Laredo Positioned for Any Environment Experienced management team has weathered commodity price drops of 50% or more five times and positioned the Company to weather a challenging price environment Took immediate action to reduce…
Maintaining Production and Managing Capital Average Daily Production1,2,3 Capital Investment2,3 50 1,400 45 1,200 Average Daily Production (MBOE/D) 40 Capital Investment (MM) 35 1,000 30 800 25 600 20 15 400 10…
Financial Flexibility to Enhance Value to Stakeholders Borrowing Base3 Operating approximately within cash flow 1,200 during the second half of 20151 1,000 Liquidity of 915 million2 800 MM Redetermination of senior secured…
Peer-Leading Oil Hedge Position Oil Production Hedged1 120% 80.99 70.84 Oil Production Hedged 100% Floor Floor % of Estimated 80% 60% 77.22 40% Floor 20% 0% 4Q-2015 2016 2017 LPI Midland Peer Avg. 2 Hedging…
Enhancing Value Regardless of Price Environment 10,000 laterals enhance rates of return Contiguous acreage base enables production corridors that drive lower capital and operational costs Early adoption of multi-well pad drilling…
Contiguous Acreage Drives Efficiencies 160,813 gross/138,289 net acres1 33% of acreage supports 10,000 laterals 75% of acreage supports laterals of 7,500 or longer Facilitates centralized infrastructure in production corridors…
10,000 Laterals Increase Capital Efficiency EURs for 10,000 laterals are 30% higher than 7,500 laterals for a 15% capital expenditure increase1 1,000 12 893 900 Well Cost per Stimulated Foot (/Ft) 790 790 10 800 9.2 754…
Production Corridors Lower Capital and Operational Costs Centralization of infrastructure provides benefits of 1.2 MM per well Production corridors can accommodate approximately 500 Upper and Middle Wolfcamp drilling locations…
Infrastructure Integrated with Complete Development Plan Oil Takeaway Pipeline Oil Gathering Station Plains to Midland Oil Gathering Line Gas Lift Compression Facility Oil Takeaway Pipeline Medallion to Colorado City…
Production Corridors Enable Multi-Well Pad Drilling Multi-well pads reduce capital expenditures by 400,000 per well A four-well completion requires1: 1,000,000 barrels of water in two weeks Takeaway capacity for 82,500 BOE per…
Reducing Lease Operating Expense (LOE) Production corridors facilitate lower unit LOE as more wells are drilled along corridors 35 Actuals Guidance 30 25 LOE (MM) 20 15 10 5 0 1Q15 2Q15 3Q15 4Q15E LOE (MM)…
Enhancing Well Returns1 60% 52% Well Returns (% Rate of Return) 50% 40% 40% 33% 30% 26% 19% 20% 15% 9% 10% 7% 0% 30 40 50 60 Crude Oil (/Bbl) Middle Wolfcamp Upper Wolfcamp Capital efficiency gains from drilling…
Capitalizing on Value Drivers 11-well project utilizing multi-well pads on production corridors, long laterals and the Earth Model to enhance returns Completion operations Multi-well pads currently underway with flowback expected…
Optimizing Development with the Earth Model Objective of the Earth Model is to facilitate the landing and steering of the wellbore and optimize the Standard completion to maximize oil production Wellbore Select Landing Point…
3D Attribution Analysis Proving Successful Fracturing Fluid / Stress Lithology Brittleness 0 30M 60M Storage 90-Day Cumulative Oil (BO) Earth Model has potential to optimize development & increase value 17
Earth Model Enhancing Oil Production 90-day Cumulative Oil Production vs. Oil Type Curve 50,000 46,714 BO 45,000 20% increase in oil volumes 40,000 38,405 BO 35,000 30,000 Barrels of Oil 25,000 20,000 15,000…
Earth Model Economic Uplift Implications 10,000 Upper Wolfcamp Multi-Well Pad Type Curve 60% Anticipate that the Earth Model will 50% be utilized to select the landing point and geosteer for 90% of 2015 Earth Model Potential…
Medallion Crude Oil System Overview Medallion pipeline system now 460 miles with 290,000 net acres dedicated to system and 1.8 million acres either under AMI or supporting firm commitments on the pipeline Laredo Midstream Services…
Medallion 2015 Forecast Delivered Volumes Third-party volume growth driven by 80,000 continued expansions of the pipeline 70,000 system and the optionality provided by the various delivery points 60,000 Volumes (BOPD)…
Laredo Petroleum Investment Opportunity Strong liquidity and hedge positions Contiguous acreage base in an outstanding basin Production corridor investments driving lower costs Medallion pipeline system is premier pipeline in…
Appendix
Land Position Chronology EXPLORATION DELINEATION DEVELOPMENT 2008 2010 2012 2015 Howard Howard Howard Howard Glasscock Glasscock Glasscock Glasscock Sterling Sterling Sterling Sterling Reagan LPI Leasehold Irion Irion…
Regional Cross-Section 1 1 2 3 4 5 6 7 8 9 10 North South 2 3 Upper Spraberry 4 5 6 Lower 7 Spraberry 8 UWC 9 MWC 10 10 MILES LWC Canyon Flattened on the Middle Wolfcamp 500 Cline Strawn - GAMMA RAY ABW -…
Reagan North Corridor Benefits Per well estimated benefits of corridor investment (capital savings, LOE savings and price uplift) Natural gas for rig fuel, displaces higher cost diesel 37,500 Approximately 40% total investment pays…
Upper & Middle Wolfcamp 7,500 Type Curve Upper Wolfcamp 1,000 EUR: 850 MBOE (45% oil) 180-day cumulative: 91 MBOE (60% oil) BOE/D 100 70 UWC wells operated by LPI included in 7,500 type curve normalized production…
Lower Wolfcamp & Cline 7,500 Type Curve Lower Wolfcamp 1,000 EUR: 700 MBOE (45% oil) 180-day cumulative: 80 MBOE (55% oil) BOE/D 100 26 LWC wells operated by LPI included in 7,500 type curve normalized production Normalized…
Oil Hedges Open Positions As of September 30, 20151 4Q-2015 2016 2017 Total 2 OIL Puts: Hedged volume (Bbls) 114,000 1,296,000 - 1,410,000 Weighted average price (/Bbl) 75.00 45.00 - 47.43 Swaps: Hedged volume (Bbls) 168,000…
Natural Gas Hedges Open Positions As of September 30, 20151 4Q-2015 2016 2017 Total 2 NATURAL GAS Collars: Hedged volume (MMBtu) 7,192,000 18,666,000 5,475,000 31,333,000 Weighted average floor price (/MMBtu) 3.00 3.00 3.00 3.00…
2015 Guidance 4Q-2015 FY-2015 Production (MMBOE) 3.6 3.8 16.2 16.4 Crude oil % of production 45% 46% Natural gas liquids % of production 27% 26% Natural gas % of production 28% 28% Price Realizations (pre-hedge): Crude oil (%…
Two-Stream to Three-Stream Conversions 1Q-14 2Q-14 3Q-14 4Q-14 FY-14 Production (2-Stream) BOE/D 27,041 28,653 32,970 39,722 32,134 Production % oil 58% 58% 59% 60% 59% Production (3-Stream) BOE/D 32,358 33,829 38,798 46,379…