    Corporate Presentation August 2014 TSX: TSX:YGR YGR
  2. Coporate Presentation – Yangarra Resources Ltd. – slide 2
    Our job is to create shareholder value Integrity and ethical behavior are essential to success Sound ethics and shareholders interests are compatible It is okay to be wrong: own it, accept it, learn from it Embrace adversity, it is…
  3. Coporate Presentation – Yangarra Resources Ltd. – slide 3
    Publicly listed junior oil and gas company TSX: YGR Shares Outstanding Basic 57.7 million Options/Warrants (weighted average 1.87) 4.9 million Fully Diluted 62.6 million Insider Ownership Basic 15% Fully Diluted 21% Market…
  4. Coporate Presentation – Yangarra Resources Ltd. – slide 4
    Management Team Jim Evaskevich, President & CEO Randall Faminow, VP, Land 30+ years extensive executive experience with strong 30+ years of experience in all aspects of oil and gas land work, operations background including…
  5. Coporate Presentation – Yangarra Resources Ltd. – slide 5
    Half Cycle IRR (1) Full Cycle IRR (2) 80% 70% 60% 50% IRR 40% 67% 65% 30% 20% 41% 34% 31% 10% 24% 26% 12% 0% 2010 2011 2012 2013 1. Half cycle IRR is based on actual drilling and completion costs, production to date…
  6. Coporate Presentation – Yangarra Resources Ltd. – slide 6
    Drilling cost per meter Completion cost per stage 800 250,000 700 200,000 600 500 150,000 400 300 100,000 200 50,000 100 0 0 2010 2011 2012 2013 2010 2011 2012 2013 Q1 2014 Operating costs/boe versus peers Q1 2014…
  7. Coporate Presentation – Yangarra Resources Ltd. – slide 7
    50,000,000 3,500 45,000,000 3,000 40,000,000 35,000,000 2,500 30,000,000 (Cashflow) 2,000 25,000,000 (mboe) 1,500 20,000,000 15,000,000 1,000 10,000,000 500 5,000,000 0 0 2010 2011 2012 2013 2014 (est) Cashflow…
  8. Coporate Presentation – Yangarra Resources Ltd. – slide 8
    P+P Reserves (mboe) Reserve Value PV10 ( millions) 20,000 300 15,000 250 200 Oil 10,000 150 NGL's 100 5,000 Natural gas 50 0 0 2010 2011 2012 2013 2010 2011 2012 2013 P+P Reserves (mboe) Reserve Value PV10 ( millions) 20,000…
  9. Coporate Presentation – Yangarra Resources Ltd. – slide 9
    Increased stage count in laterals from 10 to 24 Gone from 250 tonnes of sand/well to 540 tonnes of sand/well Full mile laterals on all wells with longer reach wells in inventory Resin-coated sand tailed in to prevent crushing Premium…
  10. Coporate Presentation – Yangarra Resources Ltd. – slide 10
    CAPEX budget for 2014 75.0 million Budget focused on Central Alberta Includes 5 million of Duvernay spending Funded with cash flow and the existing credit facilities 2014 Guidance Production (boe/d) Annual Average 3,300 boe/d…
  11. Coporate Presentation – Yangarra Resources Ltd. – slide 11
    Central Alberta Interest in 140 sections of land 70 + horizontal wells drilled since 2010 Focus Pembina Cardium and Glauc plays Edmonton Willesden Green Light oil Ferrier Rocky Mountain House Red Deer High netback Quick…
  12. Coporate Presentation – Yangarra Resources Ltd. – slide 12
    Colorado Group Cardium 650m thick 5m Second White Specks Vertical production 30m exists in all zones Viking 5m All zones meet the criteria for horizontal drilling Glauconitic 20m Ellerslie 10m Rock Creek 15m…
  13. Coporate Presentation – Yangarra Resources Ltd. – slide 13
    Cardium Future Drilling Locations 147 gross (107 net) Locations booked in 2013 Reserve Report 35 gross (29 net) Drill, Complete and Equip 2.7 million 3.2 million Average: 2.9 million NPV10 (90/bbl & 4.00/mcf) (1) 2.4 million 4.7…
  14. Coporate Presentation – Yangarra Resources Ltd. – slide 14
    T45 T45 T45 T44 T44 T44 LO WE UPP T43 R GA CA ER RD SS IU OIL Y M CAR T43 T43 DIU M T42 W IL LO LE W E SD R T42 EN T42 G R EE C A N R…
  15. Coporate Presentation – Yangarra Resources Ltd. – slide 15
    T42 T42 T43 T43 T43 T41 T41 D N LA T42 IS T42 T42 IER R R T40 T40 A B Y LE D T41 A O D CHANNEL any cut amount H N T41 T41 LA T39 T39 IS IE R D R N R LA T40 A B IS…
  16. Coporate Presentation – Yangarra Resources Ltd. – slide 16
    Significant amounts of oil have been produced over the past 30 years from vertical wells 10 to 20 million barrels of Original Oil in Place (OOIP) per section Accumulated 45 gross (35 net) sections Yangarra has 3 horizontal…
  17. Coporate Presentation – Yangarra Resources Ltd. – slide 17
    Let industry de-risk the play Continue land-base to 2020 with strat test wells Larger players are migrating to the Duvernay which may provide opportunities in plays like the Cardium and Glauc in Central Alberta Our first strat test…
  18. Coporate Presentation – Yangarra Resources Ltd. – slide 18
    Early production rates show initial liquids yields up to 200 bbl/MMcf Duvernay operators are still establishing Best Practices for Drilling and Completion Production data supports the emergence of an economically attractive…
  19. Coporate Presentation – Yangarra Resources Ltd. – slide 19
    Very Active Areas with high capital investment currently by majors and large independents North Block primarily in liquids window with new YGR horizontal drilling by NORTH BLOCK Vermillion/Black Swan immediately offsetting (2…
  20. Coporate Presentation – Yangarra Resources Ltd. – slide 20
    Acreage within the liquids/volatile oil fairway South Block (Willesden Green) YGR 7 Net Sections NORTH Net Pay 36 m BLOCK OGIP ranges from 70 to 100 BCF/sec North Block (Pembina) 54 Net Sections YGR Net Pay 20 to 24 m SOUTH…
  21. Coporate Presentation – Yangarra Resources Ltd. – slide 21
    YGR acreage is optimal with high average porosity 6% YGR Acreage TSX: YGR 21
  22. Coporate Presentation – Yangarra Resources Ltd. – slide 22
    Very active Duvernay area within proven liquids window Majors and Independents are investing heavily in the play Shell, Talisman, Black Swan/Paramount are executing multi-well horizontal drilling programs immediately adjacent…
  23. Coporate Presentation – Yangarra Resources Ltd. – slide 23
    R7 R6 R5W5 Talisman 3-28-38-6W5 M SCL HZ 102 FERRIER 4-21-40-7 SCL HZ FERRIER 3-21-40-7 Net Pay (YGR South T40 T40 Block) 36 m Southern Block is de- PARA WILLGR 9-25-39-6 risked by adjacent wells T39 T39 Continuous Duvernay…
  24. Coporate Presentation – Yangarra Resources Ltd. – slide 24
    Vermillion/Black Swan and Sinopec/Daylight have drilled vertical and horizontal test wells adjacent to YGR lands Vermillion/Black Swan Horizontal (completed) PennWest 10-28-48-12W5 Vertical Strat Test Well (Drilling)…
  25. Coporate Presentation – Yangarra Resources Ltd. – slide 25
    Licenses in their primary terms Licenses are adjacent to one another This provides optimal flexibility in terms of validating wells and allocating earned sections (banked sections ) in any of these 3 licenses TSX: YGR 25
  26. Coporate Presentation – Yangarra Resources Ltd. – slide 26
    15-18-49-13W5 7-4 - 49-12W5 7-3-47-11W5 7-1-48-10W5 8-32-46-9W5…
  27. Coporate Presentation – Yangarra Resources Ltd. – slide 27
    Appendix TSX: YGR 27
  28. Coporate Presentation – Yangarra Resources Ltd. – slide 28
    Oil Hedges 2014: 1,200 bbl/d hedged at 95.02/bbl 2015: 1,100 bbl/d hedged at 93.65/bbl Natural Gas Hedges 2014: 5,000 GJ/d hedged at 3.39/GJ or 4.20/mcf* 2015: 2,000 GJ/d hedged at 4.11/GJ or 5.10/mcf* Interest Rate Swaps 4.70% Fixed rate…
  29. Coporate Presentation – Yangarra Resources Ltd. – slide 29
    YGR PEY BNP BXE WCP DTX TVE BNE TOU RMP Production 2,606 74,309 36,342 30,575 5,203 109,953 Gas Weighting 50% 67% 65% 29% 39% 85% Field Netback 47.04 32.41 29.25 55.04 45.55 25.80 Op Costs 8.80 10.47 8.72 14.45 14.51 7.45 Net Royalty…
  30. Coporate Presentation – Yangarra Resources Ltd. – slide 30
    6,000 41% reduction in Drilling Represents 70% average drilling costs of Corporate Costs 5,000 since 2011 473 Staff count is down and performance is up 4,000 498 1,807 373 Equip 3,000 1,792 Complete 1,376 273 Drill 2,000…
  31. Coporate Presentation – Yangarra Resources Ltd. – slide 31
    Second Quarter 2014 Production 2,606 boe /d Liquid Content 51% Sales Price 58.53 /boe Royalty income 0.97 / boe Royalty expense (3.66) / boe Production costs (6.92 / boe Transportation costs (1.87) / boe Field Operating netback…
  32. Coporate Presentation – Yangarra Resources Ltd. – slide 32
    Yangarra Resources Ltd. 1530, 715 5 Ave. SW Calgary, Alberta T2P 2X6 403-262-9558 TSX: YGR 34

From the store

Browse maps, data & reports in the Shale Experts store