3 Agenda n The quarter in brief n Financial results n Operations n Outlook n Summary n Attachments
4 The fourth quarter in brief n Rig utilisation rate of 61 per cent n Sale of PROD/BWO shares n Letter of Intent for a three-year period for operations in Brazil for Petrobras
5 Agenda n The quarter in brief n Financial results n Operations n Outlook n Summary n Attachments
12 New bond issue n NOK 500 million unsecured bond q Maturity 25 February 2016 q Credit margin 3.5% n Refinancing of PRS03 (USD 50 million bond with maturity March 2012) n Bought back USD 46.4 million in PRS03
13 Dividend n Long-term dividend policy targeting 40-50% of net profit paid tri-annually the following year n Total dividend paid in 2010 was 0.285 USD per share (50% payout) n Anticipate dividend announcements in connection…
14 Agenda n The quarter in brief n Financial results n Operations n Outlook n Summary n Attachments
15 Safe Caledonia refurbishment Hull maintenance and topside refurbishment Safe Caledonia will be refurbished with 450 beds, 1 & 2 bed cabins (417 beds in new blocks) 20 years life extension Shipyard stay planned for 1st…
16 Operations in Brazil n Three-year contract for Safe Concordia to perform safety and maintenance support services n New office in Rio de Janeiro (marketing) n New office in Macae (operations)
17 Operations in Brazil n The units to be attended by Safe Concordia are primarily turret moored FPSOs in the Campos basin n The first project is planned to be a turret moored FPSO and will be the first time a DP vessel has…
18 Recent contracts n LoI for Safe Scandinavia for UK North Sea in 2012 n Contract extension with BP at Valhall field for Regalia and Safe Scandinavia, firm contract until beginning of 2012
22 Agenda n The quarter in brief n Financial results n Operations n Outlook n Summary n Attachments
23 Market outlook supply Dynamically positioned semi rigs Anchored semi rigs Advanced units with high operational Primary strengths: versatility: Shallow to medium water depths All water depths, any seabed Fixed installations…
24 Market outlook demand UK and Norwegian North Sea Drivers: Maintenance, modifications, IOR projects and tie-ins of satellite fields to existing installations The demand outlook for accommodation rigs appears to be…
25 Market demand Mexico Drivers: q Construction support q Maintenance support q Hotel/catering/ logistical support Currently five of our rigs are operating in Mexico The demand for accommodation rigs in Mexico appears to be…
26 Market demand Brazil Fixed installation Semi-submersible FPSO
27 Market demand Emerging markets North Sea Mexico West Africa Southeast Asia Brazil and Australia Current location Previous operations Mature regions Emerging markets / potential growth regions
28
29
30
31 Summary n Good market outlook n Leading market position n High quality and versatile rig fleet n Robust financial position
32 Agenda n The quarter in brief n Financial results n Operations n Outlook n Summary n Attachments
33 Debt as of end Q4 2010 n Credit facility q Credit facility was initially drawn in May 2008 at USD 1.1 billion q Maturity of seven years q The applicable margin on the credit facility will vary in the range from 0.65% to 0.95%…
34 Debt as of end Q4 2010 n Total interest-bearing debt USD 705.4million: q Credit facility: USD 570 million (long-term) q Bond loan: USD 50 million (long-term) q Bond loan: NOK 500 million (USD 85.4 mill) (long-term)
35 Financial covenants as of end Q4 2010 n Financial covenants in the credit facility: q Minimum cash of USD 65 million in the group q Maximum leverage ratio of 4.5 q Minimum value adjusted equity ratio of 35 per cent q Market…
36 Rig name Location Client name Type of contract Firm contract Option Dayrate Current contract MSV Regalia Norwegian North Sea, Valhall BP Time charter Jul 11- Oct 11 USD 242 500 Norwegian North Sea, Valhall BP Time charter March…
37 Safe Caledonia UK North Sea BG Time charter March 11 - Nov 11 Jan 12 USD 200 000 UK North Sea, Dunbar Elgin Total Time charter Jun 10 - Sep 10 USD 220 000 Apr 09 - Jun 10 USD 150 000 May 07 - Apr 09 USD 140 000 Yard/mobilisation…
38 Fleet overview Name MSV Regalia Safe Scandinavia Safe Caledonia Geographical area Harsh environment, NCS Harsh environment, NCS Harsh environment Mooring system DP 12 point chain winches 10 point wire winches Station keeping…
39 Fleet overview Name Safe Astoria Safe Bristolia Safe Esbjerg Geographical area Moderately harsh env. Moderately harsh env. Harsh environment Mooring system 8 point wire winches 8 point wire winches 4 point wire winches Station…
40 Fleet overview Name Safe Britannia Safe Lancia Safe Hibernia Geographical area Harsh env. Moderately harsh env. Harsh environment Mooring system 9 point wire winches 8 point chain winches 12 point wire winches Station keeping…
41 Fleet overview Name Safe Regency Safe Concordia Jasminia Geographical area Harsh environment Benign environment Benign environment Mooring system 8 point wire winches 4 point wire winches 8 point wire winches Station keeping…
42 Financial calendar and IR contacts Financial calendar IR contact Cecilie Ouff n 25 May 2011 Publication of first Finance and IR Manager quarter 2011 results cecilie.ouff(a)prosafe.com Phone: +47 51 64 25 20 n 25 May 2011 Annual…