Who is Cimarex Market cap......... 8.0B Debt/Adj. EBITDA1........ 1.9x Production (4Q15)..... 986 MMcfe/d Proved reserves..... 2.9 Tcfe % Natural gas..... 52% % Proved developed..... 75% R/P Ratio..... 8.1x Quarterly…
Whats Important Returns drive decisions Balanced portfolio of assets Premier position in the Delaware Basin and MidCon region Flexibility through commodity cycles Idea generation and track record of strong execution Strong…
Regional Diversity Provides Flexibility Fourth Quarter 2015 Production Mix Permian Basin MidContinent 4Q production averaged 986 MMcfe/d 7
2015 E&D Investment Drilling & Completion Capital Total: 877 million 730mm 11 operated rigs at yearend Projects begun in 4Q15 Culberson Upper Wolfcamp downspacing pilot Meramec stacked/ staggered spacing pilot Sixsection Woodford…
2016 E&D Investment Drilling & Completion Capital 600650mm 400460mm Multiple projects/multiple zones Delaware Basin Acreage obligations Upper & Lower Wolfcamp in Culberson County Reeves infill development MidContinent region…
Biggest Opportunity Delaware Basin Wolfcamp 230,000 net acres in the fairway Multiple Wolfcamp Targets Culberson/White City Area 100,000+ net acres Upper & Lower Wolfcamp JDA with Chevron Reeves County 80,000 net acres Upper…
Culberson Area Wolfcamp Details 100,000+ 100,000 net netacres; acres JDA with Chevron 2013 main objectives 18 Drilling LowertoWolfcamp long hold acreage Wolfcamp laterals C&D producing Two rigs; 20 wells Nine Upper Wolfcamp long 41…
Long Lateral Performance Culberson Lower Wolfcamp Thirteen 10,000foot lateral 600 Cumulative Production Average 30day peak IP of (MBOE) 2,308 BOE/d (25% oil; 46% 500 gas; 29% NGL) 70% Increase 400 300 200 100 0 0…
Improving Upper Wolfcamp Completion Design Culberson County Upper Wolfcamp Seven 7,500ft. laterals 250 Cumulative Production Two with larger completion (MBOE) Larger completion yields 34% 34% Increase 200 uplift after 125 days…
Culberson County Upper Wolfcamp Pilot Sixwell downspacing pilot 7,500foot laterals Stacked/staggered well pattern Sunnys Halo section testing 8 wells/section; Sunnys Halo Gato del Sol Gato del Sol testing 6 wells/section Wells…
Culberson County Tim Tam Infill Development First Lower Wolfcamp Infill Drill five 10,000foot laterals 107acre spacing (6 wells/section) Wells to be staggered in the Lower Wolfcamp Spud in first quarter of 2016 First production…
Upsized Frac Improves Second Bone Spring Results White City Area 200 Cumulative Production (MBOE) Focus Area 180 160 140 70% Increase 120 100 80 15 stages from nine 60 100 locations identified 40 Latest 7,000 ft lateral…
2015 Activity in Reeves County 8 Upper Wolfcamp long laterals Average 30day peak IP of 1,575 BOE/d (50% oil; 28% gas; 22% NGL) Best well to date Big Timber has avg. 30day peak IP of 3,309 BOE/d (49% oil; 27% gas; 24% NGL) 2016…
MidContinent Woodford Shale Activity CanaWoodford Activity Map Row 4 production began in 4Q15 Eastern core infill drilling Operated Well Nonoperated Well Completions begin in 4Q16 6 sections; 2 operated 50 gross (22 net) wells…
Woodford: Consistent Results Across Acreage Phillips, Armacost Sections Row 4 Infill 2,400 Cumulative Production (MMcfe) 2,000 Golden Section Haley Section Hartz Section 1,600 Eastern Core Infill First Year Cumulative…
Meramec: The Big Picture Two 10,000ft laterals producing Third long lateral flowing back First stacked/staggered Meramec test producing Two wells 270 apart vt.; 660 hz. Avg. 30day peak IP of 7.6 MMcfe/d (42% gas, 23% NGL, 35% oil)…
Meramec Long Lateral Performance 69% uplift after 120 days 1,400 Cumulative Production Two 10,000ft laterals have 30 (MMCFE) day peak IP of 15.0 MMcfe/d 1,200 53% gas, 23% NGL, 24% oil Oil yields range from 37104 1,000 Bbl/MMcf 69%…
Meramec Next Step: Spacing Pilots Stacked/Staggered Pilot Eight total wells; Two rigs Meramec working Osage Four Meramec wells Staggered between upper and lower zones Testing 10 wells per section; five per landing zone Woodford…
Wellpositioned for 2016 and Beyond Diverse asset portfolio with solid returns Strong financial position Flexibility to adapt to commodity environment Emphasis on improved productivity Focus on retaining our attractive acreage…
Appendix 25 25
2016 Guidance 2016 Production, Unit Expense and Capital Guidance First Quarter 2016 Production Total Equivalent (Mmcfe/d) 925955 890930 % Liquids 52% 52% Capital Expenditures 600650 million Expenses (/Mcfe): 2016 Production…
Hedges First Second Third Fourth Oil: Quarter Quarter Quarter Quarter Total 2016 WTI Oil ThreeWay Collars (1) Volume (Bbl) 273,000 273,000 276,000 276,000 1,098,000 Wtd Avg Floor Sold (put) 40.00 40.00 40.00 40.00 40.00 Wtd Avg…
Permian Region Provides Multiple Opportunities Multiple projects/multiple zones Wolfcamp shale (oil & gas) Bone Spring sands (oil) Avalon Shale (oil window) 2015 Focus Wolfcamp Long Laterals Meeting acreage obligations White City…
Long Laterals Provide Upsized Returns Culberson County Lower Wolfcamp 3000 BOE/day 5,000 ft. lateral 10,000 ft. lateral Well Cost (MM) 7.1 11.2 2500 BTAX IRR 48% 75% NPV10 (MM) 4.6 12.5 2000 Realized prices: Oil 50/Bbl; Gas…
Culberson County Downspacing Pilot Results Two fourwell pilots; 5,000ft laterals Barbaro Pilot 80acre spacing (8 wells/section) 20stage completion; 1,200 lbs/foot PrewitOmaha Pilot 107acre spacing (6 wells/section) 16stage…
Strong Performance from Key Culberson Wolfcamp Wells Shallow Decline of Upsized Fracs (BOE/d) Lower Wolfcamp Upper Wolfcamp 3,000 1,600 30day IP Days 3060 2,450 2,500 Days 6090 2,500 1,200 1,250 1,095 90 day average 2,000 1,365…
Delaware Basin Avalon Shale: Spacing Pilots Four spacing pilots; 18 total wells Testing 6 & 8 wells/section Average 30day peak rate of 1,012 BOE/d (70% oil; 17% gas; 13% NGL) 250 locations Includes Avalon and Leonard Assumes…
NonGAAP Reconciliation Reconciliation of Net Income to EBITDA and Adjusted EBITDA ( in Millions) 2012 2013 2014 2015 Net income (loss) 354 565 507 (2,409) Income tax expense (benefit) 207 329 299 (1,373) Interest expense, net of…
NonGAAP Reconciliation Reconciliation of cash flow from operations Debt/Cap Calculation Dec. 31, Three months 2015 Ended Dec. 31 (in millions) 2015 2014 (in millions) Long-term debt (principal) 1,500 Net cash provided by…