  1. May 2015 Corporate Presentation – Cequence Energy Ltd. – slide 1
    cequence energy ltd MAY 2015 1
  2. May 2015 Corporate Presentation – Cequence Energy Ltd. – slide 2
    Corporate Highlights Announced a 54 million midstream partnership which will give Cequence access to both major pipeline systems in Alberta while retaining 50% interest in Simonette infrastructure Corporate production averaged…
  3. May 2015 Corporate Presentation – Cequence Energy Ltd. – slide 3
    Corporate Profile Trading Symbol TSX: CQE Q1 2015 Production (Boe/d) 11,217 52-week trading range 0.79 - 3.21 Shares outstanding 211 MM Insider ownership 13% FD Market capitalization (1) 211 MM Net Debt - March 31, 2015(2) 83 MM…
  4. May 2015 Corporate Presentation – Cequence Energy Ltd. – slide 4
    Reserves and Finding Costs solid growth per share in reserves and value FD&A (/Boe) Reserves 2P Reserve Value 16.00 140 0.7 1200 6 Reserves increased 3 year average 140% since 2010 14.00 118 10.77 per Boe 120 0.6 1,004 113 1000…
  5. May 2015 Corporate Presentation – Cequence Energy Ltd. – slide 5
    Corporate Production and Cash Costs Production (Boe/d) Cash Cost (/Boe) 16,000 20 Simonette driving growth 18 14,000 Sold 588 boed of 16 12,000 annualized Ansell Merger with 14 Temple Energy production in 10,000 2014 12…
  6. May 2015 Corporate Presentation – Cequence Energy Ltd. – slide 6
    Excellent Cash Cost & Production Growth vs Peer Group Cequence in top quartile for peer cash cost Strong production and PDP reserve growth per share including companies with different commodity mix *Peters & Co. March, 2015…
  7. May 2015 Corporate Presentation – Cequence Energy Ltd. – slide 7
    Corporate Guidance March 2015 Revised 2015(4) 2015 Guidance Guidance Average Production (Boe/d)(1) 11,500 11,500 Capital expenditures, net of dispositions 60 MM 40 MM Operating and transportation costs per Boe 8.80 9.20 G&A…
  8. May 2015 Corporate Presentation – Cequence Energy Ltd. – slide 8
    Simonette Cequences Key Asset 94-G-9 94-H-11 94-H-16 R11 R9 R7 R5 R3 R1W6 R23 R21 R19 R17 R15 R13 R10W5 Approximately 120 km SE of Grande Prairie 94-G-2 Simonette is 85% of corporate production, and 95%+ of capital CANADA…
  9. May 2015 Corporate Presentation – Cequence Energy Ltd. – slide 9
    Alberta Deep Basin Montney- An active area R9 R8 R7 R6 R5 R4 R3 R2 R1W6 R26 R25 R24 R23 R22 R21W5 T69 Cequence Simonette lands on T68 Montney trend NUVISTA T67 Numerous companys with active Montney drilling programs on trend T66…
  10. May 2015 Corporate Presentation – Cequence Energy Ltd. – slide 10
    Simonette Egress Strategic location near major infrastructure Optionality on both major gas systems in Alberta 104-P-15 94-M-15 94-N-15 94-O-15 94-P-15 R8 R1W6 R14 R8 R1W5 R13 R8 R1W4 R12 R7 R23W2 R2 R1W6 R27 R26 R25 R24 R23W5…
  11. May 2015 Corporate Presentation – Cequence Energy Ltd. – slide 11
    Simonette Montney 2014/15 Winter Drilling Activity R1W6 R27 R26 R25W5 6 miles 10 recent wells performing as expected with last two reported IP 30 rates 6 T62 MMcf/d gas and 32 bbl/mmcf free condensate 12-26 PAD Costs coming…
  12. May 2015 Corporate Presentation – Cequence Energy Ltd. – slide 12
    Montney Drilling, Completion and Wellsite Equipment Costs - Repeatable execution demonstrated Pad drilling times and costs continue to improve 2013/14 well avg: 9.0 MM drill and Larger fracs being placed efficiently using ball drop…
  13. May 2015 Corporate Presentation – Cequence Energy Ltd. – slide 13
    Cequence Montney Gas Well Performance 2014/15 Winter season (June to March) 2014-15 winter program 10 Gross (9 net) wells from pads Consistent repeatable results Increased frac intensity should deliver improved long term…
  14. May 2015 Corporate Presentation – Cequence Energy Ltd. – slide 14
    Montney Half Cycle Economics Wells are economic at strip prices BASE CASE- HALF CYCLE ECONOMICS 7 bcf CASE Budget model IP (MMcf/d) 5.5 7.5 100 IP 30 (MMcf/d) 4.6 6.9 EUR (MBoe) 925 1,290 95 Greater than 20% IRR Raw Gas (Bcf)…
  15. May 2015 Corporate Presentation – Cequence Energy Ltd. – slide 15
    Simonette Upper Montney Development Plan R1W6 R27 R26 R25W5 Approximately 200 Upper 6 miles locations depending on optimum well length, interwell spacing and T62CURRENT commodity price HORIZONTAL TARGET 2.3 TCF DPIIP (1) in…
  16. May 2015 Corporate Presentation – Cequence Energy Ltd. – slide 16
    Simonette Dunvegan - evaluating oil potential this summer R2 R1W6 R27 R26 R25W5 Dunvegan Oil play T63 Recent 13-18 Dunvegan E Oil Two separate oil plays Discovery emerging offsetting CQE land CTD 95 MBO (1 year) Nearby 13-18…
  17. May 2015 Corporate Presentation – Cequence Energy Ltd. – slide 17
    Dunvegan Gas Model 22 Working HALF CYCLE ECONOMICS 10-02-61-02W6 Model 20 05-02-61-02W6 IP (MMcf/d) 10.5 IP 30 (MMcf/d) 9.3 18 11-12-061-02W6/02 EUR (MBoe) 1050 Raw Gas (Bcf) 6.0 02-11-061-02W6 Condy (MBbl) 60 16 Working…
  18. May 2015 Corporate Presentation – Cequence Energy Ltd. – slide 18
    Hedging Contract Type Volume GJ/d CAD Price 2015 January 1, 2015 to March 31, 2015 Average Gas Swap 27,583 3.67/GJ AECO 2015 April 1, 2015 to September 30, 2015 Average Gas Swap 30,000 3.36/GJ AECO 2015 October 1, 2015 to…
  19. May 2015 Corporate Presentation – Cequence Energy Ltd. – slide 19
    Conclusions Strong consistent operational success moving to Montney pad development Production growth achieved Preserve our balance sheet with reduced capex program in 2015 & Midstream partnership Solid hedge position 20
  20. May 2015 Corporate Presentation – Cequence Energy Ltd. – slide 20
    Appendix Cequence Simonette 13-11 Compressor Station 21
  21. May 2015 Corporate Presentation – Cequence Energy Ltd. – slide 21
    Management and Board Management Team Board of Directors Paul Wanklyn - President and CEO Don Archibald - Chairman Todd Brown VP & COO Peter Bannister Steve Stretch - VP Exploration and Chief Geophysicist Rob Cook Dave Gillis…
  22. May 2015 Corporate Presentation – Cequence Energy Ltd. – slide 22
    Simonette Deep Basin Stack Dunvegan Wilrich Montney Simonette Upper CURRENT HORIZONTAL TARGET ZONE Falher Bluesky / Gething Simonette Lower POTENTIAL HORIZONTAL TARGET ZONE 23
  23. May 2015 Corporate Presentation – Cequence Energy Ltd. – slide 23
    Multiple Zones with Significant Resource Potential at Simonette R2 R1W6 R27 R26 R25 R24 R23W5 CEQUENCE LAND Zone Total Resource Potential/Sec (1) 2,400m Dunvegan 5-25 BCF 2,500m Falher 5-24 BCF 2,700m Wilrich 5-24…
  24. May 2015 Corporate Presentation – Cequence Energy Ltd. – slide 24
    Simonette Falher and Wilrich plays R2 R1W6 R27 R26 R25W5 Falher play 60 P&NG to Base BLUESKY BULLHEAD 75 55 2099-DEC-31 P&NG From Base CARDIUM FM To Base FERNIE 50 50 P&NG to Base BLUESKY BULLHEAD 2015-JAN-12 P&NG FromBase DU…
  25. May 2015 Corporate Presentation – Cequence Energy Ltd. – slide 25
    Falher Model strong economics with 28 well inventory 14 Working HALF CYCLE ECONOMICS Model 16-18-061-01W6 IP (MMcf/d) 7.8 07-06-061-01W6 IP 30 (MMcf/d) 6.0 12 EUR (MBoe) 800 08-18-061-01W6 Raw Gas (Bcf) 4.0 3 well avg Condy…
  26. May 2015 Corporate Presentation – Cequence Energy Ltd. – slide 26
    www.cequence-energy.com Contacts: 3100, 525 - 8th Avenue SW Calgary AB T2P 1G1 Paul Wanklyn David Gillis President & CEO Vice President, Finance & CFO Phone: 403-229-3050 Fax: 403-229-0603 pwanklyncequence-energy.com…