Skip to main content February 2014 Investor Presentation – 3legs Resources | Shale Experts
Loading...

February 2014 Investor Presentation – 3legs Resources

3legs Resources · Feb 1, 2014 · 15 slides

Investor presentation from the Shale Experts oil & gas presentation and slide database. Every page is imaged and its text indexed for search across operators, plays, basins and time.

Slides

  1. February 2014 Investor Presentation – 3legs Resources – slide 1
    3Legs Resources plc 2014 work programme February 2014
  2. February 2014 Investor Presentation – 3legs Resources – slide 2
    Why Poland Promising acreage we maintain that our Baltic Basin concessions represent some of the most prospective shale acreage in onshore Poland Promising results gas flowed to surface and flared from all 4 wells on our 3 western…
  3. February 2014 Investor Presentation – 3legs Resources – slide 3
    Supportive political environment Recent new appointments of Minister of Environment and Chief Geologist Industry concerns on planned regulatory reforms are being heard: NOKE (vehicle for state participation in private sector E&P…
  4. February 2014 Investor Presentation – 3legs Resources – slide 4
    3Legs drilling activity, 2010-2013 Activity on 3Legs concessions 2010 2 vertical wells drilled, Lebien LE-1 and Strzeszewo LE-1 30km Legowo LE-1 2011 Drilled the first 2 horizontal shale gas Lebien LE1 & LE-2H wells in Poland,…
  5. February 2014 Investor Presentation – 3legs Resources – slide 5
    2014 programme - introduction Data gathered from vertical wells to date have enabled a detailed understanding of stimulation effectiveness and of reservoir properties in target shale horizons The optimal route to assessing flow rate…
  6. February 2014 Investor Presentation – 3legs Resources – slide 6
    2014 programme current status Lublewo vertical well Slawoszyno LEP-1 Lublewo LEP-1 Drilling and coring concluded in January 2014 Karwia TVD of 2924m Strzeszewo LE-1 141m of 4 core taken across the lower Silurian, Ordovician and…
  7. February 2014 Investor Presentation – 3legs Resources – slide 7
    2014 programme - detail Drilling of two new vertical wells, Lublewo LEP-1 (concluded) and Slawoszyno LEP-1 Further improve understanding of our two target formations in our high graded area, including depth, thickness and shale…
  8. February 2014 Investor Presentation – 3legs Resources – slide 8
    Peer activity will also generate newsflow Activity by two other operators in the basin may also generate relevant data: BNK is currently drilling a long lateral well at Gapowo , due to be fracced and tested this year San Leon has…
  9. February 2014 Investor Presentation – 3legs Resources – slide 9
    Conclusions to date Manage formation sensitivity to water to maximise productivity from target formations Use improved mud system in the shale horizons in future wells Based on core analysis to date Completion designs now based on a…
  10. February 2014 Investor Presentation – 3legs Resources – slide 10
    Conclusions to date: Sasino isopach map graded area 3Legs high- Source: 3Legs Resources Ongoing core analysis confirms our geological interpretation to date, which shows our high graded area for the Sasino and Piasnica zones…
  11. February 2014 Investor Presentation – 3legs Resources – slide 11
    Conclusions to date: Piasnica isopach map graded area 3Legs high- Source: 3Legs Resources 3Legs estimates the Piasnica (or Cambrian Alum) formation to have over 15 metres of thickness across its high-graded area; it was not…
  12. February 2014 Investor Presentation – 3legs Resources – slide 12
    US analogy still an important reminder Shows well performance can improve significantly as appraisal stage progresses Average production rates by year Average reserves per well by year Fayetteville shale Fayetteville shale 5,104…
  13. February 2014 Investor Presentation – 3legs Resources – slide 13
    Indicative timetable and cost Planned activity to Q3 2014 Western Baltic Basin concessions 2013 2014 Activity Q4 Q1 Q2 Q3 Q4 Strz esz ewo LE-1 DFIT/frac/testing Lublewo LEP-1 Drilling/ coring/ logging Slawosz yno LEP-1…
  14. February 2014 Investor Presentation – 3legs Resources – slide 14
    Conclusion 3Legs is maintaining its strategy of focusing on our western Baltic Basin concessions 3Legs believes that the 2014 programme is the optimum way to unlock, quickly and efficiently, the long term potential of the Baltic…
  15. February 2014 Investor Presentation – 3legs Resources – slide 15
    www.3legsresources.com

From the store