MARCH 2015 CORPORATE PRESENTATION – Husky Energy Inc.

Husky Energy Inc. · Mar 13, 2015 · 18 slides

Investor presentation from the Shale Experts oil & gas presentation and slide database. Every page is imaged and its text indexed for search across operators, plays, basins and time.

Slides

  1. MARCH 2015 CORPORATE PRESENTATION – Husky Energy Inc. – slide 1
    Corporate Presentation March 2015
  2. MARCH 2015 CORPORATE PRESENTATION – Husky Energy Inc. – slide 2
    Balanced Growth Strategy and Portfolio Development Balanced growth strategy delivering Transforming the foundation Focused integration Major projects delivered Reliable and repeatable performance Strong dividend 2
  3. MARCH 2015 CORPORATE PRESENTATION – Husky Energy Inc. – slide 3
    Flexible and Diverse Portfolio Near-Term (2015-2016) Mid-Term (2017-2019) Long-Term (2020+) Rush Lake Thermal Lloyd 1 Thermal Lloyd 3 Thermal Edam West Thermal Lloyd 2 Thermal Lloyd 4 Thermal Edam East Thermal McMullen Thermal…
  4. MARCH 2015 CORPORATE PRESENTATION – Husky Energy Inc. – slide 4
    Delivering Higher Quality Returns Predictable outputs, less volatility, and steady cash flow achieved through: Portfolio flexibility, favouring higher return, earlier payback projects Balancing investment towards low sustaining…
  5. MARCH 2015 CORPORATE PRESENTATION – Husky Energy Inc. – slide 5
    2015 Capital and Production Priorities 2015 Production Guidance: 325,000 355,000 boe/day 400 Delivering near-term production growth Forecast Range Staging mid and long-term projects Natural Gas Canada MBOE/D Natural Gas…
  6. MARCH 2015 CORPORATE PRESENTATION – Husky Energy Inc. – slide 6
    Foundation Portfolio
  7. MARCH 2015 CORPORATE PRESENTATION – Husky Energy Inc. – slide 7
    Foundation Portfolio Project Forecast Net Production 2014-2019 Expected Production Adds (BOE/D) 300 Near-Term (2015-2016) Heavy Oil Thermals Four sanctioned projects 33,500 250 Downstream South Sask. Gathering System N/A 200…
  8. MARCH 2015 CORPORATE PRESENTATION – Husky Energy Inc. – slide 8
    Heavy Oil Thermal Portfolio Heating Up Thermal Production Forecast* Thermal First Oil Current/ Status Project Date Forecasted Net Production Rate (bbls/d) 80 Pikes Peak 1984 4,000 Bolney Celtic 1996 18,900 Producing…
  9. MARCH 2015 CORPORATE PRESENTATION – Husky Energy Inc. – slide 9
    Heavy Oil Typical Thermal Economics Metric Target1 Construction time 2 years Start up to peak < 3 months production SOR target 2.0 early years Pikes Peak South Sustaining capital per bbl2 5 - 7 Life of project 15 Years +…
  10. MARCH 2015 CORPORATE PRESENTATION – Husky Energy Inc. – slide 10
    Western Canada Shaping the Resource Play Portfolio Extensive resource play portfolio diversified by product, region and scale Disciplined capital allocation - large portfolio allows flexibility Investing in the right projects…
  11. MARCH 2015 CORPORATE PRESENTATION – Husky Energy Inc. – slide 11
    Downstream Strong Infrastructure Position Integrated on a barrel for barrel basis Reduces cash flow volatility Steady returns generated 11
  12. MARCH 2015 CORPORATE PRESENTATION – Husky Energy Inc. – slide 12
    Pillars Portfolio
  13. MARCH 2015 CORPORATE PRESENTATION – Husky Energy Inc. – slide 13
    Pillars Portfolio Project Forecast Net Production Forecast Net Production Adds (boe/d) 150 Near-Term (2015-2016) Asia Pacific Liuhua 34-2 5,000 Oil Sands Sunrise Phase 1 30,000 Atlantic Region South White Rose (Peak) 15,000 100…
  14. MARCH 2015 CORPORATE PRESENTATION – Husky Energy Inc. – slide 14
    Asia Pacific Region Liwan Gas Project Delivered Liwan Largest offshore platform in Asia; 1 bcf/d gas terminal Producing gas and liquids Liuhua 34-2 field on stream Indonesia Liwan Offshore Platform BD field in construction…
  15. MARCH 2015 CORPORATE PRESENTATION – Husky Energy Inc. – slide 15
    Oil Sands Sunrise Energy Project Large resource base 3.7 billion barrels of 3P reserves1 Phase 1 design rate of 60,000 bbls/day (gross) Approvals in place for 200,000 bbls/day (gross) 40 plus years project life Excellent…
  16. MARCH 2015 CORPORATE PRESENTATION – Husky Energy Inc. – slide 16
    Atlantic Region Delivering High Quality Returns Projects staged to fund future growth and provide predictable cash flow South White Rose First oil production expected mid-year 2015 Combines gas injection and oil production to…
  17. MARCH 2015 CORPORATE PRESENTATION – Husky Energy Inc. – slide 17
    Atlantic Region Stay Tuned Long-term commercial potential across region Multiple targets identified in Flemish Pass 18 month delineation program started Oct 2014 West Mira under construction Flemish Pass 17
  18. MARCH 2015 CORPORATE PRESENTATION – Husky Energy Inc. – slide 18
    Balanced Growth Strategy Is Delivering Balanced growth strategy delivering Transforming the foundation Focused integration Major projects delivered Reliable and repeatable performance Strong dividend 18