    AGM presentation 13 May 2009 1
  2. May 2009 Annual General Meeting – Falkland Oil and Gas Ltd.(FOGL) – slide 2
    Preparation for drilling 9 Select best prospects for drilling 9 Conduct site surveys 9 Submit environmental impact assessment (EIA) 9 Gain drilling consents 9 Plan logistics 9 Select and contract rig 2
  3. May 2009 Annual General Meeting – Falkland Oil and Gas Ltd.(FOGL) – slide 3
    Location map 3
  4. May 2009 Annual General Meeting – Falkland Oil and Gas Ltd.(FOGL) – slide 4
    Prospects 4
  5. May 2009 Annual General Meeting – Falkland Oil and Gas Ltd.(FOGL) – slide 5
    Robust prospect economics Excellent fiscal terms corporation tax 26%, Royalty 9% Positive economics with a post tax NPV10 of 8/bbl* A 500 Million barrel discovery could be worth: 14 per share A 3.5 Billion barrel discovery find…
  6. May 2009 Annual General Meeting – Falkland Oil and Gas Ltd.(FOGL) – slide 6
    Preparation for drilling Select best prospects for drilling Conduct site surveys Colin More Submit EIA Exploration Director Consent to drill Implement logistical plans Select and contract rig 6
  7. May 2009 Annual General Meeting – Falkland Oil and Gas Ltd.(FOGL) – slide 7
    Site surveys Why Safety Risk mitigation and cost control Government requirements Insurance 3 elements: Deployment of wave and current meters Digital site survey & benthic sampling Geotechnical boring 7
  8. May 2009 Annual General Meeting – Falkland Oil and Gas Ltd.(FOGL) – slide 8
    Current meters Long term deployment to assess seasonal variations Near surface measurements compliment dataset from 2006-7 seismic survey. Full numerical current models used in EIA Currents measured from sea bed to sea floor…
  9. May 2009 Annual General Meeting – Falkland Oil and Gas Ltd.(FOGL) – slide 9
    Digital site survey and benthic sampling A large area of multibeam data was acquired over each site to survey for: anchor locations, sea bed stability, wrecks and debris, habitat mapping High resolution digital seismic to image top…
  10. May 2009 Annual General Meeting – Falkland Oil and Gas Ltd.(FOGL) – slide 10
    Geotechnical boring Rig mounted on large dynamically positioned vessel Survey bored, sampled and analysed 200m of sediment below sea bed Provided essential information for design and installation of conductor and riser…
  11. May 2009 Annual General Meeting – Falkland Oil and Gas Ltd.(FOGL) – slide 11
    Consent to drill & the critical path to drilling The East Falklands Basin has not been drilled before and a comprehensive EIA will be required. Base line studies: mammal and bird observations, sea bed sampling, multibeam images,…
  12. May 2009 Annual General Meeting – Falkland Oil and Gas Ltd.(FOGL) – slide 12
    Preparation for drilling Select best prospects for drilling Conduct site surveys Submit EIA Consent to drill Plan logistics Select and contract rig 12
  13. May 2009 Annual General Meeting – Falkland Oil and Gas Ltd.(FOGL) – slide 13
    Logistics Order long lead drilling equipment Wellheads Casing Drill pipe Establish operations base in the Falklands Agree use of facilities Offices Port Airport Storage Access to resources 13
  14. May 2009 Annual General Meeting – Falkland Oil and Gas Ltd.(FOGL) – slide 14
    Preparation for drilling Select best prospects for drilling Conduct site surveys Submit EIA Gain drilling consents Logistics Select and contract rig 14
  15. May 2009 Annual General Meeting – Falkland Oil and Gas Ltd.(FOGL) – slide 15
    Select and contract a rig Minimum 2 well exploration programme committed to by BHP Billiton By end 2010 (in licence terms and in farmout agreement) Additional exploration &/or appraisal wells under consideration Timing dependent…
  16. May 2009 Annual General Meeting – Falkland Oil and Gas Ltd.(FOGL) – slide 16
    Select and contract a rig Rig market & drilling costs Deep water rig market improving in terms of rig availability Deepwater rig rates are starting to fall Drilling service & material costs falling 600 500 Average Day Rate…
  17. May 2009 Annual General Meeting – Falkland Oil and Gas Ltd.(FOGL) – slide 17
    Select and contract a rig BHPB are actively seeking a rig Type of rig Either 5th/6th generation semi-submersible or large drillship How many available Up to 35 suitable rigs worldwide, but all currently contracted Where from…
  18. May 2009 Annual General Meeting – Falkland Oil and Gas Ltd.(FOGL) – slide 18
    Funding FOGL is not fully funded through the drilling programme Cost of drilling programme still to be defined Variables include mob/de-mob costs & number of wells Funding options under consideration Another farm-out: Approached by…
  19. May 2009 Annual General Meeting – Falkland Oil and Gas Ltd.(FOGL) – slide 19
    Summary Multi-billion barrel targets to be tested in initial exploration programme De-risked prospects Drilling programme committed to by BHP Billiton Attractive fiscal terms Drilling preparations well advanced 19
  20. May 2009 Annual General Meeting – Falkland Oil and Gas Ltd.(FOGL) – slide 20
    Disclaimer Some statements contained in this presentation or in documents referred to in it are or may be forward-looking statements. Actual results may differ from those expressed in such statements, depending on a variety of…

From the store

Browse maps, data & reports in the Shale Experts store