Sevan Marine ASA Presentation of fourth quarter results 2010 Shippingklubben, Oslo, February 15, 2011 1
IMPORTANT INFORMATION THIS PRESENTATION AND ITS ENCLOSURES AND APPENDICES (HEREINAFTER JOINTLY REFERRED TO AS THE PRESENTATION) HAVE BEEN PREPARED BY SEVAN MARINE ASA (SEVAN OR THE COMPANY) EXCLUSIVELY FOR INFORMATION PURPOSES. THIS…
Contents Highlights Fourth Quarter Floating Production (FPSO) Drilling Topside and Process Technology Market 3
Highlights Sevan Driller o Sevan Driller operations improving o 96% Technical Uptime last 30 days, Q1-11 till date 84% o Good motions; in accordance with expectations Strengthening of UDW drilling market o Concrete evaluation…
Q4 2010 Balance Sheet, Equity and Liabilities USDm 31.12.10 30.09.10 31.12.09 Share capital 16,6 16,6 16,6 Other equity 791,5 870,0 957,9 Total shareholders' e quity 808,1 886,6 974,5 Minority Interest 0,7 0,7 38,0 Total e quity…
Q4 2010 Financial Highlights 1/2 Operating revenue of USD 74.5m (USD 73.4m) o Improved Commercial Uptime on Sevan Driller o Compensation for loss in revenue under the original Shelley charter contract received from the Oilexco…
Q4 2010 Financial Highlights 2/2 Net financial loss of USD 58.8m (loss of USD 64.6m) o Net agio of USD 1.3m (disagio of USD 35.4m) mainly a result of unrealized agio on NOK- nominated bonds o Financial expense increased by USD 31.0m…
Financing USD 480m bank facility for Sevan Driller o Replacing existing USD 250m bank loan and NOK 1bn bond o Creating USD 50m+ in additional liquidity for corporate purposes o Expected drawdown during Q1-11 USD 1.6bn in new…
Contents Highlights Fourth Quarter Floating Production (FPSO) Drilling Topside and Process Technology Market 11
FPSO Sevan Piranema Q4-2010 performance: 93.3% Technical Uptime 6 days of downtime in relation to a planned shutdown for annual maintenance 86.7% Commercial Uptime Problems with the booster compressor expected resolved during first…
FPSO Sevan Hummingbird Q4-2010 performance: 99.9% Technical Uptime Commercial Uptime was 112.1% including bonus achieved for oil production Technical Uptime 99.2 % 98.2 % 98.6 % 99.7 % 99.9 % 96.0 % 96.8 % 96.0 % 97.0 % 97.0 %…
FPSO Sevan Voyageur FPSO upgrade work has commenced at the Nymo yard in Arendal, Norway o Modification of existing process facilities to handle more gas and install two gas compression trains for gas export and gas lift o The…
Sevan 1000 Goliat FPSO Project progress according to plan o License model contract Limited risk and no capex investment o Project Services Contract Sevan provides selected key project positions. Offices in London and Ulsan o…
FPSO Sevan no. 4 and 5 The hulls are located to Cosco Shipyard - construction to be completed upon contract Only limited of no further equity needed to complete units Several contract opportunities FPSO Sevan no. 4 FPSO Sevan…
Contents Highlights Fourth Quarter Floating Production (FPSO) Drilling Topside and Process Technology Market 17
Sevan Driller Q4-2010 performance: 53.0% Technical Uptime 53.1% Commercial Uptime Downtime during fourth quarter due to defects on the locking system on the BOP Good motions; in accordance with expectations Q1-2011 performance:…
Sevan Driller II o Module fabrication to elevate block construction from 24.5 to 36.5 meters completed and integrated with the main hull o Living quarter and drill floor fabrication ongoing. Scheduled for integration with main hull…
Contents Highlights Fourth Quarter Floating Production (FPSO) Drilling Topside and Process Technology Market 20
KANFA Activity Picking Up The independent FPSO process specialist Strong track record Primary focus on design & engineering of Process simulation, design topsides and engineering Independent of suppliers, customers and technology…
Contents Highlights Fourth Quarter Floating Production (FPSO) Drilling Topside and Process Technology Market 22
FPSO MARKET OVERVIEW - Significant Number of FPSO Awards Expected FPSO contracts* by award year FPSO newbuild forecast 30 35 Estimates Possible Cancelled/Delayed Planned Firm 30 25 Tendering 25 20 18 20 15 8 15 7 12…
FPSO MARKET OVERVIEW - Sevan Well Positioned in Strong Growth Regions FPSO demand by region FPSO demand by operator 35 Possible Sevan key Planned 30 30 7 markets Tendering Possible Planned 25 25 Tendering 5 20 20 15 15…
Summary o Sevan Driller operations improving o Concrete evaluation of IPO for ultra deepwater drilling business o Utilize growth opportunities in the FPSO market 26