Skip to main content MAY 2012 ANNUAL GENERAL MEETING – Xcite Energy Ltd. Investor Presentation | Shale Experts
Loading...

MAY 2012 ANNUAL GENERAL MEETING – Xcite Energy Ltd.

Xcite Energy Ltd. · May 24, 2012 · 39 slides

Investor presentation from the Shale Experts oil & gas presentation and slide database. Every page is imaged and its text indexed for search across operators, plays, basins and time.

Slides

  1. MAY 2012 ANNUAL GENERAL MEETING – Xcite Energy Ltd. – slide 1
    Operations Update Bentley Field 2012 AGM Steve Kew 24 May 2012
  2. MAY 2012 ANNUAL GENERAL MEETING – Xcite Energy Ltd. – slide 2
    Xcite Energy Limited overview Published NPV (10) mm (2P/2C)- Core Area only 1,600 9/3b-6&6Z well 9/3b-7&7Z well 2C 2P 9/3b-5 well 1,400 1,200 NPV(10) Million US 1,000 800 NPV (10) Money Raised 600…
  3. MAY 2012 ANNUAL GENERAL MEETING – Xcite Energy Ltd. – slide 3
    Progress along Plan 2007 raised 50m to drill 9/3b-5 well 2007/8 drilled 9/3b-5 well and brought oil to surface 2009/10 raised 60m to drill the 9/3b-6 & 6Z wells 2010 drilled 9/3b-6 & 6Z, flowed 2900 bopd to confirm commerciality.…
  4. MAY 2012 ANNUAL GENERAL MEETING – Xcite Energy Ltd. – slide 4
    Xcite Energy position over time vs North Sea Portfolio of Independents (at current working interest in red) Xcite Energy Phase 1A Xcite Energy Phase 1B Xcite Energy Phase 2 Xcite Energy - RAR Feb 2012 Individual average of first…
  5. MAY 2012 ANNUAL GENERAL MEETING – Xcite Energy Ltd. – slide 5
    XEL AGM Presentation Outline May 2012 1. Heavy Oil in The North Sea Challenges and Opportunities 2. Xcites Bentley Field a) Description b) Development drivers c) Phase 1A work programme d) Phase 1B work programme 6
  6. MAY 2012 ANNUAL GENERAL MEETING – Xcite Energy Ltd. – slide 6
    Heavy Oil Not so Challenging XEL AGM May 2012 Heavy Oil Not so Challenging Field Life Discovery Development Extension Opportunities: Challenges: Value Add: Large Proven High viscosity Large remaining Resources Mobility ratios…
  7. MAY 2012 ANNUAL GENERAL MEETING – Xcite Energy Ltd. – slide 7
    Xcite Energy Heavy Oil Focus XEL AGM May 2012 1. Relatively easy access to significant resources a) Technical expertise an enabler 2. Play the long-game to meet development challenges and extend into EOR 3. Strategy to become…
  8. MAY 2012 ANNUAL GENERAL MEETING – Xcite Energy Ltd. – slide 8
    XEL AGM Prospects for Heavy Oil in the North Sea May 2012 Key Drivers to initiate Heavy Oil Development Technology for completions Sustained oil prices 70/bbl Critical mass and volume Adequate recoverable volumes in aggregate…
  9. MAY 2012 ANNUAL GENERAL MEETING – Xcite Energy Ltd. – slide 9
    XEL AGM North Sea Heavy Oil Setting May 2012 Heavy oil in the North Sea is attracting increased interest: 9 billion barrels of estimated heavy oil resources-in- place(1) Higher oil prices plus new technologies UK government…
  10. MAY 2012 ANNUAL GENERAL MEETING – Xcite Energy Ltd. – slide 10
    XEL AGM Bentley Area Fields May 2012 1 24 E 1 36 E Source: IHS BRESSAY Disc. - 1976 with well 3/28-1 Operator - Statoil BENTLEY Disc. - 1977 with well 9/3-1 Operator - XER 60 N 009/03e Bentley Area 6Z 4Z 4 100 km…
  11. MAY 2012 ANNUAL GENERAL MEETING – Xcite Energy Ltd. – slide 11
    XEL AGM Xcite, Bentley Field, Timeframe May 2012 2003 Xcite formed; 21st Round Promote License awarded to Xcite (100%) for 9/3b 2005 Block converted to Traditional License 2008 Xcite flow oil from 9/3b-5 appraisal well 2010 -…
  12. MAY 2012 ANNUAL GENERAL MEETING – Xcite Energy Ltd. – slide 12
    XEL AGM Bentley Field & Prospect Outlines with Schematic Depositional Model May 2012 3/27-1 3/28a Bressay Bressay Bentley 9/3b 9/3e Field Field XER 3/27-1 9/3-1 9/2a 9/3a 9/2-1 3/28a-4 9/3-2A, 4 9/3b-5,6,6Z 9/3-3 9/2b 9/3c…
  13. MAY 2012 ANNUAL GENERAL MEETING – Xcite Energy Ltd. – slide 13
    XEL AGM Top Dornoch Reservoir Structure with Example 3D Seismic May 2012 West 9/3b-5 Contours at 20 ft East from 3730 TVDSS 1 km Top Dornoch Base Dornoch 9/3-1 9/3-3 9/3b- 6,6Z 9/3b-5 This data is proprietary to…
  14. MAY 2012 ANNUAL GENERAL MEETING – Xcite Energy Ltd. – slide 14
    XEL AGM Bentley Field & Reservoir Characteristics May 2012 Four-way dip closed (15 km x 6 km) High net to gross 88% High porosity 32% Oil saturation 91% High Permeability Avg 10 D Oil-leg up to 115 Underlying water-leg up to…
  15. MAY 2012 ANNUAL GENERAL MEETING – Xcite Energy Ltd. – slide 15
    XEL AGM 2010, 9/3b-6 & 9/3b-6Z - Overcoming Preconceptions May 2012 Industry perception of heavy-oil: Heavy-oil challenging and unpredictable Difficult to achieve commercial flowrates Difficult to drill, complete & flow…
  16. MAY 2012 ANNUAL GENERAL MEETING – Xcite Energy Ltd. – slide 16
    XEL AGM 9/3b-6Z Horizontal Wellbore Geosteering using AziTrak May 2012 Zone 1 Top reservoir Zone 2 Top reservoir 18 ft high to High to Zone 3 on prognosis prognosis prognosis() GEOLOGICAL INTERPRETATION No indication of…
  17. MAY 2012 ANNUAL GENERAL MEETING – Xcite Energy Ltd. – slide 17
    XEL AGM Horizontal Wellbore Reservoir Section May 2012 Gross reservoir 1823 ft, Average Sw 3% Net reservoir 1807 ft Net pay 1807 ft N:G 100% Avg Porosity 32% RNS D2B Gamma Gas VShale Porosity Sw Sonic…
  18. MAY 2012 ANNUAL GENERAL MEETING – Xcite Energy Ltd. – slide 18
    Overcoming the Challenges Bentley Heavy Oil XEL AGM May 2012 Challenges: Solutions / Mitigation: High viscosity Appropriate completion / Blending Mobility ratios Aquifer support beneficial / water production manageable Friable…
  19. MAY 2012 ANNUAL GENERAL MEETING – Xcite Energy Ltd. – slide 19
    XEL AGM Field Development Drivers May 2012 Phased development enables early production history hence design optimisation Closely spaced multi-lateral wellbores enables good recovery per well and good sweep of field Flow…
  20. MAY 2012 ANNUAL GENERAL MEETING – Xcite Energy Ltd. – slide 20
    XEL AGM May 2012 Phase 1 A 9/3b-7 and 7z wells Calibrate the reservoir models Get a better understanding of water flow in the reservoir and how it interacts with the oilby producing a significant volume of oil and water Get…
  21. MAY 2012 ANNUAL GENERAL MEETING – Xcite Energy Ltd. – slide 21
    XEL AGM May 2012 24
  22. MAY 2012 ANNUAL GENERAL MEETING – Xcite Energy Ltd. – slide 22
    XEL AGM May 2012 25
  23. MAY 2012 ANNUAL GENERAL MEETING – Xcite Energy Ltd. – slide 23
    XEL AGM May 2012 26
  24. MAY 2012 ANNUAL GENERAL MEETING – Xcite Energy Ltd. – slide 24
    XEL AGM May 2012 27
  25. MAY 2012 ANNUAL GENERAL MEETING – Xcite Energy Ltd. – slide 25
    XEL AGM May 2012 28
  26. MAY 2012 ANNUAL GENERAL MEETING – Xcite Energy Ltd. – slide 26
    XEL AGM May 2012 29
  27. MAY 2012 ANNUAL GENERAL MEETING – Xcite Energy Ltd. – slide 27
    XEL AGM May 2012 30
  28. MAY 2012 ANNUAL GENERAL MEETING – Xcite Energy Ltd. – slide 28
    XEL AGM May 2012 31
  29. MAY 2012 ANNUAL GENERAL MEETING – Xcite Energy Ltd. – slide 29
    XEL AGM May 2012 32
  30. MAY 2012 ANNUAL GENERAL MEETING – Xcite Energy Ltd. – slide 30
    XEL AGM May 2012 Phase 1 B The first phase of development Facilities A wellhead tower to support dry trees A leased in jack up drilling rig to drill, complete and conduct workover interventions An FPSO to process produce fluids…
  31. MAY 2012 ANNUAL GENERAL MEETING – Xcite Energy Ltd. – slide 31
  32. MAY 2012 ANNUAL GENERAL MEETING – Xcite Energy Ltd. – slide 32
    XEL AGM May 2012 35 35
  33. MAY 2012 ANNUAL GENERAL MEETING – Xcite Energy Ltd. – slide 33
    XEL AGM May 2012 36 36
  34. MAY 2012 ANNUAL GENERAL MEETING – Xcite Energy Ltd. – slide 34
    XEL AGM May 2012 37 37
  35. MAY 2012 ANNUAL GENERAL MEETING – Xcite Energy Ltd. – slide 35
    XEL AGM May 2012 38 38
  36. MAY 2012 ANNUAL GENERAL MEETING – Xcite Energy Ltd. – slide 36
    XEL AGM May 2012 39 39
  37. MAY 2012 ANNUAL GENERAL MEETING – Xcite Energy Ltd. – slide 37
    XEL AGM May 2012 Bentley Field - Reserves Assessment Report TRACS independent Reserves Assessment Report (RAR) update February 2012 SPD Core Area defined in the RAR comprises: Bentley Bentley o First Phase Development…
  38. MAY 2012 ANNUAL GENERAL MEETING – Xcite Energy Ltd. – slide 38
    XEL AGM May 2012 Oil in place and potentially recoverable volumes Discovered PIIP for Core Area (FPD + SPD) P90 P50 P10 MMstb 415 488 567 Reserves for Core Area 1P 2P 3P MMstb 96 116 140 Prospective Resources (unrisked)…
  39. MAY 2012 ANNUAL GENERAL MEETING – Xcite Energy Ltd. – slide 39
    XEL AGM Conclusions May 2012 Much of geological/exploration risk removed for Xcite oOpportunities exist in previously discovered resources Challenge is principally engineering rather than geological oMaximise reservoir footage…