Skip to main content 2012 ANNUAL RESULTS – Soco International Plc Investor Presentation | Shale Experts
Loading...

2012 ANNUAL RESULTS – Soco International Plc

Soco International Plc · Mar 11, 2013 · 27 slides

Investor presentation from the Shale Experts oil & gas presentation and slide database. Every page is imaged and its text indexed for search across operators, plays, basins and time.

Slides

  1. 2012 ANNUAL RESULTS – Soco International Plc – slide 1
    2012 Annual Results Presentation 11th March 2013
  2. 2012 ANNUAL RESULTS – Soco International Plc – slide 2
    Preface This presentation, which is confidential and is being supplied in the United Kingdom only to persons with professional experience in matters relating to investments for the purposes of the Financial Services and Markets Act…
  3. 2012 ANNUAL RESULTS – Soco International Plc – slide 3
    2012 Operational Highlights Consolidated the Groups interests in South East Asia portfolio with the 95m acquisition of the outstanding 20% interest in SOCO Vietnam Ltd Record Group net entitlement production volumes of 15,500…
  4. 2012 ANNUAL RESULTS – Soco International Plc – slide 4
    2012 Financial Highlights (from continuing operations) Record revenue of 621.6m (2011: 234.1m), a rise of 166% 134% increase in after tax profits from continuing operations to 207.0m (2011: 88.6m) 271% increase in operating cash…
  5. 2012 ANNUAL RESULTS – Soco International Plc – slide 5
    2012 Financial Summary (audited) (from continuing operations, US million, unless otherwise indicated) 2012 2011 Sales revenue 621.6 234.1 Net Entitlement Production 15,500 boepd vs 6,700 boepd Cash, Equivalents & Liquid Invest 307.6…
  6. 2012 ANNUAL RESULTS – Soco International Plc – slide 6
    Operations 6
  7. 2012 ANNUAL RESULTS – Soco International Plc – slide 7
    Central Vietnam Offshore Basins and Licences Awards ENI BL 114 EXXON BL 117 EXXON BL 118 EXXON BL 119 ENI MURPHY BL 120 BL 144 ORIGIN MURPHY BL 121 BL 145 SANTOS BL 123 PVEP BL 148 PVEP BL 149 MITRA BL…
  8. 2012 ANNUAL RESULTS – Soco International Plc – slide 8
    VietnamCuu Long Basin Blocks Acquired 20% non- controlling interest in SOCO Vietnam for 95 million TGT is largest development project in Companys history; H4-WHP brought on- stream one month early, but one year TGT 30.5% WI…
  9. 2012 ANNUAL RESULTS – Soco International Plc – slide 9
    CNV Field Fractured granitic Basement field Producing at steady ca. 8,000 boepd Finalising calibration of additional separation and metering facilities Additional production well planned for 2013 expected to add ca. 3-…
  10. 2012 ANNUAL RESULTS – Soco International Plc – slide 10
    Te Giac Trang Field Layout FPSOTGT 1 H1WHP FPSO Storage Capacity: 4 x 10 Multiphase Pipelines 620,000 BBLS 10 Water Injection Pipeline Processing Capacities: 8 Gaslift Pipeline Crude oil rate 55,000 BOPD Produced water rate…
  11. 2012 ANNUAL RESULTS – Soco International Plc – slide 11
    TGT 2013 Well Locations TGT-17P H1 WI/Appraisal H3 Appraisal H2 South Appraisal H5 Appraisal 11
  12. 2012 ANNUAL RESULTS – Soco International Plc – slide 12
    Preparation for 2014 Well Campaign 2014 initial well locations: WI in H.1.1/H1.2 Block WI in H4 Block TGT-H2S App or H2 2nd Dev 12
  13. 2012 ANNUAL RESULTS – Soco International Plc – slide 13
    Independent Confirmation of TGT Resources Range (low to high case) STOIIP (mmstb) 470 960 1 Recoverable Gas (mmboe) 15 30 Future activities will significantly de-risk high case Additional 10 infield and step out wells (e.g.…
  14. 2012 ANNUAL RESULTS – Soco International Plc – slide 14
    Supporting Higher TGT Recovery Factors Range (low to high case) Independent Estimate 28% 35% SOCO Estimate 32% 50% Reservoir quality and reservoir geometry in TGTs individual sands supports SOCO recovery factor estimates:…
  15. 2012 ANNUAL RESULTS – Soco International Plc – slide 15
    West to East Cross Section TGT3P TGT16P TGT2X TGT7P TGT1P TGT15P TGT5P TGT2P West East Water Cut 60% 30% 0% 35% 5.2 Upper Aquifer Support 5.2 Lower Olig-C TGTH15P TGTH11P TGTH12P TGTH116P TGTH13P TGTH115P TGT2X…
  16. 2012 ANNUAL RESULTS – Soco International Plc – slide 16
    TGT Activities to deliver Performance Complete FPSO sustained capacity test (beyond 55,000 bopd) Calibrate process simulation model for early debottlenecking Enhance production management techniques Focus on individual sand…
  17. 2012 ANNUAL RESULTS – Soco International Plc – slide 17
    Central African Portfolio 17
  18. 2012 ANNUAL RESULTS – Soco International Plc – slide 18
    North Congo BasinCurrent Portfolio 100% WI Added Nanga II A block and commencing seismic reprocessing 40.39% WI Preparing to drill Lideka East on Marine XI in 2H13 Have a non- refundable deposit 17% WI to sell Cabinda to…
  19. 2012 ANNUAL RESULTS – Soco International Plc – slide 19
    Cabinda North Selling entire equity in two stage disposal deal Initial non-refundable deposit received Expect completion by end March 19
  20. 2012 ANNUAL RESULTS – Soco International Plc – slide 20
    Marine XILideka East + Prospects and Discoveries Estimated mean predrill recoverable resources c. 70 mmbbl in primary target Sendji formation COS 40% Estimated mean upside recoverable resources c. 60 mmbbl in secondary…
  21. 2012 ANNUAL RESULTS – Soco International Plc – slide 21
    Nganzi Block Ongoing seismic depth reprocessing of two vintages of 2D time seismic to validate existing Leads and Prospects Obtained 6 month PSC extension Drill or Drop decision to be made by September 2013. If drill, then…
  22. 2012 ANNUAL RESULTS – Soco International Plc – slide 22
    Block V Activity Completed detailed environmental study together with relevant DRC authorities Activity suspended during M23 insurgency With Peace Accord signature, targeted to resume Aeromag acquisition in May-June Block V…
  23. 2012 ANNUAL RESULTS – Soco International Plc – slide 23
    Drilling Schedule & Potential Reserve Implication 2013 Potential March April May June July August Sept Oct Nov Dec Reserves Vietnam 40 80 4 Infield wells +TGTH5 Congo (Brazzaville) 60 130 Lideka East Marine DR Congo…
  24. 2012 ANNUAL RESULTS – Soco International Plc – slide 24
    Conclusion & Outlook 24
  25. 2012 ANNUAL RESULTS – Soco International Plc – slide 25
    Outlook Continued strong cash generation from the Vietnam assets Development drilling on TGT and CNV Appraisal well on the previously undrilled TGT H5 block Sustained capacity test on TGT FPSO pending Exploration drilling on…
  26. 2012 ANNUAL RESULTS – Soco International Plc – slide 26
    Going Forward into 2013 and Beyond Very strong financially and will be generating more cash with stable production of ca. 16,000 boepd. Offers more options in enhancing shareholder value through development of the current portfolio…
  27. 2012 ANNUAL RESULTS – Soco International Plc – slide 27
    SOCO International plc 48 Dover Street London W1S 4FF United Kingdom Tel: 020 7747 2000 Fax: 020 7747 2001 Registered No: 3300821 www.socointernational.com 27

From the store

Browse maps, data & reports in the Shale Experts store