Significant progress on all fronts 2014/15 Bentley Re-financed the balance sheet Heavy oil: 10-12 API Created a development group to support the Bentley project High permeability reservoir: 47D Entered into collaborations Wood…
Cost-effective, sustainable development plan 2015 2P Reserves increased to 265 MMstb NPV10 increased to 2.3bn Xcite Energy Limited 2015 AGM 9
Bringing it all together Progress on many fronts Advanced our understanding of the reservoir and fluids Technical and engineering programmes Further optimisation of the development plan and execution strategy Better definition over…
Understanding what we have, and exploiting that. Identify Risks and Uncertainties Manage Risks and Uncertainties Wells Reservoir Drilling Controls Structure Facilities Fluids Chemistry Technology Drive Costs Appraisal…
Develop subsurface clarity Depositional model defined Facies distribution 2014 Improved control on reservoir distribution Reservoir Detailed properties Improved updated petrographic geological review Bentley definition…
Fluid Analysis The Bentley Flow Loop PVT Analysis Dead Oil Analysis Compatibility Analysis Assay Water Chemistry Gas Analysis Production Chemicals Testing EOR Xcite Energy Limited 2015 AGM 13
Optimising the development plan: Wells learning curve A North Sea Example The Importance of Planning The The Rate of Learning Achieved Drilling Performance Limit The Technical Limit well 1 well 2 well 3 well 4 well 5…
Optimising the development plan: Reducing risk, maximising security Risk assessment Quad Lateral Base Case Design Decision Matrix - Well Configuration Well Lateral Configuration Acceptable Single Dual Dual-Dual Tri Quad 5, 7 or 9…
Optimising the development plan: Maximise well coverage Maximise Well Coverage Extended reach wells Remove subsea wells Increased reservoir drainage Xcite Energy Limited 2015 AGM 16
Managing water is an essential feature for recovery Modelled Saturation after 35 Years Production Understand Reservoir, Fluids Homogeneous, high net to gross reservoir, 47D, 1500cP 15 bn barrel aquifer - bottom-drive Strong…
Production profiles reflect high water cut and longevity Full Field (FPD + SPD) FPD: 24 slots 21 producers; 3 water injectors; 270k fluid facilities SPD: 20 slots 14 producers; 3 water injectors; 1 gas producer; 2 spare; 270k fluid…
Optimising the development plan 2014 RAR 20 slot FPD Platform (PUQ); Remote Floating Storage and Offloading (FSO) vessel with 1.7km Pipeline Bundle; Gas Import facilities; Subsea Satellites for Bentley North and West (Producers…
First Phase Development (FPD) Concept Xcite Energy Limited 2015 AGM 20
Summary It has been a highly productive year Bentley development plan is in good shape Continue to focus on factors we can influence Creating funding options to deliver the desired outcome funding for the Bentley FDP Thank…
Questions & Answers Xcite Energy Limited 2015 AGM 23