Skip to main content ANNUAL RESULTS – Green Dragon Gas Ltd. Investor Presentation | Shale Experts
Loading...

ANNUAL RESULTS – Green Dragon Gas Ltd.

Green Dragon Gas Ltd. · Apr 21, 2015 · 21 slides

Investor presentation from the Shale Experts oil & gas presentation and slide database. Every page is imaged and its text indexed for search across operators, plays, basins and time.

Slides

  1. ANNUAL RESULTS – Green Dragon Gas Ltd. – slide 1
    Chinas Leading E&P Independent Annual Results 2014 - April 21st 2015 www.greendragongas.com LSE: GDG.LN 18 Years of CBM in China
  2. ANNUAL RESULTS – Green Dragon Gas Ltd. – slide 2
    2014 milestones: a transformational year Move to the Main Board of the London Stock Exchange Balance sheet strengthened to net shareholder equity of US739m Enhanced partnership with CNOOC (CUCBM) and CNPC (Petrochina) The…
  3. ANNUAL RESULTS – Green Dragon Gas Ltd. – slide 3
    2015 Outlook Funded growth strategy Cash at year end of US80m available to fund growth strategy Targeting an exit rate of 12BCF per year by 31 December 2015 GSS: 8Bcf per year GCZ: 4Bcf per year Drilling and development 30…
  4. ANNUAL RESULTS – Green Dragon Gas Ltd. – slide 4
    Financial Performance Revenue: 33.8m Increase of 13% over 2013 on a recurring basis Revenue and EBITDA(1) (USm) EBITDA: 4.7m 33.8 Increase of 156% 29.8 Balance Sheet Net cash of 80m Raised US138m through Issuance of 50m CB…
  5. ANNUAL RESULTS – Green Dragon Gas Ltd. – slide 5
    Operational Statistics Exploration and Production Direct equity interest in 1,938 wells Drilled 10 LiFaBriC wells at GSS A total of 89,010 feet drilled, of which 26,541 in coal 2014 exit rate of 8.9Bcfpy Sales Total gross…
  6. ANNUAL RESULTS – Green Dragon Gas Ltd. – slide 6
    Operational Performance CBM Production Total gas production in 2014: 8.2 Bcf Average daily gas production in 2014: 22mmcf/day 2014 year end exit rate of 8.9Bcfpy Reserves Total Original Gas In Place of 25.2Tcf Net 1P reserves…
  7. ANNUAL RESULTS – Green Dragon Gas Ltd. – slide 7
    Reserves Breakdown 1P Net: 147.8 Bcf PV10: US1,464m GCZ Net: 15.6Bcf GSS PV10: 186m Net: 147.8 Capex: PV10: USD167.8m US1,464m 2P Net: 426.8Bcf GSS GFC GCZ Net: 399.9 Net: 27 PV10: US4,296m Net: 28.5Bcf PV10: 313m PV10:…
  8. ANNUAL RESULTS – Green Dragon Gas Ltd. – slide 8
    Production Sharing Contracts GDG US1.1bn GFC GSS* GSN GQY GPX GGZ US54m US737m US91m US102m US18m US22m 49% 60% 50% 10% 60% 60% 60% 50% Block A Block B 51% 40% 50% 90% 40% 40% 40% 47% US79m GCZ CNOOC & CUCBM…
  9. ANNUAL RESULTS – Green Dragon Gas Ltd. – slide 9
    Block Highlights GSS: GDG operated 60% WI to be increased to 70% on option exercise 1,491wells; 68 exploration, 874 online, 544 gas producing US518m of capital deployed by CNOOC(cucbm) thus far Additional spending toward offtake…
  10. ANNUAL RESULTS – Green Dragon Gas Ltd. – slide 10
    GSS Reserves Migration Historical 2009 2010 2011 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7…
  11. ANNUAL RESULTS – Green Dragon Gas Ltd. – slide 11
    Upside: Coal Seam 15 (5 blocks) CS15 is located on average 80m below CS3 minimal incremental cost to enter coal seam CS3 and 15 Cross Section Higher gas content Higher OGIP in equivalent area compared to CS3 Knowledge and…
  12. ANNUAL RESULTS – Green Dragon Gas Ltd. – slide 12
    Subsurface Access to coal seams off limits to traditional vertical wells due to topography Coal seam 15 situated on average 80m below coal seam 3 -13-
  13. ANNUAL RESULTS – Green Dragon Gas Ltd. – slide 13
    GSS Infrastructure Overview of Wells and Infrastructure at GSS Block Total investment of US737 million 2014 gross production of 8.2Bcf GDG Pipeline of 52.6km CNOOC 167.5km of trunk and gathering pipeline completed Gross sales…
  14. ANNUAL RESULTS – Green Dragon Gas Ltd. – slide 14
    GSS Infrastructure contd Greka IPF 6.49Bcfpy Greka Base Camp Guixian Station 3.6Bcfpy Shizhuang 1 Station 11.24Bcfpy -15-
  15. ANNUAL RESULTS – Green Dragon Gas Ltd. – slide 15
    Reserve Progression - Value Decoupled from Brent 5000 120 2P NPV mn 1P NPV mn 4500 Brent (US) 4,296 CBM prices (US/Boe) 100 4000 3500 80 3000 2806 USmn US 2500 60 2000 1801 1818 1527 40 1500 1255 928 1000…
  16. ANNUAL RESULTS – Green Dragon Gas Ltd. – slide 16
    Downstream Assets -17-
  17. ANNUAL RESULTS – Green Dragon Gas Ltd. – slide 17
    Shareholder Liquidity and Dividends Committed to improving the liquidity for existing and new shareholders in a disciplined and structured manner 0.7 Public Float 50.0% Dividend 44.2% 45.0% 0.6 0.59 40.0% 35.3% 35.3% 35.3%…
  18. ANNUAL RESULTS – Green Dragon Gas Ltd. – slide 18
    Top 10 shareholders GDGH 87,169,631 55.85% Chandler Corporation 37,018,104 23.72% Aberdeen Asset Managers Ltd 9,105,980 5.83% GIC Private Limited 5,775,578 3.70% Fidelity Worldwide Investment 5,625,315 3.60% Platinum Asset…
  19. ANNUAL RESULTS – Green Dragon Gas Ltd. – slide 19
    Consolidated Statement of Financial Position For year ended December 31 USD '000 Assets Non-current assets Property, plant and equipment 157,627 28,232 Non-current liabilities Gas exploration and appraisal assets 1,157,915 902,537…
  20. ANNUAL RESULTS – Green Dragon Gas Ltd. – slide 20
    Consolidated Statement of Comprehensive Income For year ended December 31 USD '000 2014 2013 Continuing operations Revenue 33,787 62,181 Cost of sales -19,104 -40,322 Gross profit 14,683 21,859 Selling and distribution costs…
  21. ANNUAL RESULTS – Green Dragon Gas Ltd. – slide 21
    Consolidated Statement of Cashflow For year ended December 31 USD '000 2014 2013 2014 2013 Operating activities Loss after tax -35,813 -823 Net cash used in investing activities -93,559 -10,535 Adjustments for: Depreciation 4,867…

From the store

Browse maps, data & reports in the Shale Experts store