Skip to main content EnerCom The Oil and Gas Conference 2015 – Lonestar Resources Ltd. Investor Presentation | Shale Experts
Loading...

EnerCom The Oil and Gas Conference 2015 – Lonestar Resources Ltd.

Lonestar Resources Ltd. · Aug 18, 2015 · 34 slides

Investor presentation from the Shale Experts oil & gas presentation and slide database. Every page is imaged and its text indexed for search across operators, plays, basins and time.

Slides

  1. EnerCom The Oil and Gas Conference 2015 – Lonestar Resources Ltd. – slide 1
    Lonestar Resources, Ltd. Presentation to Investors August, 2015
  2. EnerCom The Oil and Gas Conference 2015 – Lonestar Resources Ltd. – slide 2
    Company Profile Share Price History Lonestar is a rapidly growing E&P company 35.00 100.0 focused on the Eagle Ford Shale 30.00 Drilling and acquisition capital concentrated in 80.0 the crude oil window of the Eagle Ford Shale…
  3. EnerCom The Oil and Gas Conference 2015 – Lonestar Resources Ltd. – slide 3
    Lonestars Footprint 1 BAKKEN THREE FORKS 35,000 net acres Resource Assessment 3D Seismic Complete 80 Conventional Prospects identified Intense Fracturing in Unconventional Targets CONVENTIONAL OIL & GAS Mature Producing…
  4. EnerCom The Oil and Gas Conference 2015 – Lonestar Resources Ltd. – slide 4
    Lonestars Growth History Current Team In Place Since 2012 Company Originally Funded by Ecofin, UKbased Private Equity Group Assembled Team of Senior Personnel from Encore, Pioneer, Denbury, Approach. Focused on Developing…
  5. EnerCom The Oil and Gas Conference 2015 – Lonestar Resources Ltd. – slide 5
    Strategic Positioning for the Current Environment Position Lonestar to Materially Benefit From Industry Malaise Ensure Adequate Liquidity Source Drilling Capital to Ramp Business for Farmins and Acquisitions Protect Cash Flow New…
  6. EnerCom The Oil and Gas Conference 2015 – Lonestar Resources Ltd. – slide 6
    Eagle Ford Shale Growth and Development Plan
  7. EnerCom The Oil and Gas Conference 2015 – Lonestar Resources Ltd. – slide 7
    Lonestars Track Record of Rapid Growth Net Acreage Eagle Ford Shale Trend Reserves (MMBOE)1 35,000 50 30,000 40 25,000 30 20,000 15,000 20 10,000 10 5,000 0 0 Dec11 Dec12 Dec13 Dec14 Dec11 Dec12 Dec13 Dec14 Proved Probable…
  8. EnerCom The Oil and Gas Conference 2015 – Lonestar Resources Ltd. – slide 8
    Portfolio Focused on the Eagle Ford Total Eagle Ford Engineered Acreage Net Acres 34,360 NonEngineered Acreage Gross Engineered Locations 143 Additional Locations 70 Avg. W.I. 91% Eastern Net Acres 1 10,730 Gross Engineered…
  9. EnerCom The Oil and Gas Conference 2015 – Lonestar Resources Ltd. – slide 9
    Lonestars Footprint Across The Eagle Ford Is Significant 14 12 10 Counties With Completions 8 6 4 2 0 10
  10. EnerCom The Oil and Gas Conference 2015 – Lonestar Resources Ltd. – slide 10
    Rapidly Developing Expertise In All Regions Dimmit County Brazos/Burleson Counties 2,000 2,000 2,000 2,000 1,800 1,800 1,800 1,800 1,600 1,600 1,600 1,600 1,400 1,400 1,400 1,400 1,200 1,200 1,200 1,200 Feet/Day…
  11. EnerCom The Oil and Gas Conference 2015 – Lonestar Resources Ltd. – slide 11
    Revenue/BOE vs % Oil Production 50.00 LNREF 45.00 40.00 Revenue / BOE 35.00 30.00 25.00 20.00 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% % Oil Production Note: Revenue/BOE from 2Q15 (unhedged). Peer…
  12. EnerCom The Oil and Gas Conference 2015 – Lonestar Resources Ltd. – slide 12
    Production Cost/BOE vs % Oil Production 30.00 25.00 Production Costs / BOE 20.00 15.00 LNREF 10.00 5.00 0.00 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% % Oil Production Note: Production Cost /BOE from 2Q15.…
  13. EnerCom The Oil and Gas Conference 2015 – Lonestar Resources Ltd. – slide 13
    Unhedged Field Netback/BOE vs % Oil Production 35.00 LNREF 30.00 Field Netback / BOE 25.00 20.00 15.00 10.00 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% % Oil Production Note: Field Netback/BOE from 2Q15.…
  14. EnerCom The Oil and Gas Conference 2015 – Lonestar Resources Ltd. – slide 14
    Lonestars Hedges Are Among Highest of its Peers 90.00 Lonestar 80.00 Avgerage Price (/bbl) 70.00 60.00 50.00 40.00 30.00 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% % Of Oil Hedged 2016 Note: Data as of…
  15. EnerCom The Oil and Gas Conference 2015 – Lonestar Resources Ltd. – slide 15
    Enterprise Value/ 2105 EBITDAX as % of Oil Production 16.0x 14.0x Lonestar 12.0x 10.0x TEV/ EBITDAX 8.0x 6.0x Lonestar 4.0x 2.0x 0.0x 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% % Oil Production Note: Data as…
  16. EnerCom The Oil and Gas Conference 2015 – Lonestar Resources Ltd. – slide 16
    Western Region Summary Overview Lonestars Properties & Offset Wells Gross Leasehold 14,440 Net Leasehold 12,734 % HBP 65% Engineered Acreage Top EPS 6,000' to 9,250' Lateral Lengths 4,000' to 8,000' NonEngineered Acreage Assumed…
  17. EnerCom The Oil and Gas Conference 2015 – Lonestar Resources Ltd. – slide 17
    Western Region Burns Ranch Area Overview Gross Leasehold 3,697 Net Leasehold 2,905 % HBP 70% Top EPS 7,300' to 8,000' Assumed Spacing 500' WI% 79% NRI % 59% Engineered Locations Category Length PDP 0 5,000' 1 PUD 6 6,000' 2 PROB 18…
  18. EnerCom The Oil and Gas Conference 2015 – Lonestar Resources Ltd. – slide 18
    Western Region Beall Ranch Overview Gross Leasehold 2,390 Net Leasehold 2,335 % HBP 100% Top EPS 7,000' to 7,300' Assumed Spacing 500' WI% 98% NRI % 73% Engineered Locations Category Length PDP 18 5,000' 11 PUD 17 6,000' 5 PROB 0…
  19. EnerCom The Oil and Gas Conference 2015 – Lonestar Resources Ltd. – slide 19
    Western Region Horned Frog Overview Gross Leasehold 4,402 Net Leasehold 3,598 % HBP 0% Top EPS 8,750' to 9,250' Assumed Spacing 700' WI% 82% NRI % 64% Nonengineered Locations Category Length PDP 0 5,000' 0 PUD 2 6,000' 0 PROB 17…
  20. EnerCom The Oil and Gas Conference 2015 – Lonestar Resources Ltd. – slide 20
    Central Region Summary Overview Lonestars Properties & Offset Wells Gross Leasehold 11,382 Engineered Acreage Net Leasehold 10,897 % HBP 57% NonEngineered Acreage Top EPS 6,000' to 9,500' Southern Gonzales Lateral Lengths 5,000' to…
  21. EnerCom The Oil and Gas Conference 2015 – Lonestar Resources Ltd. – slide 21
    Central Region Southern Gonzales Overview Gross Leasehold 970 Net Leasehold 485 % HBP 100% Top EPS 8,700' to 9,500' Assumed Spacing 500'750' WI% 50% NRI % 38% Engineered Locations Category Length PDP 3 5,000' 0 PUD 3 6,000' 3 PROB…
  22. EnerCom The Oil and Gas Conference 2015 – Lonestar Resources Ltd. – slide 22
    Central Region Pirate Area Overview Gross Leasehold 7,726 Net Leasehold 7,726 % HBP 57% Top EPS 6,000' to 8,500' Assumed Spacing 750 WI% 100% NRI % 78% Engineered Locations Category Length PDP 8 5,000' 5 PUD 15 6,000' 19 PROB 21…
  23. EnerCom The Oil and Gas Conference 2015 – Lonestar Resources Ltd. – slide 23
    Eastern Region Summary Overview Lonestars Properties & Offset Wells Gross Leasehold 12,078 1 Engineered Acreage Net Leasehold 10,730 NonEngineered Acreage % HBP 33% Top EPS 6,500' to 12,000' Lateral Lengths 4,000' to 8,000' Aguila…
  24. EnerCom The Oil and Gas Conference 2015 – Lonestar Resources Ltd. – slide 24
    Eastern Region Central Brazos Area Overview Gross Leasehold 2,328 Net Leasehold 1,948 % HBP 35% Top EPS 9,800' to 10,500' Assumed Spacing 750 WI% 68% NRI % 51% Engineered Locations Category Length PDP 0 5,000' 0 PUD 0 6,000' 0 PROB…
  25. EnerCom The Oil and Gas Conference 2015 – Lonestar Resources Ltd. – slide 25
    Conventional Assets Stability & Free Cash Flow
  26. EnerCom The Oil and Gas Conference 2015 – Lonestar Resources Ltd. – slide 26
    Conventional Assets 3.5 MMBOE Proved Reserves 1 79% Crude Oil 11% of Lonestars Total Proved Reserves 691 BOEPD 2Q15 Production North Texas 59% Crude Oil & NGLs 12% of Lonestars Total Production LongLived Reserves with Low Capital…
  27. EnerCom The Oil and Gas Conference 2015 – Lonestar Resources Ltd. – slide 27
    BakkenThree Forks Resource Assessment Moving Forward
  28. EnerCom The Oil and Gas Conference 2015 – Lonestar Resources Ltd. – slide 28
    West Poplar Project Williston Basin West Poplar Resource Assessment Greater Williston Basin Lonestar (65% WI) assembled 57,500+ gross acres in a contrarian move, across the Brockton Froid fault Horizontal Objectives Bakken, Three…
  29. EnerCom The Oil and Gas Conference 2015 – Lonestar Resources Ltd. – slide 29
    2015 Guidance Average Daily Production Results & Guidance 2015 Eagle Ford Drilling Budget 74 to 83 million 6,500 16 gross / 14.2 net wells 6,000 Negligible spending on Conventional Assets, similar to 2014 5,500 Goal to essentially…
  30. EnerCom The Oil and Gas Conference 2015 – Lonestar Resources Ltd. – slide 30
    Appendix
  31. EnerCom The Oil and Gas Conference 2015 – Lonestar Resources Ltd. – slide 31
    High Caliber Management Team Executive Previous Experience Biography Over 28 years experience in oil and gas finance Frank D. Bracken, III Previously Managing Director at Jefferies LLC, where he led 5 billion in oil and gas Chief…
  32. EnerCom The Oil and Gas Conference 2015 – Lonestar Resources Ltd. – slide 32
    High Caliber Management Team (Contd) Executive Previous Experience Biography Scott E. Sabatka Over 34 years US / international exploration and development experience, including in the Texas Gulf Coast, Permian, Williston, Powder…
  33. EnerCom The Oil and Gas Conference 2015 – Lonestar Resources Ltd. – slide 33
    Glossary 1P reserves means proved reserves. 2P reserves means proved plus probable reserves. bbl means barrel. boe means barrels of oil equivalent, determined using a ratio of 6 Mcf of natural gas to 1 bbl of condensate or crude oil…
  34. EnerCom The Oil and Gas Conference 2015 – Lonestar Resources Ltd. – slide 34
    EBITDA Assumptions EBITDA estimates are based on the following assumptions: Production estimates as set out in this presentation. The total number of planned wells at each asset is consistent with assumptions contained in the…

From the store

Browse maps, data & reports in the Shale Experts store