Skip to main content MARCH 2011 INVESTOR PRESENTATION – Karoon Gas Australia Ltd | Shale Experts
Loading...

MARCH 2011 INVESTOR PRESENTATION – Karoon Gas Australia Ltd

Karoon Gas Australia Ltd · Mar 10, 2011 · 30 slides

Investor presentation from the Shale Experts oil & gas presentation and slide database. Every page is imaged and its text indexed for search across operators, plays, basins and time.

Slides

  1. MARCH 2011 INVESTOR PRESENTATION – Karoon Gas Australia Ltd – slide 1
    Karoon review March 2011
  2. MARCH 2011 INVESTOR PRESENTATION – Karoon Gas Australia Ltd – slide 2
    2 KAROON REVIEW march 2011 Karoon Gas snapshot n Approximately 220,750,769 shares and 8.4 million options n Poseidon field, Kronos-1 well flows at 26 million scf per day n Market capitalisation approximately A1.57 bill 7.10…
  3. MARCH 2011 INVESTOR PRESENTATION – Karoon Gas Australia Ltd – slide 3
    3 KAROON REVIEW march 2011 Karoon Gas Australias key personnel Board Technical Robert HoskingExecutive Chairman Lino BarroEngineering Manager Founding Director and shareholder of Karoon Gas with 35 years of 28 years experience in…
  4. MARCH 2011 INVESTOR PRESENTATION – Karoon Gas Australia Ltd – slide 4
    4 KAROON REVIEW march 2011 South American personnel EDWARD MUNKS Director of KEI and COO of KGA TIMOTHY HOSKINGGeneral Manager for South America Over 29 years experience working for Brambles, Nexus Energy, Anzoil, Over 10 years…
  5. MARCH 2011 INVESTOR PRESENTATION – Karoon Gas Australia Ltd – slide 5
    5 KAROON REVIEW march 2011 Australian Assets TIMOR Karoon Permit AC/P8 BAYU-UNDAN DARWIN Karoon Permit WA-314-P AUSTRALIA Karoon Permit WA-315-P ConocoPhillips LNG Plant Kronos-1 Poseidon-1 gas discovery appraisal…
  6. MARCH 2011 INVESTOR PRESENTATION – Karoon Gas Australia Ltd – slide 6
    6 KAROON REVIEW march 2011 Browse Basin Argus Gas/condensate field up to 4 tcf reserves WA-314-P Argus-2 drilling in Agreement to proceed to, June-July 2011 Karoon 90% ConocoPhillips 10% (Woodside public domain data) Abalone 1…
  7. MARCH 2011 INVESTOR PRESENTATION – Karoon Gas Australia Ltd – slide 7
    7 KAROON REVIEW march 2011 Browse Basin Poseidon Field Poseidon-1 Kronos-1 Future Plans n Well data from the three wells drilled on the greater Poseidon structure are being analysed, together with the new Poseidon 3D seismic…
  8. MARCH 2011 INVESTOR PRESENTATION – Karoon Gas Australia Ltd – slide 8
    8 KAROON REVIEW march 2011 Browse Basin Indicative Time line Karoon activity 2009 2010 2011 2012 2013 Indicative time line (Mar 2011) Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Past Future BROWSE BASIN (Aust)…
  9. MARCH 2011 INVESTOR PRESENTATION – Karoon Gas Australia Ltd – slide 9
    9 KAROON REVIEW march 2011 Indicative project concept Karoon lng/condensate indicative development model economics (assuming a discovery of 7 tcf and based on independent third party design concepts). Field development, pipeline…
  10. MARCH 2011 INVESTOR PRESENTATION – Karoon Gas Australia Ltd – slide 10
    10 KAROON REVIEW march 2011 Combined net cash flow Karoon lng/condensate indicative development model economics. Net cash flow for combined offshore liquids removal and onshore LNG 100% Share. 4000 PRRT begins 3000 2000…
  11. MARCH 2011 INVESTOR PRESENTATION – Karoon Gas Australia Ltd – slide 11
    11 KAROON REVIEW march 2011 Karoon indicative development model economics Product revenues Capex profile Product revenues for combined offshore 2009 US dollars liquids removal and onshore LNG 100% Share. 4500 Product Revenues…
  12. MARCH 2011 INVESTOR PRESENTATION – Karoon Gas Australia Ltd – slide 12
    12 KAROON REVIEW march 2011 AC/P8 Location: Close to the Laminaria/Corallina production facility with production tie in potential. JPDA 06-105 Potential: Main prospect Jania with up to 20mmbl potential prospective resource.…
  13. MARCH 2011 INVESTOR PRESENTATION – Karoon Gas Australia Ltd – slide 13
    13 KAROON REVIEW march 2011 Brazil Santos Basin 55% drilling success rate in the southern Santos Basin (23/41 wells) OGX Natal discovery (June 2010) oil in Santonian sandstone reservoirs with Location: Santos Basin shallow water…
  14. MARCH 2011 INVESTOR PRESENTATION – Karoon Gas Australia Ltd – slide 14
    14 KAROON REVIEW march 2011 Brazil Santos Basin Maruj-Field location Sao P km Piracuc Piracuc Field 230 Light oil and gas disoveries within aulo Karoon Operated Blocks Tertiary aged reservoirs whih have S-M-1037…
  15. MARCH 2011 INVESTOR PRESENTATION – Karoon Gas Australia Ltd – slide 15
    15 KAROON REVIEW march 2011 Brazil Santos Basin Maruj oil field discovery TIRO Field Maruj Field OLIGOCENE RESERVIOR INTERVAL Discovery of light oil to the south of Santos Basin (Petrobras announcement) Rio de Janeiro,…
  16. MARCH 2011 INVESTOR PRESENTATION – Karoon Gas Australia Ltd – slide 16
    16 KAROON REVIEW march 2011 Brazil Santos Basin SAO PAULO B Piracuc Field Niteri Atlanta Light oil and gas discovered in Cretaceous Tamba PJS-559 Natal Belmonte BS-4 Santonian/Campanian aged reservoirs with Urugu…
  17. MARCH 2011 INVESTOR PRESENTATION – Karoon Gas Australia Ltd – slide 17
    17 KAROON REVIEW march 2011 Brazil Santos Basin Karoon acreage play types Depth Seabed Recent- Miocene Shallow detached Salt Eocene- Paleocene Sub-Salt Plays Post-Salt Maa Plays Cam strichtian pania - n Post- Salt…
  18. MARCH 2011 INVESTOR PRESENTATION – Karoon Gas Australia Ltd – slide 18
    18 KAROON REVIEW march 2011 Brazil Santos Basin Seismic modelling Pico do Morro da Piracuc Jaragua East Igreja East Field 21km 13km Low Probability of hydrocarbons Seismic Inversion High probabilities High of…
  19. MARCH 2011 INVESTOR PRESENTATION – Karoon Gas Australia Ltd – slide 19
    19 KAROON REVIEW march 2011 Brazil Santos Basin Prospect analog Tiro Oil Field Pico do Jaragua East Stratigraphic thinning Stratigraphic thinning S & pinch-out of S & pinch-out of A reservoir onto flank of A reservoir onto…
  20. MARCH 2011 INVESTOR PRESENTATION – Karoon Gas Australia Ltd – slide 20
    20 KAROON REVIEW march 2011 Brazil Santos Basin Prospect example Pico do Jaragua East Santonian Santonian Anomaly cycle 1 Santonian Anomaly cycle 1 Prospect example- amplitude Amplitude Map (Far stack response) Hydrocarbon…
  21. MARCH 2011 INVESTOR PRESENTATION – Karoon Gas Australia Ltd – slide 21
    21 KAROON REVIEW march 2011 Brazil Santos Basin Indicative Timeline Karoon activity 2009 2010 2011 2012 2013 Indicative time line (Mar 2011) Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Past Future SANTOS BASIN…
  22. MARCH 2011 INVESTOR PRESENTATION – Karoon Gas Australia Ltd – slide 22
    22 KAROON REVIEW march 2011 Indicative Santos Basin project concept Karoon oil and gas indicative development model economics (assuming a discovery of 250 million barrels and based on independent third party design concepts).…
  23. MARCH 2011 INVESTOR PRESENTATION – Karoon Gas Australia Ltd – slide 23
    23 KAROON REVIEW march 2011 Net cash flow Karoon oil and gas production indicative development model economics. 100% share. 2000 1500 1000 Net cash flow (USmillion) Field exploration 500 and appraisal 0 500…
  24. MARCH 2011 INVESTOR PRESENTATION – Karoon Gas Australia Ltd – slide 24
    24 KAROON REVIEW march 2011 Karoon indicative development model economics Product revenues Capex profile Oil and Gas Revenues- 100% share 2010 US dollars Oil and Gas Revenues (USmillion) 3500 1600 3000 1400 CAPEX…
  25. MARCH 2011 INVESTOR PRESENTATION – Karoon Gas Australia Ltd – slide 25
    25 KAROON REVIEW march 2011 Peru Tumbes Basin Block Z38 Very open, stable and favourable fiscal/royalty regime (40-50% government take) Colombia Location: Offshore Peru close to Ecuador producing fields and discoveries.…
  26. MARCH 2011 INVESTOR PRESENTATION – Karoon Gas Australia Ltd – slide 26
    26 KAROON REVIEW march 2011 Peru Tumbes Basin Prospects and Leads Block Z38 D Prospect Total recoverable resource 116 mmbl with a geologic risk (Pg) = 14% (D&M, Oct 2010 2D seismic based) Baleen Lead Total recoverable…
  27. MARCH 2011 INVESTOR PRESENTATION – Karoon Gas Australia Ltd – slide 27
    27 KAROON REVIEW march 2011 Peru Tumbes Basin Prospects and Leads 3D perspective of top reservoir. Red and yellow show seismic amplitude anomaly across the top of Baleen Lead the lead. Good concordance of amplitude to structure.…
  28. MARCH 2011 INVESTOR PRESENTATION – Karoon Gas Australia Ltd – slide 28
    28 KAROON REVIEW Buena Vista march 2011 Carmen Nor Este Bartra Peru Maranon Basin Block 144 Jibarito Situche SitucheCentral Central Nueva Esperanza Pavayacu Capriona Sungachi-9-2x San Juan Block 8 Corrientes 144…
  29. MARCH 2011 INVESTOR PRESENTATION – Karoon Gas Australia Ltd – slide 29
    29 KAROON REVIEW march 2011 Activity Summary KAROON ACTIVITY 2009 2010 2011 2012 2013 Indicative time line (Mar 2011) Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 BROWSE BASIN (Aust) Past Future Drilling (firm)…
  30. MARCH 2011 INVESTOR PRESENTATION – Karoon Gas Australia Ltd – slide 30
    30 KAROON REVIEW march 2011 Summary nK aroon is well positioned having now started a two year exploration and appraisal drilling campaign across its diverse portfolio. nM any prospects are large and independent , with success…

From the store

Browse maps, data & reports in the Shale Experts store