    TECHNIP / CHIYODA USD 4 BILLION CONTRACT IN QATAR PRESS CONFERENCE December 16, 2004
  2. DECEMBER 2004 CORPORATE PRESENTATION – Technip – slide 2
    I. THE NATURAL GAS MARKET II. LIQUEFIED NATURAL GAS III. THE QATARGAS II PROJECT 2
  3. DECEMBER 2004 CORPORATE PRESENTATION – Technip – slide 3
    I. THE NATURAL GAS MARKET 1. THE MARKET 2. A GEOGRAPHICAL IMBALANCE 3. THE GAS PATH: FROM PRODUCTION TO END-USE 4. NATURAL GAS EXPORTS 3
  4. DECEMBER 2004 CORPORATE PRESENTATION – Technip – slide 4
    THE NATURAL GAS MARKET Longer lasting reserves (60 years at current consumption rates) compared to oil reserves (40 years) A more environmentally-friendly fossil fuel source than either oil or coal Declining domestic production in…
  5. DECEMBER 2004 CORPORATE PRESENTATION – Technip – slide 5
    A GEOGRAPHICAL IMBALANCE 30.3 20.1 5.1 21.7 4.2 29.4 40.8 7.8 13.4 7.7 7.8 2.6 4.14.2 % of global gas consumption by region % of global gas reserves by region Source: Oil & Gas Journal, 2004 5
  6. DECEMBER 2004 CORPORATE PRESENTATION – Technip – slide 6
    THE GAS PATH: FROM PRODUCTION TO END-USE Local Market Residential Residential Power Power Stations Stations Pipeline Petrochemicals Petrochemicals Export LNG Fertilizer Fertilizer Fuel Fuel (GTL) (GTL) GTL 6
  7. DECEMBER 2004 CORPORATE PRESENTATION – Technip – slide 7
    NATURAL GAS EXPORTS 2003 Figures Primary Flows 132 Russia Europe 99 Canada US PIPELINE: 455 Bn M3 Norway 68 W. Europe Algeria 33 W. Europe Indonesia 35 Japan, Korea 28 Algeria W. Europe LNG: 169 Bn M3 23 Malaysia…
  8. DECEMBER 2004 CORPORATE PRESENTATION – Technip – slide 8
    II. LIQUEFIED NATURAL GAS (LNG) 1. THE LNG CHAIN 2. LNG MARKET TRENDS 3. EXISTING AND PLANNED LNG INSTALLATIONS (THROUGH 2012) 4. THE INCREASING CAPACITY OF LNG TRAINS 8
  9. DECEMBER 2004 CORPORATE PRESENTATION – Technip – slide 9
    THE LNG CHAIN NATURAL GAS GAS TREATMENT AND LIQUEFACTION PRODUCTION REGASIFICATION TRANSPORT: -160C 9
  10. DECEMBER 2004 CORPORATE PRESENTATION – Technip – slide 10
    LNG MARKET TRENDS Today, global demand is 150 million tons pa Between 2000 and 2030, LNG demand is expected to increase fivefold 2012 LNG Demand 2012 LNG Supply Brunei Rest of World 3% Indonesia 21% 14% 11% Venezuela Americas…
  11. DECEMBER 2004 CORPORATE PRESENTATION – Technip – slide 11
    EXISTING AND PLANNED LNG INSTALLATIONS (2004 2012) PLANTS TERMINALS Existing SKIKDA SONATRACH QATARGAS 2 Exxon/QP 2 Trains (7.8 Mtpa) 1 Train ( 4 Mtpa) IS QATARGAS 3 Phillips/QP 2 Trains (7.8 Mtpa) RASGAS II Exxon/QP - 2 Trains (7.8…
  12. DECEMBER 2004 CORPORATE PRESENTATION – Technip – slide 12
    THE INCREASING CAPACITY OF LNG TRAINS Train Capacity (MTA) Qatargas II 8 Trinidad Train 4 6 Egypt Rasgas Train 3 4 Rasgas Trains 1 & 2 2 0 1964 1972 1978 1982 1989 1997 1999 2003 2005 2006 2007 Beyond 2007 12
  13. DECEMBER 2004 CORPORATE PRESENTATION – Technip – slide 13
    III. THE QATARGAS II PROJECT 1. OVERVIEW 2. THE PROJECT 13
  14. DECEMBER 2004 CORPORATE PRESENTATION – Technip – slide 14
    THE WORLDS LARGEST GAS FIELD IRAN South Pars North Field SAUDI ARABIA Persian Gulf QATAR 14
  15. DECEMBER 2004 CORPORATE PRESENTATION – Technip – slide 15
    QATARGAS II: AN INTEGRATED PROJECT The 4 key elements of the project: Offshore platforms and associated conduits An onshore gas treatment plant and LNG facility LNG transport carriers An LNG reception terminal in the UK A…
  16. DECEMBER 2004 CORPORATE PRESENTATION – Technip – slide 16
    QATARGAS II: TRAINS OF 7.8 MILLION TONS/YR EACH Project located at Ras Laffan, Qatar Client: Qatargas II (70% Qatar Petroleum, 30% ExxonMobil) Contract value for LNG facility: USD 4 billion for both trains Execution: Joint venture…
  17. DECEMBER 2004 CORPORATE PRESENTATION – Technip – slide 17
    QATARGAS II: THE MAIN CHARACTERISTICS LNG 15.6 MT/yr GAS Condensates 30 Bn M3/yr 6 MT/yr Propane / Butane 1.7 MT/yr 17
  18. DECEMBER 2004 CORPORATE PRESENTATION – Technip – slide 18
    LOCATION OF QATARGAS II 18
  19. DECEMBER 2004 CORPORATE PRESENTATION – Technip – slide 19
    QATARGAS II: PROJECT EXECUTION Yokohama Project direction Paris & engineering of Engineering of off-sites LNG trains & associated utilities PARIS YOKOHAMA RAS LAFFAN QATARGAS II Construction 19
  20. DECEMBER 2004 CORPORATE PRESENTATION – Technip – slide 20
    EVOLUTION OF CONTRACT SIZE in Billions 4 3 2 1 1998 2002 2003 2004 Sincor OGD2 Bonny Island Dalia Qatargas II Trains 4 & 5 SURF + FPSO Trains 4 & 5 20