Tourmaline Oil Corp. Corporate Presentation September 2015
2 Current Status Sept 2015 Production Overview September estimated production range 160,000 170,000 boepd Additional 25,000 boepd behind pipe awaiting tie-in 2015 average production forecast of 164,500 boepd (46% year over year…
3 Historical EP Performance July 2015 Production Growth Per Share* Reserves Growth Per Share* 250 4.5 Production per Thousand Shares Reserves per Share (BOEs) 4 200 3.5 3 150 2.5 (BOEs) 100 2 1.5 50 1 0.5 0 0…
Largest Canadian Gas Producers; 4 2014 & 2015 Canadian WCSB Production 2014 & 2015E** 1,700 1,600 1,500 2014 Production 2015E Production 1,400 1,300 1,200 1,100 Production (MMCF/D) 1,000 900 800 700 600 500 400…
5 Deep Basin Overview July 2015 Tourmaline has assembled the largest land position (1.35 million acres), delineated the largest drilling inventory (7,575 locations Schedule A) and has become the largest producer (current 100,000…
6 Alberta Deep Basin Sept 2015 DEEP BASIN - Deep Basin Overall Area R. 9 R. 7 R. 5 R. 3 R. 1, W6M R. 24 R. 22 R. 20 T. 63 Current Production 105,000 boepd Current Reserves 479 mmboe (Jan 1, 2015) Tourmaline Land Base 2,550…
7 Alberta Deep Basin: Wilrich Regional Resource Play Sept 2015 DEEP BASIN - Deep Basin Overall Area R. 9 R. 7 R. 5 R. 3 R. 1, W6M R. 24 R. 22 R. 20 T. 63 Tourmaline Lands Kakwa 13-15/4-10 Pad 30 day IP 24.8mmcfpd Tourmaline…
Deep Basin Wilrich: Sweet Spot Outperformance 8 TOU has delineated six extensive sweet spots in the Wilrich to date, totalling 625 of the 2,400 Company interest drilling locations*. These future locations are all accessible to…
9 Top AB Natural Gas Wells for 2014 Source: Peters & Co, geoSCOUT
10 Alberta Deep Basin Infrastructure Sept 2015 DEEP BASIN - Deep Basin Overall Area R. 7 R. 5 R. 3 R. 1, W6M R. 24 R. 22 R. 20 Tourmaline Tourmalines 1.35 MM Acres, the largest land position in the Deep Musreau 8-13 TCPL Main…
NEBC Montney Gas Condensate and Peace 11 River High Charlie Lake Oil Core Areas Sept 2015 R23 R21 R19 R17 R15 R13 R11 R9 R7 R5 R3 R 1, W6M NE Alberta BC T85 Parkland Wabamun Gas Pool Devonian Parkland Non-Deposition T83…
12 Sunrise/Dawson NEBC Montney/Doig Development July 2015 Current Prod. 225-235 mmcf/d Westcoast McMahon 4,000 bopd (cond,ngls) Gas Plant Current Reserves 305 mmboe (Jan 1, 2015) 2015 Drilling 35-40 Montney Hz Gas, 1 Doig Hz…
13 Tourmaline Regional Montney Play BC/AB July 2015 R9 R5 R1W6 R20 Tourmaline R16 is the R8W5 T95 5th/6th largest Montney producer in Canada through development of only one of its four Montney play areas The companysT91…
14 Peace River High Complex Charlie Lake Play July 2015 Earring 15-16 R. 10 R. 9 R.BOPD, IP90: 130 7 R. 5 Peace River High Charlie Lake Play 1.7 MMSCF/D 1,566 Horizontal Locations* along Regional Play Fairway 6-10 Vert. Cum. 55…
2015 Acquisition Activity 15 Sweet Spot Consolidation Strategy Sept 2015 R. 15W6 R. 15W6 R.R. 1W6 1W6 R. 15W5 R. 15W5 2015 Acquisition activities will focus on adding new lands and incremental locations in the highest…
16 2015 New EP Opportunities Sept 2015 Tourmaline has multiple new plays and opportunities arising from the ongoing EP program. R. 1W6 All of these new opportunities will access existing Tourmaline infrastructure R. 15W6 R.…
17 Tourmaline Mid-Stream Assets Sept 2015 The infrastructure skeleton in all three core operated complexes is now complete R. 15W6 R. 1W6 R. 15W5 NE Alberta BC Inga 12 Working interest gas plants, 10 of which are 100% owned and…
19 Gas Development Location Inventory and Economics Apr 2015 AB Deep Basin Outer Foothills AB Deep Basin B.C. Montney Charlie Lk Vertical Vertical Horizontal Horizontal Horizontal Total Well Costs 3.7 5.25 5.2 3.7 3.5 (Drill,…
20 5 Year Development Outlook Aug 2015 300,000 270,000 2018 Production Outlook does not include 240,000 2017 Production the impact of the Mapan 210,000 transaction. BOE/Day 2016 Production 180,000 150,000 2015 Production…
22 2015 and 2016 Base Budget Aug 2015 2015 2016 Capital Spending (excluding A&D) 1,400.0 million 1,350.0 million Annual Average Production 164,500 boe/d 215,000 boe/d Average Q4 2015/Q4 2016 Production 200,463 boe/d 221,849…
23 2H 2015/2016 EP/Operations Outlook Sept 2015 2015 production growth in excess of 40% YOY 2015 exit facility capacity of approximately 200,000 boepd, matching the estimated 2015 exit production estimate. Tourmaline drilled…
24 2H 2015/2016 Financial/Capital Outlook Sept 2015 By exit 2015 Tourmaline will be capital spending/cash flow neutral, EP capital budgets for 2016 and beyond will be less than or equal to cash flow. Tourmaline expects to execute…
25 Capitalization to Date Insiders Public Total millions of shares Price* millions of shares Price* 2008 Financings Common shares 28.50 5.16 22.00 7.00 301.0 2008 Financings Flow through shares 1.25 10.00 1.25 10.00 25.0 2009…
APPENDIX
27 Natural Gas Flows From Western Canada
28 Tourmaline vs Marcellus Peers (1) March 2015 Tourmaline Tourmaline Marcellus Shale Marcellus Shale Alberta Deep B.C. Montney (2) Liquids Rich (5 Companies) Basin (2) (5 Companies) Drill, Case, Complete Costs 4.5MM 3.3MM 6.75MM…
29 Natural Gas Outlook Natural gas, the cleanest burning/lowest emission content of the fossil fuel group is the logical energy bridge source for the next several decades. The North American natural gas EP sector requires prices…
30 Hedging Summary 2015 Aug 2015 2015 Gas Hedges (August December) Volume Weighted Avg Price mcf/d /mcf(1) Fixed Price Hedges AECO (CDN) 254,523 3.59 Fixed Nymex (CDN)(2) 59,946 3.90 Total Fixed Hedges 314,469 % gas hedged…
31 Incremental Q2-Q4 2015 Opportunities July 2015 The Q4 2014/Q1 2015 EP Program yielded a large number of new, previously unfunded drilling opportunities throughout Tourmalines three operated complexes. The June 2015 financing will…
32 EP Growth Plan (Original Business Plan) Sept 2008 Primary growth mechanism will be a conventional EP Program (including Resource plays). Build 2-3 core EP areas during initial three years of operations. Strive for large…
33 Western Canadian Sedimentary Basin Selected Exploration & Production Opportunities NORTHWEST TERRITORIES Alta. Deep Basin Peace River High Charlie Lk. Oil. Alta./NEBC B.C. ALBERTA Resource Plays Peace River High…
Alberta Deep Basin: 34 Notikewin/Falher Hz Program July 2015 R. 9 R. 7 R. 5 R. 3 R. 1, W6M R. 24 R. 22 R. 20 T. 63 Kakwa 1-2 30 day IP 18.6 mmcfpd Kakwa 13-20 30 day IP 18.3 mmcfpd Wild R 12-28 T. 61 Musreau/ 30 day IP 22.4…
35 Banshee Alberta Gas Plant Simple, easy to construct dew point plants tied to the main TCPL sales system Total cost (2 phases) of 80M, capacity of 130 mmcfpd with enhanced liquids recovery capability
36 Dawson-Doe Montney Turbidite Play May 2015 Tourmaline has delineated a new condensate rich Lower Turbidite Montney lobe at Dawson-Doe, with 10 wells drilled and completed since Q4 2013. The Company has a total of 234 remaining…
37 Improving Montney Performance/ Efficiency History (More for Less) Montney Performance/Efficiency History (Duvernay/Tourmaline) 20 10 Initial Production Rate (mmcfpd) 15 Drill/Complete Cost (M) 10 5 5 0 0…
38 North East BC Montney Water Management July 2013 Non-potable water sourced lined reservoir for frac operations (2 non-freshwater wells) Separate water pipeline system to existing and future pads. Frac water pumped to pads…