Skip to main content AFRICA INDEPENDENTS FORUM – Bowleven Plc Investor Presentation | Shale Experts
Loading...

AFRICA INDEPENDENTS FORUM – Bowleven Plc

Bowleven Plc · Jun 3, 2014 · 23 slides

Investor presentation from the Shale Experts oil & gas presentation and slide database. Every page is imaged and its text indexed for search across operators, plays, basins and time.

Slides

  1. AFRICA INDEPENDENTS FORUM – Bowleven Plc – slide 1
    Preliminary 11 Results Presentation th Africa Independents Forum 2014 For the year ended 30 June 2013 Kevin Hart, Chief Executive Officer
  2. AFRICA INDEPENDENTS FORUM – Bowleven Plc – slide 2
    Disclaimer Important Notice Nothing in this presentation or in any accompanying management discussion of this presentation (the Presentation) constitutes, nor is it intended to constitute: (i) an invitation or inducement to engage in…
  3. AFRICA INDEPENDENTS FORUM – Bowleven Plc – slide 3
    Vision & Strategy Vision It is our vision to build an African focused exploration and production company which in time becomes renowned for its ability to consistently create and realise material shareholder value through…
  4. AFRICA INDEPENDENTS FORUM – Bowleven Plc – slide 4
    Asset Overview Cameroon Kenya Zambia Nigeria South Sudan Ethiopia Cameroon Kenya 2 permits covering 4,644km. Block 11B onshore Kenya covering Blocks 25, 28 & 29 covering P50 contingent resource base 263 14,200km.…
  5. AFRICA INDEPENDENTS FORUM – Bowleven Plc – slide 5
    oil & gas Cameroon
  6. AFRICA INDEPENDENTS FORUM – Bowleven Plc – slide 6
    Drilling History Cameroon 2007 2008 2010 2011 2012/13 One of Cameroons largest investors in Feb: Sapele-1 33-43m Net Pay exploration activities and one of its most IM-5 95m Net Pay successful explorers. Mar: IE-2z Jun:…
  7. AFRICA INDEPENDENTS FORUM – Bowleven Plc – slide 7
    Etinde Development Stage I - Fertiliser Etinde Exploitation Authorisation Application (EEAA) submitted to Cameroon authorities award anticipated shortly. Gas sales agreement (GSA) with fertiliser plant well advanced (20 year…
  8. AFRICA INDEPENDENTS FORUM – Bowleven Plc – slide 8
    Etinde Resource Base Significant Hydrocarbon Volumes Oil, condensate and wet gas. P50 contingent resources increased 30%* in 2013. EEAA submitted to Cameroon authorities; award anticipated shortly. Phased development approach.…
  9. AFRICA INDEPENDENTS FORUM – Bowleven Plc – slide 9
    Field Development Plan Flexibility for future expansion Liquids focused - gas enabled Hub and Spoke wells facilities system. Unmanned offshore platforms, processing onshore. Oil, condensate and wet gas to onshore hub. Liquids…
  10. AFRICA INDEPENDENTS FORUM – Bowleven Plc – slide 10
    Full Field Development Beyond Fertiliser Intra Isongo Reservoir Model EEAA includes full field development concepts - LNG. Intra Isongo reservoir interval encountered at IM-5 highlighted significant upside potential. Drilling…
  11. AFRICA INDEPENDENTS FORUM – Bowleven Plc – slide 11
    Full Field Development Cameroon LNG (CLNG) Project Countrywide gas aggregation scheme, led by GDF Suez and SNH. Planned onshore facility at Kribi, with gas pipeline through Rio del Rey and Douala basins. First LNG train planned…
  12. AFRICA INDEPENDENTS FORUM – Bowleven Plc – slide 12
    Intra Isongo Potential Material Upside IM-5 IM-5 well has considerably de-risked the Isongo play. Indicative appraisal Seismic response correlates with thick, reservoir quality 150m down-dip sands. A number of amplitude based…
  13. AFRICA INDEPENDENTS FORUM – Bowleven Plc – slide 13
    Intra Isongo Potential Intra Isongo Amplitude response indicates sandstone distribution. Depositional systems revealed, wide extent. Relationship with IE / ID field discoveries being examined. Hydrocarbon fluid samples at…
  14. AFRICA INDEPENDENTS FORUM – Bowleven Plc – slide 14
    Bomono Overview Historical 6 deep wells and c.10 shallow wells drilled in the 1950s. Wells and onshore oil seeps prove active, Upper Cretaceous sourced hydrocarbon system. Vintage 2D Total 500km 2D seismic acquired and legacy 2D…
  15. AFRICA INDEPENDENTS FORUM – Bowleven Plc – slide 15
    Bomono Exploration Zingana-1 Moambe-1 Zingana Moambe Prospect Associated Condensate Prospect Associated Condensate Oil mmbbls Gas bcf Oil mmbbls Gas bcf Unrisked Mean Gas bcf mmbbls Unrisked Mean Gas bcf mmbbls HIIP* HIIP*…
  16. AFRICA INDEPENDENTS FORUM – Bowleven Plc – slide 16
    Bomono Operational Status Civil Engineering Zingana pad complete. Access routes complete. Moambe pad construction preparation commencing. Drilling camp construction underway. Rig Update Rig negotiations advanced; two well…
  17. AFRICA INDEPENDENTS FORUM – Bowleven Plc – slide 17
    oil & gas Elsewhere in Africa
  18. AFRICA INDEPENDENTS FORUM – Bowleven Plc – slide 18
    Kenya Overview New hydrocarbon province. Multiple oil discoveries to the south (Lokichar Basin). High level of industry activity multi-well drilling campaigns Ethiopia ongoing and infrastructure planning underway (including…
  19. AFRICA INDEPENDENTS FORUM – Bowleven Plc – slide 19
    Kenya Overview South Sudan 500 km 2D seismic New hydrocarbon province. Adamantine Energy/ Ethiopia Bowleven Multiple oil discoveries to the south (Lokichar Basin). (2014) Well planned High level of industry activity multi-well…
  20. AFRICA INDEPENDENTS FORUM – Bowleven Plc – slide 20
    Kenya Block 11B FTG Results FTG reveals five basins. NE gravity low possible sub-basin to the South Omo Basin. 2014 field work and interpreted FTG results has greatly increased the geological understanding of the area.…
  21. AFRICA INDEPENDENTS FORUM – Bowleven Plc – slide 21
    Zambia Overview Karoo basins extensive, large and underexplored. Perceived as gas prone but have generated a lot of oil (20 billion bbl). Opportunity to acquire significant position while industry focus on Tertiary rift…
  22. AFRICA INDEPENDENTS FORUM – Bowleven Plc – slide 22
    Zambia Overview Luangwa Valley Karoo basin total area 42,000 km. Five blocks applied for: Three blocks awarded (25, 28 and 29) 16,250km and applications for two blocks pending (26 and 27). Previous exploration 1980s (Placid)…
  23. AFRICA INDEPENDENTS FORUM – Bowleven Plc – slide 23
    Principal Contact: Kerry Crawford Tel: +44 131 524 5678 Kevin Hart Tel: +44 131 524 5678 infobowleven.com www.bowleven.com Bowleven Plc. The Cube 45 Leith Street Edinburgh EH1 3AT United Kingdom

From the store

Browse maps, data & reports in the Shale Experts store