Bonanza Creek Overview Wattenberg Field Market Cap: 632 million North Park Basin (Niobrara & Codell) Share Price: 16.00 (Niobrara) 20,817 Mboe 1P (1) Shares Outstanding : 39.5 million 611 Mboe 1P 59% Oil 100% Oil 100+%…
First Quarter 2012 Highlights 96% Increase in Production(1) 646 Mboe (7,100 Boe/d) 76% oil and liquids 132% Increase in EBITDAX (1) (2) 31.5 million (0.80/sh) 541 Boe/d Avg. 30-day Rate Niobrara Hz 486 Boe/d, 72% oil,…
Robust Growth in Reserves and Production Proved Reserves(1) (Mboe) Production(1) (Boe/d) 50,000 10,000 RANGE 9,000 40,000 8,000 7,000 G 30,000 6,000 U I 5,000 D A 20,000 4,000 N C E 3,000 10,000 2,000 1,000 0 0 2007…
Significant Leverage to Oil & Liquids 1Q 2012 Revenue Cash Margin / Boe (1) 49.5 Million 76.68 7% Nat. Gas 66% Cash Margin 93% Liquids 11% Cash G&A 7% Prod. Taxes 16% LOE (1) Average sales price for a barrel of oil…
Organic Growth Pipeline Full Development Testing Monitoring Wattenberg Niobrara North Park Niobrara (67 MMBoe) (30-60 MMBoe) Brown Dense (30 MMBoe) 1,200 drilling locations 400 PUDs 7
Capital and Drilling Activity 2011 Capital: 165 MM 2012 Capital(1): 250 MM Vertical: 52 MM Vertical: 72 MM 66 wells (Wattenberg) 92 wells 2 wells (North Park) ROCKY MOUNTAINS Horizontal: 99 MM Horizontal: 25 MM 24 wells…
Wattenberg Horizontal Niobrara Economics EUR 312,000 Boe; 76% liquids 30-day Rate 469 Boe/d Cost per Well 4.0 MM NPV-10 at 80/BO 4.1 MM NPV-10 at 100/BO 6.1 MM Locations 290 net IRR % at /BO WTI(1) 125% 100% 75% 50% 25% 70…
Wattenberg Inventory Targets CURRENT DEVELOPMENT FUTURE TARGETS 14
North Park Basin Niobrara EUR 211,000 Boe 30-day Rate 304 Boe/d % Oil 90% Cost per Well 5.1 MM NPV-10 at 80/BO 2.1 MM NPV-10 at 100/BO 3.9 MM Bonanza Creek acreage Type Curve(1) (Boe/d) 350 300 250 200 150 100 50 0…
Mid-Continent Operations (Arkansas) 14,980 gross (13,474 net) acres; 100% HBP ERA SYSTEM SERIES GROUP FORMATION CENOZOIC EOCENE Claiborne PALEOCENE Wilcox TERTIARY Midway Primary Target: Cotton Valley: 4,000 7,000 feet CRETACEOUS…
Mid-Continent Stable, Long-Life Growth Boe/d 6,000 5,000 4,000 3,000 2,000 1,000 0 2008 2009 2010 2011 2012 2013 2014 (1) Forecast assumes 10-acre spacing. BCEI will test further down-spacing in 2012. 17
Dorcheat-Macedonia Economics EUR 152,000 Boe Peak 30-day Rate 103 Boe/d % Oil & Liquids 70% Cost per Well 1.7MM NPV-10 at 80/BO 1.9 MM NPV-10 at 100/BO 2.8 MM IRR % at /BO WTI(1) 125% 100% 75% 50% 25% 0% 70 80 90 100…
Financial Overview 19
2012 Guidance Total: 3,175 - 3,650 Mboe Production Average Net Daily Production: 8,700 - 10,000 Boe/d Percent Oil & NGLs: 69% Lease Operating: 7.20 - 8.20 Operating Costs and Expenses Severance and Ad Valorem: 3.60 - 4.00 (per Boe)…
Capitalization & Liquidity Borrowing Base 245 Million Outstanding at March 31, 2012 21.6 Million Liquidity 223 Million 21
Hedge Positions(1) Commodity & Contract Term Type Avg. Volume Floor Ceiling Avg. Price Crude Oil (Bo/Month) May 2012 collar 67,956 90.00 106.45 June December 2012 collar 77,956 90.00 106.05 January April 2013 collar 42,654 91.64…
Buying High Growth & Experience Highest company leverage to Wattenberg Niobrara Oil & liquids focused; 100% production growth in 2012 Proven management team Strong balance sheet considerable cash flow and credit…
Corporate Information Company Headquarters Investor Relations 410 17th Street, Suite 1400 James M. Masters Investor Relations Manager Denver, Colorado 80202 (720) 440-6121 (720) 440-6100 Main jmastersbonanzacrk.com (720) 305-0804…
Appendix 25
Experienced Management Team Founder of predecessor companies Mike Starzer Prior: Executive and Engineering roles at Unocal and Berry Petroleum President & CEO B.S. in Petroleum Engineering, Colorado School of Mines; M.S. in…
Wattenberg Horizontal Niobrara Economics (Boe/d) 500 Type Curve(1) 312,000 Boe EUR 400 65% crude oil; 35% natural gas 356,000 Boe EUR 300 57% crude oil; 19% NGLs; 24% nat. gas 200 Field Development 42,218 gross (29,262…
Wattenberg Vertical Niobrara/Codell Development Economics Type Curve(1) 955,000 CapEx 78,000 Boe EUR 725,000 initial well cost 65 Boe/d 30-day rate 230,000 refrac in five years Re-frac after 5 years with peak rate 70% of IP…
Cotton Valley Lenticular Oil Sands Focused completion technology DORCHEAT UNIT 37 Dorcheat Unit 37 Bbl/d Mcf/d Boe/d improves recovery Highly repeatable 30-day IP 93 1,326 314 Consistent historical results 1 Year Exit Rate 27 574…
Dorcheat-Macedonia Field (Boe/d) 120 Type Curve(1) Recompletions opening additional Cotton Valley oil pay zones up hole 152,000 Boe EUR(2) 100 Initial 30-day rate: 67 Boe/d Peak 30-day rate: 103 Boe/d Include subsequent…
Mid-Continent Gas Processing Facilities General Overview Approximately 150 miles of gathering lines Nevada Processes minor quantities of third party natural gas Facilities interconnect into the CenterPoint Energy pipeline system…
California Region 8,940 gross (5,012 net) acres 100% HBP Thermal development opportunity in Kern River and Midway Sunset 16.5 MMBoe original oil in place(1) 0.7 MMBoe of Proved Reserves 100% crude oil 37% developed…