Why Buy Tuscany Now Tuscany has built a large inventory of horizontal oil locations on properties with significant potential oil in place 80 to 191 potential locations in eight areas(1) 34 of potential locations booked in reserve…
Tuscanys Oil Exposure Revenue distribution Revenue distribution by product by province AB 11% SASK 89% Q2 2015 TSXV: TUS SEPTEMBER 8, 2015 3
2014-2015 Oil Price Collapse Collapse in world oil prices due to; Increase in US drilling. Success of fracked horizontal tight shale wells. Large increase in North American production. Abundant energy financing. Lack of OPEC…
Oil Price Recovery Oil price will recover due to; Large drop in US horizontal drilling. US oil production peaking. Increasing U.S. and China energy demand. Increasing number of financially stressed energy companies. Greatly…
US Oil Price vs Oil Rig Count 8-Sep-2015 US Crude Oil Price / Oil Rig Count Monthly 135 1,750 Oil Rig Count, last week of month (source: Baker Hughes) 120 1,500 Oil price, monthly avg (/bbl, WTI; source: EIA) 105…
US Oil Production vs Oil Rig Count 8-Sep-2015 US Crude Oil Production / Oil Rig Count Weekly 10.0 1,800 1,700 Production Plateauing 1,600 1,500 9.5 1,400 Oil Rig Count (source: Baker Hughes) (million BBLS Oil/Day;…
Tuscany Overview Oil focussed asset base in Saskatchewan. Substantial Discovered Oil Initially in Place. Large horizontal development well inventory. Proven development areas - Evesham and Macklin locations offsetting producing…
Capital Structure (millions unless otherwise indicated) Shares outstanding: 50.6 Fully diluted: 54.3 Management ownership: 36% Net debt June 30, 2015(1) 6.5 Bank line 8.5 Market cap: (at 0.13/share) 6.6 Debt/Cash Flow: Q2…
2014 Review Raised 5.3 million. Drilled 8 horizontal Dina oil wells; Two at Evesham, Five at Macklin, and One at Rutland Drilled initial horizontal Lloydminster well at Morgan. Drilled a Macklin disposal well TSXV: TUS…
Growth in Reserves and NPV * * * *Net present value 10% is based on McDaniel reserve report and pricing as at December 31, 2014 (see Tuscanys AIF for year ended December 31, 2014) and does not represent fair market value of…
Net Asset Value Proven Reserves (NPV 10%)(1)(7) 30.9 0.60 Probable Reserves (NPV 10%)(1)(7) 31.1 0.61 Undeveloped land (50 per acre)(2) 3.3 0.06 Abandonment liability(3) (1.0) (0.02) Net debt(4) (6.7) (0.13) Net Asset Value…
Discovered Oil Initially in Place Millions of barrels of oil equivalent(1) COMPANY TOTAL SHARE EVESHAM (Dina) 42.2 25.3 MACKLIN (Dina) 80.6 80.6 TOTAL 122.8 105.9 (1) Companys working interest share before deducting…
Contingent Resource-Best Estimate Millions of barrels of oil equivalent(1) COMPANY TOTAL SHARE EVESHAM (Dina) 3.6 2.2 MACKLIN (Dina) 5.5 5.5 TOTAL 9.1 7.7 (1) Companys working interest share before deducting royalties. Based…
Key Property Location Tuscanys oil assets are concentrated in the heavy oil prone corridor near Lloydminster TSXV: TUS SEPTEMBER 8, 2015 19
Area Activity Map TSXV: TUS SEPTEMBER 8, 2015 20
Well Logs Showing Dina Oil Pay TSXV: TUS SEPTEMBER 8, 2015 21
Evesham Dina Oil Play TSXV: TUS SEPTEMBER 8, 2015 22
Key Development Factors Significant pay thickness increases oil reserves Large structures provide repeatable development locations Horizontal drilling enhances oil recovery Use of slotted liner reduces capital costs. No frac…
Evesham Dina Oil Pool Tuscany - 60% working interest (Husky 40%) Drilled 16 horizontal wells. Discovered Oil Initially in Place: 42 million barrels (25 million barrels net)(4) 2P Reserves 2014 919 MBOE(1) 8 proved and 3 probable…
Evesham Horizontal Drilling 2-21 Vertical Well Cum Oil = 2,753 bbls 97/15-16 Horizontal Well Cum Oil =50,028 bbls (to August, 2015) Grd Level 750 Metres OIL DINA SAND WATER TSXV: TUS SEPTEMBER 8, 2015 25
Evesham Dina Production Cummulative Production to August 2015 60,000 Tuscany Horizontal Wells 55,000 (In chronological order left to right ) 50,000 45,000 40,000 Estimated Bbls to payout a 35,000 well at 60 US-WTI oil(1) 30,000…
Macklin Type Curve - Well Economics Type Wells generates an NPV10% of 2.3 million WTI70US/Bbl WTI 60US/Bbl based on McDaniel January Payout 0.5 years (50cdn at well) 1, 2015 price forecast ROI 80% Payout < 1.0 year ROI 49% WTI…
Winter Dina Location TSXV: TUS June 10, 2015 28
Winter Dina 3D Seismic Type Log 6-36-42-25W3 TSXV: TUS June 10, 2015 29
Winter Type Log TSXV: TUS June 10, 2015 30
Macklin Sparky Play Sparky Pool Outline TSXV: TUS SEPTEMBER 8, 2015 31
Maclin Sparky and Dina Pool Outlines Dina wells Sparky wells TSXV: TUS SEPTEMBER 8, 2015 32
Macklin Sparky Logs 4-14 on prod; Aug, 2013. July 2015 cum: 39.4 MSTB 2-22 on prod; June, 2013. July 2015 cum: 46.4 MSTB TSXV: TUS SEPTEMBER 8, 2015 33
TOTAL DEVELOPMENT POTENTIAL Potential horizontal locations LOW CASE HIGH CASE EVESHAM (Dina) 20 27 EVESHAM (Cummings) 2 4 MACKLIN (Dina) 20 43 MACKLIN (Sparky) 14 24 MORGAN (Lloydminster) 10 70 PROVOST ( 2 Properties) 2 6…
Analyst Coverage Acumen Capital Financial Partners Limited Trevor Reynolds Industrial Alliance Securities Inc. Michael Charlton TSXV: TUS SEPTEMBER 8, 2015 35
Advisories Presentation of Oil and Gas Information (continued) The discounted and undiscounted net present value of future net revenues attributable to reserves does not represent the fair market value of such reserves. There is no…
For further information, please visit: www.tuscanyenergy.com Suite 1800 633 6th Avenue S.W. Tel: (403) 269-9889 TSXV: TUS Calgary, AB T2P 2Y5 Fax: (403) 269-9890
Macklin Tuscanys management team. TSXV: TUS SEPTEMBER 8, 2015 41
Macklin Macklin 93/6-33-39-28W3 Electric Driver for PC Pump. TSXV: TUS SEPTEMBER 8, 2015 42
Macklin Slotted liner awaiting installation. TSXV: TUS SEPTEMBER 8, 2015 43
Evesham Evesham 10-21-39-27 W3 Battery TSXV: TUS SEPTEMBER 8, 2015 44
Evesham Evesham 10-21 Battery with Drilling Rig on 97/15-16 TSXV: TUS SEPTEMBER 8, 2015 45
Macklin Macklin 2-33 Battery. TSXV: TUS SEPTEMBER 8, 2015 46