Laredo Positioned for Any Environment Experienced management team has weathered commodity price drops of 50% or more five times Contiguous acreage base enables production corridors that drive lower capital and operational costs…
High-Quality Contiguous Acreage 162,143 Gross/144,039 net acres1, 89% WI 4.3 billion barrels of resource potential on 7,700 identified locations2 3,200 operated Development Ready Hz locations with 90% average WI 95% average WI…
Identified Resource Potential 4,500 4.3 BBOE 4,000 3,500 3,000 MMBOE 2,500 2,000 1,500 1,000 500 0 Total Proved1 Development 2 Hz Hz Total Resource (12/31/14) Ready Commerciality Commerciality Potential Confirmed…
Divestiture of Non-Strategic Properties Recently announced agreement to sell non-strategic properties Expected to close September 2015 5,882 net acres Primarily non-operated Sales proceeds of 65 million1 Proceeds utilized to…
Reagan North Corridor 11-well Development Project Enhancing returns with multi-well pads on production corridors, long laterals and the Earth Model Multi-well pads Reagan North corridor LPI leasehold Laredo Acreage Regan…
Project Fully Utilizes Earth Model Earth Model utilized to select optimal landing points and geosteer wellbore to keep it in targeted, highest potential zone UWC and MWC zones targeted Future targets 10
4,500 gross ft of prospective zones Developing to Maximize NPV Laredo is focused on developing the entire resource and maximizing operational efficiency by drilling stacked laterals on multi-well pads and concentrating…
Efficient Development of the Entire Resource Stacked Lateral Multi-Well Pads Horizontal Wells on Multi-Well Pads Four-stacked Three-stacked Two-stacked 2013 13 of pads 2 11 23 completed 2014 56 87 wells total1 2015 18…
Best Composite Well: Cline Example Cline Best Composite Well 0 1,000 2013 Composite well goals 2,000 Continuous improvement 3,000 2014 Identification of best practices 4,000 2015 Implementation of best practices 5,000 6,000…
Contiguous Acreage Enables Efficient Development Centralization of infrastructure provides benefits of 1.2 MM per well A four-well completion requires1: 1,000,000 barrels of water in two weeks Takeaway capacity for 82,500 BOE…
Infrastructure Integrated with Complete Development Plan Oil Takeaway Pipeline Oil Gathering Station Plains to Midland Oil Gathering Line Gas Lift Compression Facility Oil Takeaway Pipeline Medallion to Colorado City…
Production Corridor Status 2 Lacy Creek Corridor 1 2 Crude Gathering: JE Cox/Blanco Corridor Under review Crude Gathering: Water: In service Under review Water: Gas: In service and connected to water Low-pressure gas gathering…
Reagan North Corridor Per well estimated benefits of corridor investment (capital savings, LOE savings and price uplift) Natural gas for rig fuel, displaces higher cost diesel 37,500 Approximately 40% total investment pays out…
Lease Operating Expenses (LOE) Realizing LOE Annualized Savings Water: Expanding water management infrastructure PUMPER WELL WORK 9% Power: Replacing generators with the grid in new areas (WOE) Compression: Well pad compressors to…
Earth Model Objectives Standard Wellbore 1 Select Landing Point 2 3 4 6 2 Geosteering (stay in zone) 3 Frac Design 5 & Spacing 4 Frac 1 Barrier 5 Lateral Length 6 Earth Model potential to optimize development &…
3D Production Attribute Fluid / Stress Fracturing Brittleness Lithology Storage 0 30K 60K 90-day Cumulative Oil (BO) Landing, geosteering & staying in-zone fundamentally linked to highest 90-day cumulative oil…
Earth Model Enhancing Oil Production 60-day Cumulative Oil Production vs. Oil Type Curve 40,000 35,000 30,000 25,000 Barrels of Oil 20,000 15,000 Earth Model enhanced oil 10,000 production by more than 6,700 BO…
Earth Model Economic Uplift Implications 10,000 Upper Wolfcamp Multi-Well Pad Type Curve 60% Anticipate that the Earth Model will 50% be utilized to select the landing point and geosteer for 90% of 2015 Earth Model Potential…
Colorado City Hub Enhanced Liquidity Colorado City is an important trading hub for Permian crude oil Over 1.7 million BOPD capacity Avoids the congestion between Midland and Colorado City Provides access to both the Midwest and US…
Medallion Crude Oil System Overview Medallion pipeline system now 460 miles with 290,000 net acres dedicated to system and 1.8 million acres either under AMI or supporting firm commitments on the pipeline Total system capacity will…
Financial Flexibility to Enhance Value to Stakeholders Borrowing Base Operating within cash flow during the 1,200 second half of 20151 1,000 Liquidity of 933 million 800 Expect fall redetermination of senior MM 600 secured…
Peer Leading Oil Hedge Position Oil Production Hedged 1 100% 80.99 Floor % of Estimated Oil Production Hedged 80% 77.25 Floor 60% 40% 20% 0% 2H-2015 2016 LPI Peers 2 1 BMO research estimates of production…
Benefits of Hedging Program Hedging Benefit per Barrel of Oil 35 30 Uplift per Barrel of Oil Sold1 25 20 15 10 5 0 2H-2015 2016 LPI Midland Peer Avg.2 Laredos hedging program produced approximately 110 million…
Laredo Petroleum Investment Opportunity Contiguous acreage base in an outstanding basin Production corridor investments driving lower costs Medallion pipeline system is premier pipeline in Midland basin Earth Model initial…
Appendix
Building an Extensive Technical Database Technical database consisting of whole cores, sidewall cores, single-zone tests, open-hole logs, 3D seismic and production logs Provides the building blocks for identification of resource…
Regional Cross-Section 1 2 3 4 5 6 7 8 9 10 1 North South 2 3 Upper Spraberry 4 5 Lower 6 Spraberry 7 8 UWC 9 MWC 10 10 MILES LWC Canyon Flattened on the Middle Wolfcamp 500 Cline Strawn - GAMMA RAY ABW -…
Land Position Chronology EXPLORATION DELINEATION DEVELOPMENT 2008 2010 2012 2015 Howard Howard Howard Howard Glasscock Glasscock Glasscock Glasscock Sterling Sterling Sterling Sterling Reagan LPI leasehold Irion Irion…
Cline Inventory1 Development Hz Commerciality Hz Commerciality Formation/Zone Ready Confirmed Not Confirmed Cline 1,223 182 161 Formation/Zone LPI Operated Hz Wells Cline 52 LPI Hz Cline well Cline Development Ready…
Canyon Inventory1 Development Hz Commerciality Hz Commerciality Formation/Zone Ready Confirmed Not Confirmed Canyon 311 593 686 Formation/Zone LPI Operated Hz wells Canyon 2 LPI Hz Canyon well Canyon Development Ready…
Upper Wolfcamp 7,500 Type Curve 200,000 EUR: 850 MBOE (45% oil) Cumulative Production (BOE) 180-day cumulative: 91 MBOE (60% oil) 160,000 68 UWC wells operated by LPI included in 120,000 7,500 type curve normalized…
Middle Wolfcamp 7,500 Type Curve 200,000 EUR: 750 MBOE (50% oil) Cumulative Production (BOE) 180-day cumulative: 80 MBOE (61% oil) 160,000 27 MWC wells operated by LPI included in 120,000 7,500 type curve normalized…
Lower Wolfcamp 7,500 Type Curve 200,000 EUR: 700 MBOE (45% oil) Cumulative Production (BOE) 180-day cumulative: 80 MBOE (55% oil) 160,000 26 LWC wells operated by LPI included in 120,000 7,500 type curve normalized…
Cline 7,500 Type Curve 200,000 EUR: 725 MBOE (50% oil) Cumulative Production (BOE) 180-day cumulative: 96 MBOE (55% oil) 160,000 16 Cline wells operated by LPI included in 120,000 7,500 type curve normalized production PUDs…
Oil Hedges Open Positions As of June 30, 2015 1 2H-2015 2016 2017 Total 2 OIL Puts: Hedged volume (Bbls) 228,000 - - 228,000 Weighted average price (/Bbl) 75.00 - - 75.00 Swaps: Hedged volume (Bbls) 336,000 1,573,800 -…
Natural Gas Hedges Open Positions As of June 30, 2015 (1) 2H-2015 2016 2017 Total (2) NATURAL GAS Collars: Hedged volume (MMBtu) 14,384,000 18,666,000 5,475,000 38,525,000 Weighted average floor price (/MMBtu) 3.00 3.00 3.00 3.00…
2015 Guidance 3Q-2015 4Q-2015 FY-2015 Production (MMBOE) 3.9 4.1 3.7 3.9 16.1 16.5 Crude oil % of production 46% 46% 47% Natural gas liquids % of production 26% 26% 25% Natural gas % of production 28% 28% 28% Price Realizations…
Two-Stream to Three-Stream Conversions 1Q-14 2Q-14 3Q-14 4Q-14 FY-14 Production (2-Stream) BOE/D 27,041 28,653 32,970 39,722 32,134 Production % oil 58% 58% 59% 60% 59% Production (3-Stream) BOE/D 32,358 33,829 38,798 46,379…