Granite: Organic Growth + Sustainable Dividend Optimize Return Established gas injection EOR scheme driving higher recoveries and mitigating declines Low-decline, conventional oil pool 100% land and infrastructure control on…
The Asset G R A N I T E O I L C O R P. T S X : G X O 5
Granite Asset Alberta Bakken 450,000 Net Acreage 100% Owned Facilities 80 Section Oil Pool 162 Drilling Locations G R A N I T E O I L C O R P. 6
Bakken Pool Development and Drilling Inventory PHASE 1 EOR 8 Wells / Section PHASE 2 EOR PHASE 3 EOR 40 Wells 8 Wells / Section 8 Wells / Section 16 Wells 32 Wells WEST BAKKEN DEVELOPMENT 4 Wells / Section 66 Wells G…
Gas Injection Enhanced Oil Recovery G R A N I T E O I L C O R P. T S X : G X O 8
Maximizing Recovery and Capital Efficiency Proven results from gas injection EOR scheme: Observed improvement in production decline profile in new and existing wells Produced gas is re-injected into the reservoir to manage voidage…
Injection on Structural Highs ALBERTA BAKKEN TOP STRUCTURE Planned -1250 m 2016 Infill Gas Depth Injectors AER INJECTION APPROVAL AREA -1300 m Gas Injection on Structural Highs Supports Pressure Drive for Deeper…
The Process Dry Make-up Gas C5+ Hydrocarbons to Compressor Sales Gas Plant Dry Gas to Compressor Compressed Gas Separator Re-injected Produced Oil + Gas Oil to Sales EOR Basics Injected gas in the top of the reservoir…
Oil Production Gas Injection Optimizing Drilling 10 m Gas Injected into the Top of the Reservoir Increases Pressure and Oil Mobility Limestone Cap Deeper Infill Production Wells Optimize Reservoir Drainage G…
Results EOR-Optimized Wells 2015 EOR-OPTIMIZED WELLS VS. TYPE CURVE 600.00 500.00 400.00 Oil Production (BBL/D) 300.00 200.00 100.00 0.00 0 30 60 90 120 150 180 210 240 270 300 330 360 390 Days on…
EOR Area Phase 1 Development - Ten Year Drilling and Injection Plan POOL DEVELOPMENT 53 Well PLAN - YEAR 2025 Inventory Optimize EOR efficiency in the Core: on 200 m Down Spacing Re-inject 100% of produced gas from AER INJECTION…
Results Managing Declines to Maximize Value 4000 120% 3500 100% 100% 100% 100% 100% Injection/Production Voidage Replacement Ration (%) 3000 82% 80% Average Daily Production (BBL/D) 75% 2500 Production and EOR…
Swanson River Oil Pool Study Gas Injection-Supported Undersaturated Oil Reservoir Discovered in Apr. 1957; Drilling development largely completed by 1963 with 55 completed wells Gas injection pilot program started in 1962 in…
Economics G R A N I T E O I L C O R P. T S X : G X O 17
Well Economics TYPE WELL DEFINITION Bakken Type Well 300 Well Cost: 1.8 MM EUR: 200 Mbbl 250 Capital Efficiency: 10,000 per 200 daily flowing bbl Bbl/day Year 1: 190 bbl/d average 150 Well F+D: 9.00 / bbl 100 Royalty:…
2016 Budget USD 32.50 WTI Average Production Level Oil & NGLs (Bbl/d) 3000 Reserves MMBOE (Sproule P&P) January 1, 2015 16.956 Guidance 2016 CAPEX (MM) 10.5 2016 Production (Bbl/d) 3000 2017 CAPEX (MM) 7 2017 Production…
The Team G R A N I T E O I L C O R P. T S X : G X O 23
Granite Oil Corp.s Team MANAGEMENT TEAM Michael Kabanuk President and Chief Executive Officer Michael is a Professional Engineer with 23 years of engineering and management experience in the oil and natural gas industry. Prior to…
Granite Oil Corp.s Team BOARD OF DIRECTORS Brendan Carrigy Chair Kevin Andrus Martin Cheyne Michael Kabanuk Henry Hamm Dennis Nerland Bradley Porter G R A N I T E O I L C O R P. T S X : G X O 25
APPENDIX G R A N I T E O I L C O R P. T S X : G X O 26
Alberta Bakken Development Timeline EOR PILOT Test Secondary Recovery with gas injection EXPLORATION Design Infrastructure for MAXIMIZE RETURNS Alberta Bakken Discovery: Full-Scale Deployment Maximize Oil Recovery Reagan 1-3…