InterOil Corporation RBS Asia Pacific Energy & Engineering Conference New York, NY PAPUA NEW GUINEA THE NEXT GLOBAL LNG SUPPLIER Phil Mulacek - CEO September 16, 2010
InterOil Investment Highlights Increased resource estimate on Elk and Antelope fields 2009 YE Best Case estimate of 8.2 Tcf and 156.5 MMBC gross contingent resources Condensate stripping project JV with Mitsui FEED underway, FID…
InterOil Has A Track Record of Achievement With Investment Upside InterOil was formed in 1997 - Vision to create an integrated energy company Exploration licenses signed under incentive program - 2003 Elk-1 discovery of Elk fault block…
InterOil Successfully Completed Milestones Oct 06 Completes Apr 04 - Acq of acquisition of Shell Feb 05 - BP downstream Distribution assets Announced assets May 08 Gas and Liquids May 97 125 million completed discovery at Antelope…
Efficient Use of Capital Has Yielded A Valuable Asset Description of the Financing Event (Upstream and LNG Development Month / Year of Pre-Money Amount Raised Financing Event Company Valuation related only) Indirect Participation…
InterOil Assets In Papua New Guinea InterOil was formed in 1997 and has built a vertically integrated energy company with a market capitalization of 2.7 billion. Operating Assets Downstream 17 depots/ terminals, 12 aviation sites…
InterOil Has Created Value With Upside Potential InterOil is currently trading at approximately 0.50 per mcf IOC fully diluted market cap = 2.7B Best Case resource estimate YE-2009 = 9.1Tcfe IOC ownership of Elk and Antelope = 57.8%…
InterOil Assets Located in a Cooperative Political Environment Former Australian Territory Gained Independence in 1975 Strong relations with Australia - A350 million annual aid Constitutional Monarchy Parliamentary Democracy, Member…
Synergistic Business Segments Across The Value Chain Exploration Portfolio Midstream Portfolio - Refinery Downstream Domestic 3.9 million acres K36bpd capacity Distribution Proposed Condensate Stripping Project Proposed…
Upstream Exploration Provides Long-Term Growth Potential Operate 3.9 million acre onshore exploration license 40 identified drilling prospects Assets secured at a time when Papua New Guinea was overlooked and under-explored InterOil…
World Class Hydrocarbon Province InterOils 3.9 Million Acres PPL237 PPL238 PPL236 Source: Papua New Guinea Department of Petroleum & Energy 13
Additional Resource Potential On Flanks Of Elk and Antelope Field Elk-4 Elk-2 Antelope-1 Elk-1 Antelope-2 Antelope-3 1.6 1.7 0.9 2.9 miles miles miles miles 14
Antelope-1 and 2 Wells Confirmed Reef Development Observed On Seismic Data Elk-4 Ant-1 Ant-3 Ant-4 Ant-2 Projected GWC (TWT) 15
Antelope-2 Well Confirmed Lateral Extent of Dolomitization Antelope-1 Vertical Antelope-2 Log Results: Antelope-2 Demonstrated a gas and gas liquids column height of 1,729 feet Confirmed reef development with porous limestone…
Well Productivity Exceeds Proposed LNG Startup Requirements Flow Test Natural Gross Net Percent Production Well Gas Reservoir Reservoir Pay Tubing OD Condensate 102 MMcfd Elk-1 620 Ft. 88 Ft. 14% 5.5 inch 510 BCPD 105 MMcfd…
Third Party Resource Estimate Elk and Antelope Structure Gross Resource Estimate for Gas and Condensate An evaluation of the potential resources of gas and condensate for the As At December, 31, 2009 Case Elk/Antelope field has been…
InterOil Added 889 MMBOE of Contingent Resources in 2009 Case 1,600.0 Condensate * Sales Gas * 156.5 1,400.0 As at 31 December, 2009 Low Best High 1,200.0 Original Gas-In-Place (tcf) 9.65 11.03 12.54 1,000.0 mmboe Initial…
Antelope-2 Horizontal Results Exceed Objectives Horizontal length reached a total of 3,066 feet (934 meters) from vertical well bore Confirmed an increasing condensate-to- natural gas ratio (CGR) Demonstrated dolomitization…
Antelope-2 Horizontal Confirms 20-21 Bbls/MMcf CGR DST 5 flowed gas at a rate between 5.7 and 7.3 million cubic feet per day (MMcfd) through various choke sizes with no formation water produced. The stabilized condensate-to-gas…
22 Antelope 2 - Horizontal 2A -Testing Program InterOil plans to test three separate levels (DSTs 6, 7 and 8 respectively) below the lowest tested gas in the previous horizontal lateral These three DSTs allow for testing over…
DST 6 and Proposed DSTs 7 and 8 Top of 5.5 TVD Liner 2078m MD kb 2325 DST 5 2335m CGR=21.4 bbl/mm No Water 5.5 Csg 2345m Shoe 2,418m MD DST 6 2355m 2,610m 2,703m Possible Gas/ Water MD in horizontal 2365m Contact based on gas…
24 DST 6 Tested Higher Condensate-to-Gas Ratio DST 6 was performed: Interval flowed gas and condensate at 1,500psi FTP Packers that were set in open hole to isolate the horizontal leg failed after flowing for two hours Flow…
InterOils Second Rig Has Arrived in PNG Initiated modifications for jungle conditions Once in PNG the rig will be modified for jungle operations at Napa Napa Timing subject to achievement of ongoing corporate objectives…
Surrounding Prospect Inventory to Fuel Long-Term Growth 26
Feasibility Study Indicates Economic Condensate Recovery Project EDG Consulting Engineers were commissioned to evaluate early monetization of condensate from the Elk/Antelope field InterOil committed to FEED with Mitsui &Co.,…
InterOil Executes JVOA and Option Deed with Mitsui & Co. Ltd. On August 04, 2010, InterOil finalized a Joint Venture Operating Agreement (JVOA) for the Companys proposed Condensate Stripping Plant (CSP) with Mitsui & Co., Ltd.…
Robust Economics Create a Competitive LNG JV Process Current activities and objectives: Deliver a on time and on budget LNG project in PNG Project Agreement approved by PNG Government in December 2009 Competitive economics compared…
Papua New Guinea at Heart of Worlds Largest LNG Market Source: BP Statistical Review 2009 30
Attractive Economics Relative to Asia-Pacific LNG Projects Natural Gas Supply InterOil believes exploration wells (Elk and Antelope) indicate higher productivity than other wells in PNG Tests indicate 5-6% CO2 InterOil anticipates…
InterOil Controls the Largest Field in Papua New Guinea Oil Fields1 Gas & Condensate Fields1 Oil Solution Gas Condensate Natural Gas MMSTBO BCF MMBC BCF MMBOE Elk & Antelope2 156.5 8,120 1,509.8 Hides 101.0 5,371 996.2 Kutubu 348.6…
InterOil Capitalizes on the Whole Value Chain Refinery LNG Plant Power Plant Exploration & Development Hydrocarbon Sales LPG Export Oil, Natural Gas and Condensate Production Separation and Transportation Commercial…
Proposed JV Partner Participating Interests Participating Interests Post-Transaction InterOil 30.0% Industry Partner 25.0% Farm-In Partners Investor Group 35.0% 12.5% Petromin 22.5% Strategic 2.5% Example only. Strategic…
Proposed Timeline Based on LNG Partner Agreement by YE 2010 2010 2011 2012 First Condensate Condensate 2013/2014 First LNG Floating LNG (3 mtpa) 2015/2016 Land LNG (4 mtpa) Land Based LNG Elk/Antelope & Condensate Stripping…
Brown Fields Site Leverages Existing Infrastructure for World Scale LNG Project InterOil refinery Located on InterOil leasehold land adjoining Port Moresby harbor 37
Profitable Refining Segment with Existing Spare Capacity 36,500 bpd capacity oil refinery Excess capacity for in-country growth Supplies domestic market Refinery strategically located government leased land Profitability enhancement…
Profitable Distribution with Domestic and Export Growth Potential Largest distributor of fuel products in PNG Strategic acquisitions to leverage InterOils niche refinery Owned and operated by InterOil: Distribution depots Seaboard…
Strong Balance Sheet June 30, 2010 December 31, 2009 Cash, Cash Equivalents, Restricted Cash 57.2 75.8 Total Current Assets 212.4 208.1 Plant & Equipment, Oil & Gas Properties 437.8 393.5 Total Assets 678.4 631.8 Current Liabilities…
2010 Operating Goals Reach early condensate FID and advance the development of liquid stripping plant to commercial operations Continue development of the Elk/Antelope Of course, our overarching goal remains field to continue…
In Summary Papua New Guinea is an under-explored frontier with world class assets strategically located on the doorstep of Asia Proving significant hydrocarbon resource for a stronger LNG Joint Venture GLJ Petroleum Consultants Ltd.…