PARETO SECURITIES OIL AND OFFSHORE CONFERENCE – Sevan Drilling

Sevan Drilling · Sep 1, 2011 · 27 slides

Investor presentation from the Shale Experts oil & gas presentation and slide database. Every page is imaged and its text indexed for search across operators, plays, basins and time.

Slides

  1. PARETO SECURITIES OIL AND OFFSHORE CONFERENCE – Sevan Drilling – slide 1
    A pure-play ultra deepwater drilling company Pareto Oil & Offshore Conference 2011 1 September 2011
  2. PARETO SECURITIES OIL AND OFFSHORE CONFERENCE – Sevan Drilling – slide 2
    IMPORTANT INFORMATION THIS PRESENTATION AND ITS ENCLOSURES AND APPENDICES (HEREINAFTER JOINTLY REFERRED TO AS THE PRESENTATION) HAVE BEEN PREPARED BY SEVAN DRILLING ASA (SEVAN DRILLING OR THE COMPANY) EXCLUSIVELY FOR INFORMATION…
  3. PARETO SECURITIES OIL AND OFFSHORE CONFERENCE – Sevan Drilling – slide 3
    Agenda Company Overview Highlights in Q2 2011 Operational review Construction and Fleet update Market Outlook
  4. PARETO SECURITIES OIL AND OFFSHORE CONFERENCE – Sevan Drilling – slide 4
    A pure-play ultra deepwater drilling company Four high-end ultra deepwater (UDW) rigs One rig drilling off Brazil on a 6 year contract with Petrobras. One rig for delivery in Q1 2012 on a 6 year contract with Petrobras Two rigs under…
  5. PARETO SECURITIES OIL AND OFFSHORE CONFERENCE – Sevan Drilling – slide 5
    High-end UDW rigs with a unique and cost efficient design Sevan Driller Sevan Brasil 2 x UDW newbuild rigs Delivered from COSCO end 2009 Under construction at COSCO Contract with COSCO for two new In operation for Petrobras under…
  6. PARETO SECURITIES OIL AND OFFSHORE CONFERENCE – Sevan Drilling – slide 6
    Solid contract coverage and backlog
  7. PARETO SECURITIES OIL AND OFFSHORE CONFERENCE – Sevan Drilling – slide 7
    Bank Loan Facilities Two loan facilities Sevan Driller (7 banks) Sevan Brasil (4 banks) Sevan Marine provided the Parent Company Guarantee in both loans and both loans contain cross default provisions. Obtained approval to remove…
  8. PARETO SECURITIES OIL AND OFFSHORE CONFERENCE – Sevan Drilling – slide 8
    Company Overview Highlights Q2 2011 Operational review Construction and Fleet update Market Outlook
  9. PARETO SECURITIES OIL AND OFFSHORE CONFERENCE – Sevan Drilling – slide 9
    Highlights Q2 2011 Capital increase and listing on 1 Oslo Axess 2 Steady operational performance 3 Operating costs improved Cross Default Provisions Removed 4 Sevan Brasil on track 5 Order placed for two new…
  10. PARETO SECURITIES OIL AND OFFSHORE CONFERENCE – Sevan Drilling – slide 10
    Company Overview Highlights Q2 2011 Operational Review Construction and Fleet update Market Outlook
  11. PARETO SECURITIES OIL AND OFFSHORE CONFERENCE – Sevan Drilling – slide 11
    Sevan Driller in stable operations Campos Basin operation Challenging area for drilling, one of the first wells to be drilled in this area Operating in water depths of 1,900 meters Passed one year without a Loss Time Incident in…
  12. PARETO SECURITIES OIL AND OFFSHORE CONFERENCE – Sevan Drilling – slide 12
    Good uptime and highly rated by client Petrobras rating system called Rig uptime of 98% last month Bad Sonda. 120% Monthly review of all third party rigs 98% Based on a number of 100% 94% 96% 90% 91% criterion Safety, technical…
  13. PARETO SECURITIES OIL AND OFFSHORE CONFERENCE – Sevan Drilling – slide 13
    Company Overview Highlights Q2 2011 Operational Review Construction and Fleet Update Market Outlook
  14. PARETO SECURITIES OIL AND OFFSHORE CONFERENCE – Sevan Drilling – slide 14
    Sevan Brasil ready for delivery in Q1 2012 Progress is in line with expectations 87 % completion All equipment except for risers and thrusters have been installed Very close follow-up of cost in final stage On schedule for…
  15. PARETO SECURITIES OIL AND OFFSHORE CONFERENCE – Sevan Drilling – slide 15
    Construction progress Sevan Brasil Progress break down 100 80 Completion in % 60 40 20 0 Jun '09 Sept '09 Dec '09 Mar '10 June '10 Sept '10 Dec '10 Mar '11 June '11 Sept '11 Dec '11 Actual Overall Progress Forecast…
  16. PARETO SECURITIES OIL AND OFFSHORE CONFERENCE – Sevan Drilling – slide 16
    Rigs 3 and 4 are under construction Firm turnkey construction contracts for two Drilling control system UDW Derrick BOP Control system COSCO shipyard Pipehandling Marine riser system Cranes Total price USD 526 million Delivery…
  17. PARETO SECURITIES OIL AND OFFSHORE CONFERENCE – Sevan Drilling – slide 17
    Company Overview Highlights Q2 2011 Operational Review Construction and Fleet update Market Outlook
  18. PARETO SECURITIES OIL AND OFFSHORE CONFERENCE – Sevan Drilling – slide 18
    Overview 2010 discoveries Highest number of discoveries and largest discoveries in deepwater Source : First Securities, WoodMac 18
  19. PARETO SECURITIES OIL AND OFFSHORE CONFERENCE – Sevan Drilling – slide 19
    Historical demand deepwater Brazil and new regions are main demand drivers. Source : First Securities, ODS Petrodata 19
  20. PARETO SECURITIES OIL AND OFFSHORE CONFERENCE – Sevan Drilling – slide 20
    Clients paying a premium for modern rigs
  21. PARETO SECURITIES OIL AND OFFSHORE CONFERENCE – Sevan Drilling – slide 21
    Company Overview Highlights Q2 2011 Operational Review Construction and Fleet update Market Outlook Financials
  22. PARETO SECURITIES OIL AND OFFSHORE CONFERENCE – Sevan Drilling – slide 22
    Key investment considerations Operational control Sevan Driller Delivery is on time and on budget Sevan Brasil Cross default provisions removed More robust financial position Currency risk is low 75% of interest risk…
  23. PARETO SECURITIES OIL AND OFFSHORE CONFERENCE – Sevan Drilling – slide 23
    Outlook Focus on safe and efficient operations of Sevan Driller Full management attention on close follow up of Sevan Brasil Marketing of the new rigs available in Q4 2013 and Q2 2014 23
  24. PARETO SECURITIES OIL AND OFFSHORE CONFERENCE – Sevan Drilling – slide 24
    Appendix
  25. PARETO SECURITIES OIL AND OFFSHORE CONFERENCE – Sevan Drilling – slide 25
    Income and cost structure One source of income (Sevan Driller) Affected by: Uptime Performance level Activity (Moving, Normal Operations, Waiting on Weather) Cost divided into four categories: Cash Operating item (operating rig…
  26. PARETO SECURITIES OIL AND OFFSHORE CONFERENCE – Sevan Drilling – slide 26
    Income statement Q2 2011 USD million Q2 2011 Q1 2011 P First quarter with independent reporting Revenues of USD 33.3 million Operating income 33,3 34,0 EBITDAFX of USD 13.7 million Operating expense (19,6) (18,2) EBITDAFX 13,7 15,8…
  27. PARETO SECURITIES OIL AND OFFSHORE CONFERENCE – Sevan Drilling – slide 27
    Balance Sheet and Cash Flow Balance Sheet USDm 30.06.2011 30.03.2011P Capitalization on drilling rigs is split between Sevan Driller (USD 669 million), Drilling Rigs 1 231,9 999,0 Other non-current assets 51,9 54,8 Sevan Brasil (USD…