MARCH 2010 INVESTOR PRESENTATION – Technip

Technip · Mar 30, 2010 · 23 slides

Investor presentation from the Shale Experts oil & gas presentation and slide database. Every page is imaged and its text indexed for search across operators, plays, basins and time.

Slides

  1. MARCH 2010 INVESTOR PRESENTATION – Technip – slide 1
    Subsea Technology & Assets Alain Marion Senior Vice President, Subsea Assets & Technologies March 30, 2010
  2. MARCH 2010 INVESTOR PRESENTATION – Technip – slide 2
    Technip is a leader in Subsea Proven experience Diversified Product Offer Rigid, Flexible and Hybrid pipe solutions 44% Flexible 56% Rigid All major challenges: Ultra deep / Harsh environment 2006 - 2009 kilometers…
  3. MARCH 2010 INVESTOR PRESENTATION – Technip – slide 3
    Technological challenges by Region Arctic Materials North Sea Large Diameter Risers Winterization Corrosive Fluids Ageing Infrastructure Flow Assurance Gulf of Mexico Ultra Deepwater India / Middle East High Pressure Ultra…
  4. MARCH 2010 INVESTOR PRESENTATION – Technip – slide 4
    Flexible: Complex applications worldwide IPB concept: flow assurance challenge 2005: Thunder Horse, Gulf of Mexico Water injection flexible riser Demanding combined conditions: 7.5 internal diameter - 10,000 psi - 1,890m water…
  5. MARCH 2010 INVESTOR PRESENTATION – Technip – slide 5
    Rigid: Deepest Steel Pipes Deepwater Reeled Rigid pipes 25 Steel Catenary Risers (SCRs) installed, essentially in Gulf of Mexico Shell Perdido Project Deepest reeled flowline installation / 2,961 m water depth Deepest reeled Steel…
  6. MARCH 2010 INVESTOR PRESENTATION – Technip – slide 6
    Hybrid Risers: Proven solutions Free Standing Hybrid Riser benefits Independent of FPSO installation and Subsea project execution Reduced weight loads on FPSO Reduced wave motion fatigue PDET: 2007 CASCADE & CHINOOK: 2009 First of…
  7. MARCH 2010 INVESTOR PRESENTATION – Technip – slide 7
    Technips Strong Commitment to R&D Subsea R&D expenditures grew 50% 206 R&D Engineers Worldwide 31m 32m 32m 9% 26m Hybrid technologies 21m 4% Offshore installation 7% 69% Umbilicals Flexible pipe 11% Rigid pipe 2005 2006…
  8. MARCH 2010 INVESTOR PRESENTATION – Technip – slide 8
    Technips 3,000 meter water depth program Objective: design, manufacture & qualify flexible pipes for 3,000 m water depth Subsea jumpers & flowlines Pressure chamber tests Sweet & Sour service Deep Immersion Performance tests From 7…
  9. MARCH 2010 INVESTOR PRESENTATION – Technip – slide 9
    Riser Integrity Management program Torsion & elongation measurements Actively pursuing three levels of involvement Monitoring: ensure riser system is managed effectively and remains reliable Inspection: optimize field operations…
  10. MARCH 2010 INVESTOR PRESENTATION – Technip – slide 10
    Technips Flexible: Materials qualified for TUPI in Brazil TUPI CHALLENGES TECHNIPS ANSWER High level of corrosive gas (CO2 & H2S) Intensive testing program to qualify flexible pipe materials under H2S and Supercritical Requirement…
  11. MARCH 2010 INVESTOR PRESENTATION – Technip – slide 11
    Flow assurance: New technology Electrical Trace Heating technology (ETH) Field Development Challenges Technips Answers Increased tie-back length New technology qualified by major clients Insufficient or uneven fluid temperatures…
  12. MARCH 2010 INVESTOR PRESENTATION – Technip – slide 12
    New Riser solution to Extend Flexible pipe capability Free Standing Flexible Riser (FSFR) with Flat Buoy Stand-alone flexible riser can be installed without FPSO platform Weight supported by production platform reduced 100 300 m…
  13. MARCH 2010 INVESTOR PRESENTATION – Technip – slide 13
    Technips Installation capabilities Flexible Sunrise 2000 Rigid Deep Blue 13
  14. MARCH 2010 INVESTOR PRESENTATION – Technip – slide 14
    State-of-the-art fleet Pipelay vessels 3 units Deep Blue Apache II Deep Energy Heavy Construction Vessels (HCV) 4 units Deep Pioneer Deep Constructor Sunrise 2000 Skandi Vitoria 2 major vessel Diving Support upgrades…
  15. MARCH 2010 INVESTOR PRESENTATION – Technip – slide 15
    Largest and most sophisticated Diving Support Vessel in the world Skandi Arctic (DSV) Start of operations: 2009 Length: 157 meters Speed: 16 knots Accommodation: 140 people Class 3 dynamic positioning system 3 Remote…
  16. MARCH 2010 INVESTOR PRESENTATION – Technip – slide 16
    State-of-the-art Flexilay vessel dedicated to Brazilian market Skandi Vitoria (HCV) Start of operations: 2010 Product capacity of 2,750 tons of flexible pipes Length: 141 meters Built in Brazil / Brazilian Flag Deployment…
  17. MARCH 2010 INVESTOR PRESENTATION – Technip – slide 17
    Sophisticated Pipelaying System to enhance Vessel capabilities Apache II (Pipelay vessel) Opportunity seized to renew cost effective pipelay vessel 17
  18. MARCH 2010 INVESTOR PRESENTATION – Technip – slide 18
    Flexible lay systems Largest set of equipment in the industry & Greatest capabilities in terms of top tension Current Technip portfolio fully utilized Today, a Vertical Laying System is the component on the critical path to putting…
  19. MARCH 2010 INVESTOR PRESENTATION – Technip – slide 19
    Worldwide Manufacturing Plants for Flexible solutions and Umbilicals Duco Ltd Flexi France (Newcastle, UK) (Le Trait, France) Workforce: 350 Workforce: 950 Steel/plastic umbilical capacity: 300 km Flexible pipe capacity: 480 km…
  20. MARCH 2010 INVESTOR PRESENTATION – Technip – slide 20
    Asiaflex: new local ecosystem Unique flexible manufacturing plant in Asia Pacific Addresses new Asia Pacific Deepwater Subsea market Technips strategy Proximity to clients Access to deepwater jetty/ Logistic base Invest in…
  21. MARCH 2010 INVESTOR PRESENTATION – Technip – slide 21
    Worldwide Spoolbases for Rigid Reel lay solution Mobile, Alabama, USA Orkanger, Norway Evanton, UK Barra do Riacho, Brazil Dande, Angola 21
  22. MARCH 2010 INVESTOR PRESENTATION – Technip – slide 22
    Technip is a leader in Subsea Proven experience Rigid, Flexible and Hybrid pipe solutions All major challenges: Ultra deep / Harsh environment Developing new Technologies 22
  23. MARCH 2010 INVESTOR PRESENTATION – Technip – slide 23
    Thank you Alain Marion Senior Vice President, Subsea Assets & Technologies