Skip to main content INVESTOR PRESENTATION – Cequence Energy Ltd. | Shale Experts
Loading...

INVESTOR PRESENTATION – Cequence Energy Ltd.

Cequence Energy Ltd. · Jun 11, 2014 · 30 slides

Investor presentation from the Shale Experts oil & gas presentation and slide database. Every page is imaged and its text indexed for search across operators, plays, basins and time.

Slides

  1. INVESTOR PRESENTATION – Cequence Energy Ltd. – slide 1
    EPAC Oil & Gas Investor Showcase June 11, 2014 cequence energy ltd
  2. INVESTOR PRESENTATION – Cequence Energy Ltd. – slide 2
    Focus in the Deep Basin of Alberta Cequence is positioned to become a BRITISH ALBERTA significant natural gas producer in Canada with two large projects now established: COLUMBIA CANADA USA Simonette Project is ready for…
  3. INVESTOR PRESENTATION – Cequence Energy Ltd. – slide 3
    Recent Highlights Q1 cash flow reached a record 23 million on production of 11,600 Boepd Yearend 2P reserves grew 24% to 113 Mmboe with NPV 10% of 1 billion 2P FD&A was 11.17 per boe, F&D was 10.10 per Boe Bank line of…
  4. INVESTOR PRESENTATION – Cequence Energy Ltd. – slide 4
    Corporate Profile Trading Symbol TSX: CQE Q1 Production (Boe/d) 11,600 Q1 Cashflow 23 million 52week trading range 1.42 3.15 Shares outstanding 211 million Insider ownership 13% FD Market capitalization (1) 570 million March 31,…
  5. INVESTOR PRESENTATION – Cequence Energy Ltd. – slide 5
    Guidance 40% growth planned for 2014 Preliminary 2014 2013 Guidance (4) Production (Boe/d) 10,183 (1) 13,50014,000 Exit production (Boe/d) 12,000 15,000 Capital expenditures 111 MM 120 MM Wells drilled 15 (11.75) 16 (14)…
  6. INVESTOR PRESENTATION – Cequence Energy Ltd. – slide 6
    5 Year Development Plan 80% of drilling is assumed to be Montney at Simonette Major Assumptions: NO ADDITIONAL EQUITY 143 wells drilled in next five years (80% Montney, 20% other zones) Base Case Montney production model and…
  7. INVESTOR PRESENTATION – Cequence Energy Ltd. – slide 7
    Cequence Simonette 1311 Compressor Station Cequence Simonette 1311 Compressor Station 8
  8. INVESTOR PRESENTATION – Cequence Energy Ltd. – slide 8
    Simonette Project Infrastructure ready for full scale development R2 R1W6 R27 R26 R25 R24 R23W5 Cequence Alliance 3D Seismic Cequence operates its facilities at Coverage T64 Meter Station Simonette and delivers raw gas to…
  9. INVESTOR PRESENTATION – Cequence Energy Ltd. – slide 9
    Alberta Deep Basin Montney Competitor Lands R9 R8 R7 R6 R5 R4 R3 R2 R1W6 R26 R25 R24 R23 R22 R21W5 T69 WAPITI Cequence owns 87 net sections of T68 Montney land at Simonette in the ANTE CREEK liquids rich, overpressured T67…
  10. INVESTOR PRESENTATION – Cequence Energy Ltd. – slide 10
    Upper Montney Liquids Three important wells completed in Q1 reinforce transition to development style pad drilling 23 pads currently built with pipeline tieins 12 additional pads approved for construction 1335 Higher…
  11. INVESTOR PRESENTATION – Cequence Energy Ltd. – slide 11
    Simonette Upper Montney Development Plan R2 R1W6 R27 R26 R25W5 Approximately 200 locations depending Upper on optimum well length 5 year plan will drill CURRENT approximately 50% of HORIZONAL TARGET T62 current…
  12. INVESTOR PRESENTATION – Cequence Energy Ltd. – slide 12
    Cequence Montney gas producers 18 wells to date BASE CASE HALF CYCLE ECONOMICS HIGH CASE Budget model 12 IP (MMcf/d) 5.5 7.5 11 IP 30 (MMcf/d) 4.6 6.9 EUR (MBoe) 925 1,290 Raw Gas (Bcf) 5.0 7.0 10 Condy (MBbl) 100 150 NGL…
  13. INVESTOR PRESENTATION – Cequence Energy Ltd. – slide 13
    Montney Drilling and Completion Costs Long term target of 7.5 million is achievable 7 Montney Drilling Costs 4500 6 Montney Completion Costs 900 6 4000 5 750 5 3500 Completion Costs MM 4 600 HZ length drilled…
  14. INVESTOR PRESENTATION – Cequence Energy Ltd. – slide 14
    Simonette Dunvegan, Falher and Wilrich plays Dunvegan Oil and Gas/Condensate play 102 well 90 day IP was 13 MMcf/d 52 well 60 day IP was 9 MMcf/d Cequence has 11 net sections along gas Area average: and oil trend IP rate 4.5…
  15. INVESTOR PRESENTATION – Cequence Energy Ltd. – slide 15
    Ansell Wilrich Project R20 R19 R18 R17 R16W5 Initial derisking of project successful T52 PEYTO Pipeline To Talisman 100 MMcf/d pipeline and 40 MMcf/d Edson Gas Plant Phase 1 compressor/dehydration facility completed in April…
  16. INVESTOR PRESENTATION – Cequence Energy Ltd. – slide 16
    Conclusions Simonette Project large proven Deep Basin Montney resource play with multiple uphole zones Ansell project Wilrich resource play in an excellent area Financial strength CQE has a strong balance sheet with 70 million of…
  17. INVESTOR PRESENTATION – Cequence Energy Ltd. – slide 17
    Appendix Cequence Simonette 1311 Compressor Station 18
  18. INVESTOR PRESENTATION – Cequence Energy Ltd. – slide 18
    Management and Board Management Team Board of Directors Paul Wanklyn President and CEO Don Archibald Chairman Howard Crone Executive VP and COO Peter Bannister Steve Stretch VP Exploration and Chief Geophysicist Rob Cook Dave…
  19. INVESTOR PRESENTATION – Cequence Energy Ltd. – slide 19
    Canada Pension Plan Investment Board Private Debt Placement 60 million, 5 year unsecured notes issued at par Closed on October 3rd, 2013 Coupon rate 9%, plus 3.0 million warrants at 2.03 Initially used to pay down outstanding…
  20. INVESTOR PRESENTATION – Cequence Energy Ltd. – slide 20
    Financial Highlights Q1 2014 Q4 2013 % Change Average Daily Production (Boe/d) 11,613 10,394 12 Funds flow from operations (M) (1) 23,082 14,855 55 Per share, basic and diluted 0.11 0.07 57 Operating costs per Boe 7.40 7.33…
  21. INVESTOR PRESENTATION – Cequence Energy Ltd. – slide 21
    Production and Cash Costs Production (Boe/d) Total Cash Costs (/Boe) (1) 16,000 20 14,000 Simonette and 18 Ansell Projects will 16 12,000 Merger with drive 40% growth Temple Energy in 2014 14 10,000 Boe/d 12 /Boe…
  22. INVESTOR PRESENTATION – Cequence Energy Ltd. – slide 22
    Netback Table Q1 2014 Corporate Simonette Total Average daily production (Boe/d) 8,263 11,612 Natural gas (MMcf/d) 41.7 59.9 Oil and liquids (Bbls/d) 1,308 1,630 Sales price (/Boe) 45.76 44.29 Royalties (/Boe) (4.08) (4.13)…
  23. INVESTOR PRESENTATION – Cequence Energy Ltd. – slide 23
    Hedging Volume Contract Type CAD Price GJ/d Average Gas 3.45/GJ AECO or 2014 January 1, 2014 to December 31, 2014 30,000 Swap 4.00/Mcf Average Gas 3.79/GJ AECO or 2015 January 1, 2015 to March 31, 2015 20,000 Swap…
  24. INVESTOR PRESENTATION – Cequence Energy Ltd. – slide 24
    Reserves and Finding Costs solid growth per share in reserves and value FD&A (/Boe) Reserves 2P Reserve Value 16.00 140 0.7 1200 6 3 year average Reserve value has 1,036 Reserves increased 14.00 11.61per Boe doubled since…
  25. INVESTOR PRESENTATION – Cequence Energy Ltd. – slide 25
    Montney Half Cycle Economics Sensitivity to Flat Gas Price and Recoverable Gas in Place per Well 20,000 Assumptions: Net NGL Yield: 30 Bbl/MMcf C3+ Capital: 7.5 MM Oil Price: 90/Bbl WTI 15,000 NPV 10% BT (M) 10,000…
  26. INVESTOR PRESENTATION – Cequence Energy Ltd. – slide 26
    Simonette Deep Basin Stack Dunvegan Wilrich Montney 2950 Simonette Upper 2975 CURRENT HORIZONAL TARGET ZONE Falher Bluesky / Gething 3000 Simonette Lower 3025 POTENTIAL 3050 HORIZONAL TARGET ZONE 3075…
  27. INVESTOR PRESENTATION – Cequence Energy Ltd. – slide 27
    Multiple Zones with Significant Resource Potential at Simonette 6 miles CEQUENCE LAND Zone Total Resource Potential/Sec (1) 2,400m Dunvegan 525 BCF 2,500m Falher 524 BCF 2,700m Wilrich 524 BCF 2,800m Gething 525 BCF…
  28. INVESTOR PRESENTATION – Cequence Energy Ltd. – slide 28
    Alberta Deep Basin Montney HZ First 6 month cumulative gas production 1.8 1.6 1.4 1.2 Average of CQE Wells 540 MMcf Cum Gas (BCF) 1 Average All Wells 0.8 390 MMcf 0.6 0.4 0.2 0 Cequence Wells Industry…
  29. INVESTOR PRESENTATION – Cequence Energy Ltd. – slide 29
    Alberta Deep Basin Montney HZ Drilling Analysis CQE among most efficient drillers 300 12000 300 12000 2012 and older 245 wells 2013 63 wells Measured Depth (m) Measured Depth (m) 250 10000 250 10000 CQE P50 All Wells P50 CQE…
  30. INVESTOR PRESENTATION – Cequence Energy Ltd. – slide 30
    www.cequence-energy.com Contacts: 3100, 525 - 8th Avenue SW Calgary AB T2P 1G1 Paul Wanklyn David Gillis President & CEO Vice President, Finance & CFO Phone: 403-229-3050 Fax: 403-229-0603 pwanklyncequenceenergy.com…

From the store

Browse maps, data & reports in the Shale Experts store