Overview Balanced growth strategy delivering Consistent execution driving performance and improving returns Transforming the foundation Advancing growth pillars 2
On Track to Achieve Our Targets 2012-2017 2010 Actuals 2015 Targets 2012 Actuals Target (1) Production 287 3-5% CAGR 301.5 5-8% CAGR (mboe/d) Reserve 155% 140% 140% Replacement 174% 2 year average average Ratio average Return on…
2013 Capital and Production Guidance 6 Capital Expenditures (billions) Production (mboe/day) 350 5 4.7 4.8 Forecast range 301.5 mboe/d 300 310 330 mboe/d Midstream/ Downstream/ 4 Corporate Atlantic Region 250 3 Oil…
Focused Integration Achieving World Market Prices Realized Pricing on Upstream Production Processed (December 31, 2012) 160.00 Brent Pricing 140.00 Benchmark 120.00 Realized Price /bbl 100.00 US Refining .. 80.00 I&M…
Foundation
Heavy Oil Advantage Very large resource position Industry-leading infrastructure and integration 70 years of heavy oil recovery experience (30 years for thermal) New technologies and techniques continue to increase recovery…
Thermal Projects Pipeline Thermal Production Development Project (bbl/d) Timeline Bolney/Celtic Area Paradise Hill Pikes Peak 5,000 Producing 1982 Bolney Celtic Bolney/Celtic 13,000 Producing 1996 Sandall Rush Lake Pilot…
Transforming the Foundation Heavy Oil Thermal Success Name Plate Capital Current Production Intensity F&D Operating Project Production (bbl/d) (/flowing (/bbl) Costs (/barrel) (bbl/d) barrel)* Pikes Peak 8,000 12,400 24,000 12…
Transforming the Foundation Western Canada Total 2013 Approximate PIIP Production Resource Play Planned Net Acres mmboe* boe/d Activity /section Established Oil Slater River Bakken 18,000 10 wells Viking 60,000 58 wells Oil 5 -…
Liquids Rich Gas: Ansell Ansell Cardium 200 net sections 3 mmboe Total PIIP/section Liquids yield: 60 bbl/mmcf Up to a total of 800 well locations (based on four wells per section) Cardium Ansell Wilrich 195 net sections 3…
Emerging Resource Plays Total PIIP per Acres (net) Locations 2012 Activity 2013 Plan Section 400,000 acres 2,500 Continue to de-risk 14 wells drilled Rainbow- Muskwa 600+ net 20 - 30 mmboe 4 wells per Refine completion strategies 4…
Downstream Reliability/Flexibility Downstream Assets Capacity (mbbls/day) Lima Increase feedstock and product Lima 160 flexibility Toledo (Husky 50% WI) 65 Kerosene hydrotreater complete; increased flexibility to optimize product…
Growth Pillars
Liwan Progress Project progressing according to plan Approximately 85% complete Deepwater almost complete Drilling finished; eight wells completed and one completion remains Topsides float over Deepwater pipelines are being…
Liwan - Gaolan Gas Plant August 2011 February 2013
Liwan - Gaolan Gas Plant February 2013
Liwan Development Milestones Milestone Timeframe Action Delineation Q4 2009 Completed FEED Q4 2010 Completed Deep and Shallow Water Tendering Q1 2011 Completed Development Drilling Q2 2011 Completed Lower Completions Q4 2011…
Madura Developments Field Production Budget Development Prices Status MDA & 60 mmcf/d gas US120- Two wellhead Expecting Plan of Development (POD) submitted MBH US150MM platforms and pipeline US 6+/mmbtu Upon POD approval AFEs &…
Indonesia: Madura Strait Block Developments and Discoveries BD Field has an approved POD and is in the tender phase MDA and MBH fields are being developed in tandem. POD approval pending Four recent discoveries expected to be…
Sunrise Energy Project Over 65% complete Large resource base 3.7 billion barrels of 3P reserves1 Sunrise Phase 1 and 2 approvals in place for 200,000 bbl/day (gross) Excellent reservoir quality and oil saturation Cost pressure…
Sunrise Milestones Milestone Expected Action Timeframe Drilling spud first horizontal well Q1 2011 Completed Commence major construction Mid-2011 Completed Sunrise May, 2011 Completed ahead of Drilling complete 2nd Half 2012…
Atlantic Region Overview Strategy of near-field developments planned North Amethyst Hibernia (2013) South White Rose Extension (2014) West White Rose Extension (2016/17) Near-field opportunities: Northwest White Rose West…
South White Rose Extension Project Combined oil production and gas and water injection centre targeting 20 MMBBLS (3P reserves1) of oil (net) Budget: 800 million (net) Milestone Expected Action Timeframe Gas injection Q2 2012…
West WestWhite WhiteRose ExtensionProject Rose Extension Project Wellhead Platform Targeting around 80 MMBBLS (3P reserves1) of oil (net) Concept evaluation includes Wellhead Platform Milestone Expected Action Timeframe…
Summary Balanced growth strategy delivering Consistent execution driving performance and improving returns Transforming the foundation Advancing growth pillars 26
Advisories The Company uses the term barrels of oil equivalent (boe), which are calculated on an energy equivalence basis whereby one barrel of crude oil is equivalent to six thousand cubic feet of natural gas. Readers are cautioned that…
Resource Play Reserves Summary at December 31, 2012 Proved Reserves Probable Reserves Possible Reserves Resource Play Oungre Bakken 3,034 mbbl 873 mbbl - Redwater Viking 6,480 mbbl 608 mbbl - Alliance Viking 1,984 mbbl 17 mbbl -…