June 2015 Corporate Presentation – Primeline Energy Holdings

Primeline Energy Holdings · Jun 4, 2015 · 29 slides

Investor presentation from the Shale Experts oil & gas presentation and slide database. Every page is imaged and its text indexed for search across operators, plays, basins and time.

Slides

  1. June 2015 Corporate Presentation – Primeline Energy Holdings – slide 1
    Primeline Energy Holdings Inc: Producing to Chinas dynamic gas market and monetizing upside June 2015 Primeline Corporate Presentation June 2015 1
  2. June 2015 Corporate Presentation – Primeline Energy Holdings – slide 2
    The independent E&P play on Chinas dynamic gas market 1. TSX-V listed E&P China gas play with clean balance sheet (no convertible etc.) and strong management team. 2. 700m+ regional production infrastructure hub in East China Sea in…
  3. June 2015 Corporate Presentation – Primeline Energy Holdings – slide 3
    Structure and assets PEH has announced plans to acquire its affiliate Primeline Petroleum Corporation (PPC). PPC is 100% controlled by Victor Hwang, PEH Chairman/majority shareholder. The transaction is expeted to complete on July…
  4. June 2015 Corporate Presentation – Primeline Energy Holdings – slide 4
    East China gas market - High growth, high price Chinas dynamic economic growth in the past 25 years has created the worlds 2nd largest energy market. Chinas current energy needs are met mostly by coal and oil (58% of the latter is…
  5. June 2015 Corporate Presentation – Primeline Energy Holdings – slide 5
    Access to Zhejiang gas grid LS36-1 is a strategic gas field close to Zhejiang Province - population of 50 Ningbo LNG million 4th largest economy in China. Current Zhejiang gas grid usage is at 6.8 bcmpa (has doubled in just…
  6. June 2015 Corporate Presentation – Primeline Energy Holdings – slide 6
    East China Sea becoming a significant gas production basin Proven petroleum province. New E&P focus in Xihu Trough (Basin) in northern East China Sea, anchored on two existing fields: Pinghu Field: onstream in 1998, 386 km 14…
  7. June 2015 Corporate Presentation – Primeline Energy Holdings – slide 7
    LS36-1: Infrastructure hub is completed Platform facility 4 development wells Subsea pipeline: 126.9km to onshore terminal Sale gas pipeline: 32 km - to grid Primeline Corporate Presentation June 2015 7
  8. June 2015 Corporate Presentation – Primeline Energy Holdings – slide 8
    LS36-1: Budget, Expenditure and Project Finance Total investment budget circa US 727M including Development Capex circa US 608M, some yet to spend. Primelines share of Capex (PEH+PPC 49%: US 297M) was fully carried by CNOOC until Dec…
  9. June 2015 Corporate Presentation – Primeline Energy Holdings – slide 9
    Valuation has not yet reflected impressive operational progress Production started Jacket ODP installed approved Dev. Fabrication Drilling completed Dev. Agreement Primeline Corporate Presentation June 2015 9
  10. June 2015 Corporate Presentation – Primeline Energy Holdings – slide 10
    Strategy leverages infrastructure hub to monetize upside Development completed for LS36-1 gas field, secured market access and Newly acquired built regional 600 km2 of 3D seismic production infrastructure hub. Farm-out…
  11. June 2015 Corporate Presentation – Primeline Energy Holdings – slide 11
    High margin resource additions from both our blocks 2015+ plan to monetise 1.4 TCF of high margin hydrocarbon upside (14x the current field) in the field and in our 5,877 km2 exploration concession. Substantial possible reserves and…
  12. June 2015 Corporate Presentation – Primeline Energy Holdings – slide 12
    Prospective resources of 1.4TCF (McDaniel) Prospective Resources - Natural Gas Risked (2) Prospective Resources - Unrisked (1) Chance of Resources Success Prospect Low Medium Mean High Mean MMcf MMcf MMcf MMcf MMcf % LS36-1…
  13. June 2015 Corporate Presentation – Primeline Energy Holdings – slide 13
    Additional resources in lower zones Current Producers are in M1-1 an M1-2 sands. Additional gas in other sands and in lower tight reservoirs. Cross-section of LS36-1 M11 M12 M2 M31 M32 L1 L2 Primeline Corporate…
  14. June 2015 Corporate Presentation – Primeline Energy Holdings – slide 14
    Reserve additions via Phase 2 drilling from platform Existing wells shown in black LS36-1 M11 Sth well LS36-1 M10 well 30-8 Exploration Prospect Wells LS36-1 M2 & M3 wells LS36-1 M11 SW well 8 locations and well…
  15. June 2015 Corporate Presentation – Primeline Energy Holdings – slide 15
    M10 untested sand Designed as deviated well targeted to thick M10 section. Well penetrates entire M10 stratigraphic section. M10 GIIP calculates with Top M10 3D Horizon Shaded to show M10 Isochore Prospect Range of: P90: 6.8…
  16. June 2015 Corporate Presentation – Primeline Energy Holdings – slide 16
    LS36-1 field and nearby prospects New 600 sq. km 3D seismic in 2014 expanded the coverage in the gas play acquisition and processing completed and; interpretation in progress. Additional 3D seismic may be required for the…
  17. June 2015 Corporate Presentation – Primeline Energy Holdings – slide 17
    Lishui gas play tiebacks 2006 3D seismic area LS30-3-1 LS30-3 LS29-2 LS36-1 Platform LS35-1 LS35-3-1 Discovery LS35-3 Primeline Corporate Presentation June 2015 17
  18. June 2015 Corporate Presentation – Primeline Energy Holdings – slide 18
    Valuation reflects neither progress to date nor upside potential Phase 1 development generates annualised EBITDA of circa C80m. Selling into one of the most dynamic economies in China one of the highest gas price regions in the…
  19. June 2015 Corporate Presentation – Primeline Energy Holdings – slide 19
    Appendices Supplementary Technical and Operational Data Board of Directors Management and Technical Team Corporate Structure Primeline Corporate Presentation June 2015 19
  20. June 2015 Corporate Presentation – Primeline Energy Holdings – slide 20
    LS36-1: Development schedule Development Programme Activity 2008 2009 2010 2011 2012 2013 2014 9 11 1 2 3 4 5 6 7 8 9 11 1 2 3 4 5 6 7 8 9 11 1 2 3 4 5 6 7 8 9 11 1 2 3 4 5 6 7 8 9 11 1 2 3 4 5 6 7 8 9 11 1 2 3 4 5 6 7 8 9 Gas…
  21. June 2015 Corporate Presentation – Primeline Energy Holdings – slide 21
    LS36-1: Development milestones Commercial Agreements Gas Sale Agreement-in-principle signed, subsequent Framework and Amendment October 2008 Agreements signed in 2011 and 2012 End 2009 Overall Development Program completed March…
  22. June 2015 Corporate Presentation – Primeline Energy Holdings – slide 22
    Development in images Jacket Installation Development Drilling Topside lifted June 2013, July 2012 completed April 2013 installation completed June 2013 Primeline Corporate Presentation June 2015 22
  23. June 2015 Corporate Presentation – Primeline Energy Holdings – slide 23
    Onshore Processing Terminal in operation Burner Storage Central Control Office & Living Lab Operation & CO2 Fire-fighting Processing Loading Gas Zone Processing Slug Catcher Primeline Corporate…
  24. June 2015 Corporate Presentation – Primeline Energy Holdings – slide 24
    LS36-1: Wells LS36-1-2 LS36-1-1 A3 A5 A4PP Proposed Horizontal Well A2H A1M M1-0 Mapped Area Top M1-2 / M1-1 Merged & M1-0 (Patch) Contoured to GWC (5m CI) Primeline Corporate Presentation June 2015 24
  25. June 2015 Corporate Presentation – Primeline Energy Holdings – slide 25
    LS36-1: Production well design Horizontal and Multi-Lateral Gas Production wells increase potential gas rates, especially in tight gas reservoirs, and increase effective drainage area. A5 A3 drilled as a Vertical well to allow…
  26. June 2015 Corporate Presentation – Primeline Energy Holdings – slide 26
    Board of Directors Victor Hwang Chairman and President Mr. Hwang is Executive Director of the publicly listed Hong Kong Parkview Group Ltd., a division of the family controlled Chyau Fwu Corporation. Parkview's core business includes…
  27. June 2015 Corporate Presentation – Primeline Energy Holdings – slide 27
    Management & Technical Team Ming Wang Director and CEO Dr. Wang He joined Primeline in 1994 and was appointed as Vice President of Exploration in December 1996. Since then he has been responsible for all technical and commercial…
  28. June 2015 Corporate Presentation – Primeline Energy Holdings – slide 28
    Management & Technical Team Alan Soulsby Technical Director Mr. Soulsby joined as Technical Director in 1994 and was responsible for the initial block selection and the exploration programme which led to the LS36-1 discovery and ongoing…
  29. June 2015 Corporate Presentation – Primeline Energy Holdings – slide 29
    Corporate Structure Trading Symbols PEH - TSX Venture Exchange Outstanding Shares 134.0M Fully Diluted Shares 145.1M Fully Diluted Proceeds 7.2M (C) C0.67 average strike price Financing Dec 31 2014: LT debt C220.5m and C24.5m cash…