examination of sidetracking video and GPS construction of 2 Uzen field, update of field drilling of 2 horizontal monitoring subsurface equipment…
  10. APRIL 2012 INVESTOR PRESENTATION – Kazmunaigas Exploration Production – slide 10
    First steps Projects Purpose Construction of two units Increase in between overhaul periods; for diagnostics and repair of subsurface equipment Increase in level of industrial end environmental safety; Improvement of labour…
  11. APRIL 2012 INVESTOR PRESENTATION – Kazmunaigas Exploration Production – slide 11
    Expected modernisation results Production and Capex profile, EMG & UMG* 200 Uzen field production increase above 188 189 182 185 1 400 177 174 180 120kbopd, consolidated production at Uzen 159 and Emba above180 kbopd 1 200 160…
  12. APRIL 2012 INVESTOR PRESENTATION – Kazmunaigas Exploration Production – slide 12
    Existing and prospective exploration projects NORTHERN KAZAKHSTAN (SOUTH OF WESTERN SIBERIA) FEDOROVSKIY ZHARKAMYS EAST I KARPOVSKY N. N. KAZAKHSTAN TEPLO TEPLO- TOKAREVSKOE PAVLODAR TEMIR Kostanay AKMOLINSK REGION REGION…
  13. APRIL 2012 INVESTOR PRESENTATION – Kazmunaigas Exploration Production – slide 13
    Current exploration program* Estimated cumulative additions Geological exploration of recoverable resources, mmbbl expenditure, USm 363 851 343 787 747 300 275 637 552 215 424 312 89 63 2011A 2012 2013 2014 2015 2016…
  14. APRIL 2012 INVESTOR PRESENTATION – Kazmunaigas Exploration Production – slide 14
    Abbreviations list bbl barrel mmbbl million barrels bn bbl billion barrels bopd barrels per dayy kbopd thousand barrels per day US m million US dollars US bn billion US dollars KZT bn billion Tenge NC KMG National N ti lC Company…

From the store

Browse maps, data & reports in the Shale Experts store