Skip to main content 2011 RENEWABLE POWER AND CLEAN TECH FORUM – Altagas Limited Investor Presentation | Shale Experts
Loading...

2011 RENEWABLE POWER AND CLEAN TECH FORUM – Altagas Limited

Altagas Limited · May 17, 2011 · 35 slides

Investor presentation from the Shale Experts oil & gas presentation and slide database. Every page is imaged and its text indexed for search across operators, plays, basins and time.

Slides

  1. 2011 RENEWABLE POWER AND CLEAN TECH FORUM – Altagas Limited – slide 1
    AltaGas Ltd. National Bank Financial 2011 Renewable Power and Clean Tech Forum David Harris, President Power May 17, 2011
  2. 2011 RENEWABLE POWER AND CLEAN TECH FORUM – Altagas Limited – slide 2
    Forward-looking information Certain information presented today may constitute forward-looking statements with respect to AltaGas Ltd. Such statements reflect the Companys current expectations, estimates, projections and assumptions.…
  3. 2011 RENEWABLE POWER AND CLEAN TECH FORUM – Altagas Limited – slide 3
    AltaGas Ltd. (TSX:ALA) Diversified energy Financial strength infrastructure BBB (stable) credit rating Enterprise value 3 billion Bank liquidity of 1 billion Natural gas gathering and Debt-to-total capitalization 43 processing liquids…
  4. 2011 RENEWABLE POWER AND CLEAN TECH FORUM – Altagas Limited – slide 4
    Were a leading energy infrastructure company Gas Asset Base Growth 1.6 Bcf/d interests in six extraction 120 Mmcf/d Gordondale gas plant under facilities development 1.2 Bcf/d gas processing 250 Mmcf/d Harmattan Co-stream project…
  5. 2011 RENEWABLE POWER AND CLEAN TECH FORUM – Altagas Limited – slide 5
    Building a diversified energy portfolio 5
  6. 2011 RENEWABLE POWER AND CLEAN TECH FORUM – Altagas Limited – slide 6
    Significant progress on capital growth plans Objective: 2 billion in organic growth (2010-2016) 2010 progress report: Approximately 1.4 billion in committed growth capital secured (includes 2010 200 million) Awaiting regulatory…
  7. 2011 RENEWABLE POWER AND CLEAN TECH FORUM – Altagas Limited – slide 7
    Stable cash flow and earnings EBITDA: 244 million Operating income: 152 million Funds from operations: 195 million Net income: 97 million Normalized FFO payout: 56% Net income per share: 1.19 Dividend: 1.32 *TTM ending March 31,…
  8. 2011 RENEWABLE POWER AND CLEAN TECH FORUM – Altagas Limited – slide 8
    Our Gas portfolio 8
  9. 2011 RENEWABLE POWER AND CLEAN TECH FORUM – Altagas Limited – slide 9
    Employing clean technology in Gas Heat recovery Captures the exhaust heat from natural gas turbines and uses it to supply heat to the fractionation process Flare gas recovery Captures and recovers gas from various low-pressure…
  10. 2011 RENEWABLE POWER AND CLEAN TECH FORUM – Altagas Limited – slide 10
    Harmattan Complex gas initiatives Heat recovery: Residue gas compression, operational since 2008 Increase plant fuel efficiency 5% Creates emissions performance credits 13k tonnes of CO2 equivalent each year Recovery of 201,538 GJs…
  11. 2011 RENEWABLE POWER AND CLEAN TECH FORUM – Altagas Limited – slide 11
    Harmattan Complex (continued) Flare Gas Recovery Unit (FGRU): In service 2008 The FGRU recovers 628GJ/day Cost savings of 2k/day Emissions reduction of 20k tonnes in 2010 CO2 recovery: Producing approximately 50k tonnes of CO2…
  12. 2011 RENEWABLE POWER AND CLEAN TECH FORUM – Altagas Limited – slide 12
    Other clean technology initiatives Acid gas injection: Bantry, Princess, Pouce Coupe and Turin Generating emissions offsets = approximately 9.2 million in 2010 Increase efficiency with more methane to market 95k tonnes of CO2…
  13. 2011 RENEWABLE POWER AND CLEAN TECH FORUM – Altagas Limited – slide 13
    Our Power portfolio 13
  14. 2011 RENEWABLE POWER AND CLEAN TECH FORUM – Altagas Limited – slide 14
    Renewable and clean technology in Power Renewable: Wind power Run-of-river power Clean technology: Cogeneration Waste heat recovery 14
  15. 2011 RENEWABLE POWER AND CLEAN TECH FORUM – Altagas Limited – slide 15
    Harmattan Complex power initiatives Cogen I and II: 15MW, in service Q4, 2010 Increase plant fuel efficiency 15% We are reducing our CO2 equivalent by 44,000 tons/year The facilities consist of natural gas turbine/generators…
  16. 2011 RENEWABLE POWER AND CLEAN TECH FORUM – Altagas Limited – slide 16
    Crowsnest Pass project Waste heat recovery project in Sparwood, BC: 6MW, 60% interest Using the exhaust of gas turbines that would otherwise be vented to the atmosphere. Use the steam to create electricity which will be sold to the…
  17. 2011 RENEWABLE POWER AND CLEAN TECH FORUM – Altagas Limited – slide 17
    Delivering successful renewable power projects Efficient geographic footprint Strong contractual underpinnings / low cost Proximity to transmission and markets Minimal impact to environment Class 2 wind or better Permitability…
  18. 2011 RENEWABLE POWER AND CLEAN TECH FORUM – Altagas Limited – slide 18
    Renewable power Bear Mountain Wind Park 102 MW Operational since Oct 2009 25 year EPA with BC Hydro Ecologo, GreenE, California RPS Certified Own Renewable Energy Credits (REC) 18
  19. 2011 RENEWABLE POWER AND CLEAN TECH FORUM – Altagas Limited – slide 19
    Wind Power 260 MW advanced development Walker Ridge (70 MW) in Glenridge (100 MW) in California Alberta Five years wind data Good wind data Good access to Close to fully permitable transmission and market Good access to…
  20. 2011 RENEWABLE POWER AND CLEAN TECH FORUM – Altagas Limited – slide 20
    Renewable energy run-of-river Eskay Creek Mine 20
  21. 2011 RENEWABLE POWER AND CLEAN TECH FORUM – Altagas Limited – slide 21
    Run-of-river - NW Projects Forrest Kerr McLymont and Volcano Creek 270 MW capacity, in service mid-2014 Two developments totaling approximately 80 MW capacity 55 percent capacity factor In-service estimate: 2015-2016 60 year EPA…
  22. 2011 RENEWABLE POWER AND CLEAN TECH FORUM – Altagas Limited – slide 22
    Forrest Kerr - tunneling 22
  23. 2011 RENEWABLE POWER AND CLEAN TECH FORUM – Altagas Limited – slide 23
    Headwork and intake area 23
  24. 2011 RENEWABLE POWER AND CLEAN TECH FORUM – Altagas Limited – slide 24
    Construction activities - tunneling Total linear meters of tunneling: 4,870m Tunnel dimension: 10mX10m Three portals/access points Power tunnel intake Access tunnel Tailrace discharge Keys to successful tunneling: Consistent…
  25. 2011 RENEWABLE POWER AND CLEAN TECH FORUM – Altagas Limited – slide 25
    Aerial view of camp site and staging areas 25
  26. 2011 RENEWABLE POWER AND CLEAN TECH FORUM – Altagas Limited – slide 26
    Predictable, sustainable hydrological data 900 800 700 600 Discharge (m/s) Water flow used for generation 500 400 300 200 Design discharge of 252 m/s 100 Minimum release of 10 m/s 0 Jan Feb Mar Apr May…
  27. 2011 RENEWABLE POWER AND CLEAN TECH FORUM – Altagas Limited – slide 27
    Offsetting our CO2 emissions Reduced our GHG emissions by 1.3 million tonnes Reduced our GHG compliance costs by 5.6 million External Internal 27
  28. 2011 RENEWABLE POWER AND CLEAN TECH FORUM – Altagas Limited – slide 28
    Building a diversified power business Generation Capacity by Fuel Type 2010 2016E 28
  29. 2011 RENEWABLE POWER AND CLEAN TECH FORUM – Altagas Limited – slide 29
    Heritage Gas Ltd. providing a cleaner option Gas provides a 30-50% emissions advantage over oil Heritage Gas customers cumulative CO2 reductions at the end of 2010 were over 100,000 tonnes Partner with Efficiency Nova Scotia to…
  30. 2011 RENEWABLE POWER AND CLEAN TECH FORUM – Altagas Limited – slide 30
    Growing and diversifying EBITDA Growing earnings Adding highly contracted, long-life infrastructure Enhancing earnings stability Increasing renewable portfolio Reducing emissions intensity 22% 23% 5% 34% 30
  31. 2011 RENEWABLE POWER AND CLEAN TECH FORUM – Altagas Limited – slide 31
    Funding our 2011-2016 committed capital 1,100mm committed capital 1,200mm FCF (past 3 year average) 180mm DRIP 700mm dividends (at current rate) 1,000mm current bank liquidity* 1,800 million in uses 2,400 million in sources…
  32. 2011 RENEWABLE POWER AND CLEAN TECH FORUM – Altagas Limited – slide 32
    Financial discipline Strong balance sheet Balanced debt maturity profile 32
  33. 2011 RENEWABLE POWER AND CLEAN TECH FORUM – Altagas Limited – slide 33
    Looking forward 2011 2012 Stronger results from all Projects in service: businesses Co-stream Gordondale Phase I complete Cogen II Younger pipeline complete Waste heat recovery Higher deferred taxes Gordondale (non-cash…
  34. 2011 RENEWABLE POWER AND CLEAN TECH FORUM – Altagas Limited – slide 34
    AltaGas is a good place to be Strong, diversified asset base of gas, power Attractive portfolio of and utilities energy infrastructure Capital growth focused on stable, long-term contracted projects and regulated asset growth assets…
  35. 2011 RENEWABLE POWER AND CLEAN TECH FORUM – Altagas Limited – slide 35
    Q&A Questions 35

From the store

Browse maps, data & reports in the Shale Experts store