Conceptualising a new Infrastructure Hub West of Shetland (WoS) Basement Reservoir Specialists Hurricane Devex 21 May 2015
Presentation overview Introduction Background to Hurricanes CPR concept selection Optimising the Lancaster story An option for a Hub West of Shetland Hurricane Devex 21 May 2015
Acknowledgements Thanks to all the Service Companies that have supported, offered guidance and had input into our concept selection process over the last 36 months In particular a special thanks to: - Costain Upstream Peter Kirkbride…
Introduction who are we Neil Platt COO - Undertaken a number of operational and commercial roles in Amoco, BG and Petrofac - Joined Hurricane in 2011 - Responsible for daily operations and asset delivery Hurricane - An E&P company…
Hurricane overview Awarded our first licence (P1368) in 2005 During an 8 year drilling program, concentrating on basement plays WoS we have; - Discovered over 400 million barrels of 2C resource - Identified over 400 million barrels of…
Significant resource discovered and large upside potential to confirm Hurricanes assets: Contingent and Prospective Resources Source: CPR November 2013 MMboe Schiehallion Field Foinaven Field Whirlwind 2C 205 MMboe (Oil…
Lincoln Hurricane assets on Lancaster the Rona Ridge Whirlwind 1km Hurricane Company presentation June 2014 AIM ticker: HUR
Infrastructure and fields West of Shetland Enboll Laxford Infrastructure (existing and fields and proposed) Rosebank 214/27-1 Glenlivet West of Shetland Torridon Victory (existing and proposed) Laggan Tormore Cambo Clair…
Lancaster Hurricanes Lancaster asset: Contingent and Prospective Resources Source: CPR November 2013 MMboe Lancaster Depth (m) -1000 -1500 -2000 -2500 -3000 -3500 -4000 -4500 Hurricane Devex 21 May 2015
Physical challenges we face Location Environment We dont Lack of know, what Infrastructure we dont know Hurricane Devex 21 May 2015
Instead of thinking outside the box, get rid of the box Deepak Chopra Hurricane Devex 21 May 2015
Moving forward Given our resource base, we: - Worked with Costain Upstream to undertake a concept selection process over 18 months, during which we: Assessed over 45 possible concepts Floating vs platform Owned vs leased vs 3rd party…
Technical considerations Platform vs Phased vs Hub vs FPSO Pre-invested 3rd Party Host Artificial Lift Oil Export Leased vs Gas Handling Flow Assurance Purchased Hurricane Devex 21 May 2015
10 Full Field concepts further evaluated Concept Selection Technical Evaluation 100.0 90.0 80.0 Selected CPR Base Case (2 phases) 70.0 60.0 50.0 40.0 30.0 20.0 10.0 0.0 FPSO FPSO Sevan FPSO FPSO…
Phase 1 - objectives Provide long term production data to support Full Field Development planning Deliver an acceptable return on capital invested with appropriate allowance for development risks and production efficiency…
Phase 1 - objectives Hurricane Devex 21 May 2015 1
Phase 2 - objectives Maximise Full Field economics Ability to handle Lancaster upside volumes Flexibility to handle uncertainties of production from basement Potential to be used as a hub for future area developments…
Hurricane Devex 21 May 2015 2
Technical considerations Platform vs Phased vs Hub vs FPSO FPSO Phased Pre-invested Hub 3rd Party Host Artificial Lift Oil Export Leased vs Gas Handling Flow Assurance Purchased Hurricane Devex 21 May 2015
Technical considerations Platform vs Phased vs Hub vs FPSO FPSO Phased Pre-invested Hub 3rd Party Host Artificial Lift Oil Export Phase 1 Leased Leased vs Gas Handling Phase 1 Leased Flow Assurance Purchased Phase 2…
Technical considerations Platform vs Phased vs Hub vs FPSO FPSO Phased Pre-invested Hub 3rd Party Host Artificial Lift Shuttle Tanker Oil Export Phase 1 Leased Leased vs Gas Handling Phase 1 Leased Flow Assurance…
Flow assurance Flow assurance studies were undertaken with respect to the management of reservoir fluids within: - The wellbore - Subsea facilities; and - FPSO topside design Specific studies looked at the impact and requirement…
Artificial lift Various artificial lift methods were studied to: - Support reservoir management on the Lancaster field, characterised today by a: Shallow, normally pressured oil reservoir Reservoir near bubble point Reservoir where…
Technical considerations Platform vs Phased vs Hub vs FPSO FPSO Phased Pre-invested Hub 3rd Party Host Artificial Gas LiftLift Shuttle Tanker Oil Export Gas Compression for: Phase 1 Leased Heated Flowlines Leased vs…
FPSO capacities Parameter Units Phase 1 Phase 2 Name Plate Gross Fluids Capacity bpd 75,000 181,000 Name Plate Oil Capacity bopd 37,500 80,000 Name Plate Prod Water Capacity bpd 50,000 150,000 Name Plate Gas Export Capacity MMscfd 12…
CPR phased development capital reservoir expenditure performance LoC zero FPSO commercial construct capital reservoir expenditure performance LoC c. 750m Triangle colours represent Hurricanes perception of challenge in…
Optimising the Lancaster story Over the last c. 18 months, with a declining oil price and increasing financial market constraints, we challenged ourselves to deliver an alternative to the CPR Phase 1 at reduced CAPEX, but one that…
Early Production System (EPS) - objectives Provide long term production data to support Full Field Development planning Deliver an acceptable return on capital invested with appropriate allowance for development risks and…
To provide long term production data to confirm the productivity of the Lancaster Reservoir to enable full field development planning and sanction To deliver an acceptable return on capital invested with appropriate allowance for…
205/21a-6 a high quality dynamic dataset Lancaster 1km horizontal appraisal well (205/21a-6) drilled 2014 Max stabilised flow rates: - 5,300 bopd (natural) - 9,800 bopd (ESP) - Both constrained by surface equipment No formation…
EPS conundrum implications post 205/21a-6 capital reservoir expenditure performance LoC FPSO commercial construct Triangle colours represent Hurricanes perception of challenge in todays oil price and financial environment…
Optimising the EPS concept Post the 2014 horizontal appraisal well results, Hurricane has been able to: - Focus on EPS simplification and capex reductions - De-risk EPS project schedule - Rely on a single well at first oil (existing…
Hurricane Devex 21 May 2015
EPS DP FPSO solution Evolve a solution from existing proven FPSO technology, combined with dynamic positioning (DP) Based on a disconnectable turret system, proven in the North Sea, Gulf of Mexico and Australia Hurricane Devex 21…
FPSO simplified process to support EPS Hurricane Devex 21 May 2015
Technical considerations (EPS) Platform vs Potential to vs Phased Hub vs FPSO Phased Hub 3rd Party Host FPSO replacePre-invested Phase 1 Gas Lift replaced Gas Lift Shuttle Tanker by ESPs Gas GasCompression Compression…
FPSO capacities Parameter Units EPS Phase 1 Phase 2 Name Plate Gross Fluids Capacity bpd 20,000 75,000 181,000 Name Plate Oil Capacity bopd 20,000 37,500 80,000 Name Plate Prod Water Capacity bpd 10,000 50,000 150,000 Name Plate Gas…
Optimising the EPS concept Post the 2014 horizontal appraisal well results, Hurricane has been able to: - Focus on EPS simplification and capex reductions - De-risk EPS project schedule - Rely on a single well at first oil (existing…
EPS conundrum implications post 205/21a-6 capital reservoir expenditure performance Capital Contribution FPSO commercial construct Triangle colours represent Hurricanes perception of challenge in todays oil price and…
Early Production System (EPS) - objectives Provide long term production data to support Full Field Development planning Deliver an acceptable return on capital invested with appropriate allowance for development risks and…
Phased concept today Hurricane Devex 21 May 2015
Lancaster + Lincoln = GLA Lincoln Hurricanes Lancaster & Lincoln assets: Contingent and Prospective Resources Source: CPR November 2013 MMboe Lancaster Depth (m) -1000 -1500 -2000 -2500 -3000 -3500 -4000…
An option for a WoS Hub concept In the challenging environment we live in today an approach on how field collaboration can deliver a hub concept rather than a field specific solution WoS Greater Lancaster Area (GLA) Lancaster +…
Hurricane Devex 21 May 2015
An option for a WoS Hub concept In the challenging environment we live in today an approach on how field collaboration can deliver a hub concept rather than a field specific solution WoS Greater Lancaster Area (GLA) Lancaster +…
5 0 Hurricane Devex 21 May 2015
Extending the concept The bigger picture WoS & UK Plc Shared HUB Hurricane Devex 21 May 2015
Extending the concept The bigger picture WoS & UK Plc Participants generate value Government incentivises shared from equity in fields delinked hub concepts - benefiting all from infrastructure ownership users Shared HUB…
Extending the concept The bigger picture WoS & UK Plc The Wood The Perfect OGAs Review Location Call To Action WoS Industry Potential Shared HUB Support Government Maximising Infrastructure Support Economic Recovery…
Conclusions Acquiring a high quality dynamic dataset from the 2014 horizontal well has improved Hurricanes understanding of the behaviour of the fractured basement reservoir The analysis of the well test and subsequent concept…