Acquisition of 10% stake in BM-S- 8 Block in the Santos Basin (1) 2 (1) Subject to approval by the ANP
Offshore, Santos basin hot spot of the pre-salt 3
Largest Block in the pre-salt Jpiter Tupi (Lula) Guar Carioca 4
Low Risk Prospects with High Volume Potential Santos Basin: BM-S-8 Promising area with several discoveries nearby 2 Discoveries: Bem-te-vi and Abar W 4 Prospects Santos 01 Fluid: Oil Working Interest: 10% Petrobras Operator…
Low Risk Prospects with High Volume Potential Santos Basin: BM-S-8 Short-Term Schedule Transaction Value: US 175 MM CAPEX(1) related to 10% of the block: 2011: US 25 MM 2012: US 20MM (2) Drilling started in June (SPS-71A)…
Short-Term Catalysts: BM-S-8 Drilling ends at the Bigu prospect JUNE JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER Drilling begins at Block BM-S- 8 9
Short-Term Catalysts Drilling begins at Block BM-S- 12 Drilling Crossing Crossing Crossing ends at the Prospect Prospect Prospect Bigu Drilling Santos 1 in Santos2 in Santos 3 in prospect begins at Block BM-S- the Block Block…
BM-S-8: Boosting our Portfolio Low risk & high volumes Close to future Portfolio infrastructure Diversification facilities Partnership with Strategic Petrobras Positioning Short-Term Catalyst 11
For additional information: Investor Relations QGEP Participaes S.A. Av. Almirante Barroso, n 52, sala 1301, Centro Rio de Janeiro, RJ CEP: 20031-918 Phone - IR: 55 21 3509-5959 Fax: 55 21 3509-5958 E-mail: riqgep.com.br…