Skip to main content CAPITAL MARKETS PRESENTATION – Premier Oil | Shale Experts
Loading...

CAPITAL MARKETS PRESENTATION – Premier Oil

Premier Oil · Feb 6, 2014 · 53 slides

Investor presentation from the Shale Experts oil & gas presentation and slide database. Every page is imaged and its text indexed for search across operators, plays, basins and time.

Slides

  1. CAPITAL MARKETS PRESENTATION – Premier Oil – slide 1
    CAPITAL MARKETS PRESENTATION 6th February 2014
  2. CAPITAL MARKETS PRESENTATION – Premier Oil – slide 2
    Introduction ...our strategy is to invest in high-quality developments whilst maintaining balance sheet strength... Premier Today Going Forward Robust cash flow and profitability The Board will: 800 mmboe reserves and resources…
  3. CAPITAL MARKETS PRESENTATION – Premier Oil – slide 3
    Balance Sheet Strength and Flexibility
  4. CAPITAL MARKETS PRESENTATION – Premier Oil – slide 4
    Robust balance sheet and funding position Current net debt of 1.45 bn Gearing of 41%, well within Board guidelines Significant headroom on financial covenants today and going forward Cash flow cover at 2x (covenant…
  5. CAPITAL MARKETS PRESENTATION – Premier Oil – slide 5
    Significant cash flow growth Financial Outlook Cash Flows (Current Oil Prices) 2014 guidance 58-63 kboepd Positive start to 2014 production Changing mix generates higher cash flows Solan, Catcher fields Add up to 30,000 bopd of…
  6. CAPITAL MARKETS PRESENTATION – Premier Oil – slide 6
    Portfolio optionality Prudent Financial Management Significant Flexibility Planning case 85/bbl Current oil price 105/bbl Active disposal programme Active disposal programme continues Will seek partner for Sea Lion Will seek partner…
  7. CAPITAL MARKETS PRESENTATION – Premier Oil – slide 7
    Catcher Development
  8. CAPITAL MARKETS PRESENTATION – Premier Oil – slide 8
    Catcher development overview Project Sanction Pre-tax IRR 20% based on 85/bbl Gross reserves (2P) of 92 mmboe within initial development Upside of 140 mmboe Excellent reservoir qualities 35% porosity and very high permeabilities…
  9. CAPITAL MARKETS PRESENTATION – Premier Oil – slide 9
    New North Sea hub Location: Block 28/9 Water depth: 300 feet 3 fields as part of initial development 22 wells to be drilled Catcher area discoveries: Catcher August 2010 Varadero January 2011 Burgman March 2011 Carnaby June 2012…
  10. CAPITAL MARKETS PRESENTATION – Premier Oil – slide 10
    Exploration and appraisal success All exploration and appraisal wells encountered hydrocarbon bearing sands: Varadero Tay sands in 28/9-1Z, -3, -2, -4, -4Z, -5A, -6 and -6Z (all fields) Catcher Cromarty sands in 28/9-1, Burgman…
  11. CAPITAL MARKETS PRESENTATION – Premier Oil – slide 11
    Good understanding of the rocks Region of deposition of original Cromarty and Tay sands Joseph C. DeVay et al, 2000, AAPG Memoir 72 / SEPM Special Publication No. 68 Late Palaeocene/early Eocene turbidite sand systems Tay…
  12. CAPITAL MARKETS PRESENTATION – Premier Oil – slide 12
    Seismic will assist with well placement Catcher Cromarty Catcher East (Tay) GOC Balder OWC Catcher Catcher East (Tay) Cromarty Chalk Polarcus HD seismic (far stack coloured inversion) Excellent quality seismic…
  13. CAPITAL MARKETS PRESENTATION – Premier Oil – slide 13
    Catcher development overview 6th February 2014 // Page 13
  14. CAPITAL MARKETS PRESENTATION – Premier Oil – slide 14
    Catcher area development scheme
  15. CAPITAL MARKETS PRESENTATION – Premier Oil – slide 15
    Reservoir depletion optimised Oil pore volume thickness map 22 well development including 14 producers and 8 injectors Wells target thickest oil sands to maximise rate and recovery VP3 VI3 Wells positioned to allow CTP7 effective…
  16. CAPITAL MARKETS PRESENTATION – Premier Oil – slide 16
    Rig and well systems contracts awarded Wells drilled over six - 4 slot templates from a Heavy Duty Jack-Up Subsea well system with HP riser Subsea trees run from Jack-Up (similar to Huntington development) Ability to workover wells…
  17. CAPITAL MARKETS PRESENTATION – Premier Oil – slide 17
    FPSO build Concluded a highly competitive tender process 3 international companies Re-fit versus new build Formal announcement of preferred bidder imminent 750,000 bbls oil storage Designed for Functional Spec 125,000 bpd…
  18. CAPITAL MARKETS PRESENTATION – Premier Oil – slide 18
    Production profile 6th February 2014 // Page 18
  19. CAPITAL MARKETS PRESENTATION – Premier Oil – slide 19
    Upside near field discoveries and exploration Exploration (Laverda) Laverda 25 mmbbls STOIIP Low cost tie-back to Catcher development Catcher North (CTP2 well) 2-4 mmbbls reserves Catcher Possible subsea tie-back or North (CTP2)…
  20. CAPITAL MARKETS PRESENTATION – Premier Oil – slide 20
    Cost parameters 6th February 2014 // Page 20
  21. CAPITAL MARKETS PRESENTATION – Premier Oil – slide 21
    Catcher tax attributes Bare-boat Charter Industry-wide discussions are ongoing with HMT regarding the possible introduction of taxation on bare-boat charter income Small Field Allowances The Small Field Allowance shelters 150 m…
  22. CAPITAL MARKETS PRESENTATION – Premier Oil – slide 22
    Major milestones Premiers Board has approved the project Formal Sanction on completion of the contracts and receipt of JV and Government approvals The FDP will be submitted to DECC next week Environmental Statement already…
  23. CAPITAL MARKETS PRESENTATION – Premier Oil – slide 23
    Falklands Projects
  24. CAPITAL MARKETS PRESENTATION – Premier Oil – slide 24
    Falkland Islands Location Situated on the southern part of the South American Plate on the Falkland Plateau Mid Nazca Plate 220km from the Falkland Islands in Atlantic Ridge the North Falkland Basin Water depth 450m Premier Oil…
  25. CAPITAL MARKETS PRESENTATION – Premier Oil – slide 25
    Premiers Falkland Islands portfolio Licence PL032 Premier 60%, operator; Rockhopper 40% Contains Sea Lion discovery made in 2010, extensively appraised in 2011 Chatham exploration prospect PL032 Licence PL004 PL004b Premier 36%,…
  26. CAPITAL MARKETS PRESENTATION – Premier Oil – slide 26
    Sea Lion structural and depositional setting PL032 SL30 SL20 SL10 Casper Casper South Beverley Zebedee Jayne E Syncline Axis PL004b PL004c Stratigraphically trapped in overlapping deep water lacustrine fans - younger…
  27. CAPITAL MARKETS PRESENTATION – Premier Oil – slide 27
    Key appraisal wells 6th February 2014 // Page 27
  28. CAPITAL MARKETS PRESENTATION – Premier Oil – slide 28
    Dataset and key reservoir and fluid parameters Extensive appraisal dataset Discovered by well 14/10-2 and appraised by 8 wells (plus 2 sidetracks to core) 3D data full stack reflectivity seismic (2007 and 2010, merged in 2011/12) Well…
  29. CAPITAL MARKETS PRESENTATION – Premier Oil – slide 29
    Sea Lion Phase 1 development TLP Offtake Floating Storage Tension Leg Tanker & Offloading Platform Concept Selection Highlights Permanent Drilling Rig Minimal Subsea Infrastructure Phased Development Improved Economics Gas…
  30. CAPITAL MARKETS PRESENTATION – Premier Oil – slide 30
    Phase 1 reservoir development plan Active waterflood with multiple pore volumes of water injection over field life (5 bbl per bbl of oil recoverable) 32 development wells 19 producers and 11 water injectors 2 subsea gas injection…
  31. CAPITAL MARKETS PRESENTATION – Premier Oil – slide 31
    TLP oil producer well design Water Injection Wells Inclined trajectories Cased and perforated Conventional Gas Lift Hydraulically fractured Heated water Downhole Wax Inhibitor Electrical Tubing Heating Horizontal up to 1500 m…
  32. CAPITAL MARKETS PRESENTATION – Premier Oil – slide 32
    TLP analogues Sea Lion Olympus Development Name (Pre-FEED) (MARS B) Operator Premier Shell Region S. Atlantic GoM WD (ft) 1,372 3,000 Oil (mbpd) 120 100 Gas (mmscfd) 165 180 Manning Level 175-200 192 Slots 32-36 24 Date…
  33. CAPITAL MARKETS PRESENTATION – Premier Oil – slide 33
    Project organisation 6th February 2014 // Page 33
  34. CAPITAL MARKETS PRESENTATION – Premier Oil – slide 34
    TLP build Living Quarters Topsides Fabrication and Integration U.S. Korea Utility Module Singapore Dubai Drilling Module Process Module Hull Fabrication Korea China Hull Flare Boom Singapore Japan Survival Craft…
  35. CAPITAL MARKETS PRESENTATION – Premier Oil – slide 35
    TLP transportation 6th February 2014 // Page 35
  36. CAPITAL MARKETS PRESENTATION – Premier Oil – slide 36
    Operations and logistics Exploration drilling support model Drilling base in Stanley from which supply boats and helicopters support the rig Regular freighter supplies from the UK to the drilling base Fortnightly charter flight from…
  37. CAPITAL MARKETS PRESENTATION – Premier Oil – slide 37
    Design phase milestones 18 month Design phase Concept Selection to the start of execution (award of the EPC contract(s)) Award of FEED Contracts in Q2 2014 Shortlisting of EPC bidders in Q4 2014 Updated cost estimates available Q4…
  38. CAPITAL MARKETS PRESENTATION – Premier Oil – slide 38
    Phase 1 development costs Indicative costs subject to FEED Surface Facilities Capex 3.5 bn TLP 2.4 bn Subsea and risers 0.45 bn Project management and other costs 0.65 bn Drilling Capex 1.7 bn Total Phase 1 Capex 5.2 bn Spend to…
  39. CAPITAL MARKETS PRESENTATION – Premier Oil – slide 39
    Economics and financing Economics Discount of 6.50 to Brent is assumed to account for oil quality and transportation Sea Lion Phase 1 yields an IRR of around 20% at an oil price of 85/bbl (real) Project Funding Strategy Corporate…
  40. CAPITAL MARKETS PRESENTATION – Premier Oil – slide 40
    Phase 2 development Phase 2 Development of Casper, Casper South Plus the southern extent of Sea Lion Single manifold subsea tie-back to the TLP More detailed development studies underway Development plan will incorporate…
  41. CAPITAL MARKETS PRESENTATION – Premier Oil – slide 41
    Further Sea Lion scale opportunities Lower F2 amplitude extraction F3G amplitude extraction High quality dataset Size of exploration prize: Sea Lion 1,000 mmbbls prospective fan outline resources 250 mmbbls risked Four E&A wells to…
  42. CAPITAL MARKETS PRESENTATION – Premier Oil – slide 42
    Zebedee high impact near field 3D visualisation of Casper South and Zebedee sands Zebedee prospect Onlaps the Sea Lion field Fan input Onlapped by the Casper South discovery Extends the proven SLMC (F2 sequence) play Gross…
  43. CAPITAL MARKETS PRESENTATION – Premier Oil – slide 43
    Jayne East high impact near field Amplitude extraction F2 lower fan Equity increased to 36%, partner equity interests now aligned and fully funded Jayne East Well to test five potential reservoirs levels across the F2 and F3…
  44. CAPITAL MARKETS PRESENTATION – Premier Oil – slide 44
    Isobel/Elaine another Sea Lion Single stratigraphic layer within Elaine/Isobel complex Equity increased to 36%, partner equity interests now aligned and fully funded Isobel Deep Stacked targets exclusively within F3 sequence Gross…
  45. CAPITAL MARKETS PRESENTATION – Premier Oil – slide 45
    Key Messages
  46. CAPITAL MARKETS PRESENTATION – Premier Oil – slide 46
    Key messages Balance sheet strength, financial flexibility supported by asset disposals Catcher: high quality project, attractive returns Sea Lion: high quality project, will seek partner before sanction ...our strategy is to…
  47. CAPITAL MARKETS PRESENTATION – Premier Oil – slide 47
    Q&A
  48. CAPITAL MARKETS PRESENTATION – Premier Oil – slide 48
    Appendix
  49. CAPITAL MARKETS PRESENTATION – Premier Oil – slide 49
    Subsea In-field manifolds (3-off) Common design for each manifold structure 9-slot assemblies (6x production + 3x water injection) Slab sided structures with piled foundations (estimated 230 tonnes) Fishing friendly Incorporates…
  50. CAPITAL MARKETS PRESENTATION – Premier Oil – slide 50
    Subsea riser base structures (3-off) Similar design for each riser base tie-in structure Open sided (estimated weight 100 tonnes) Dropped object protection only (i.e. all structures are located within FPSOs 500m safety zone so not…
  51. CAPITAL MARKETS PRESENTATION – Premier Oil – slide 51
    Subsea bundle option Three similar bundle systems planned for tie-back of the developments Each bundle circa 3.5km in length, comprising a 38 outer carrier pipe designed to house the 12 production, 10 water injection and 4 gas lift…
  52. CAPITAL MARKETS PRESENTATION – Premier Oil – slide 52
    Subsea gas export structure Slope sided to resist trawl gear snagging loads and promote over trawl-ability Approximate weight of 110 tonnes Supports connection of a temporary subsea pig receiver c/w DB&B isolation Supports entry of a…
  53. CAPITAL MARKETS PRESENTATION – Premier Oil – slide 53
    www.premier-oil.com

From the store

Browse maps, data & reports in the Shale Experts store