Scotia Howard Weil 44th Annual Energy Conference MARCH 2016
Company overview AREX OVERVIEW ASSET OVERVIEW Enterprise value 560MM High-quality reserve base 167 MMBoe proved reserves 63% Liquids, 33% oil 504 MM proved PV-10 (non-GAAP) Permian core operating area 138,000 gross (126,000 net)…
Fourth quarter and full-year 2015 operating highlights FY 2015 Q4 2015 Drilled 20 HZ wells and completed 28 HZ No D&C activity during the quarter given wells sustained low commodity prices Solid execution Total production 5,532 MBoe…
The business is anchored by long-lived, low-cost proved reserve base 12/31/2015 reserve summary prepared by DeGolyer and MacNaughton (D&M) Replaced 603% of produced reserves at a drill-bit F&D cost (non-GAAP) of 4.32 per Boe1 Total…
Fourth quarter and full-year 2015 financial highlights FY 2015 Q4 2015 Revenues of 131.3 MM Revenues of 25.5 MM LOE of 5.24/Boe, a 19% reduction over LOE of 5.44/Boe, 18% reduction over prior year prior year Maximizing Cash G&A of…
Balance sheet detail At 12/31/2015 we had a 1 billion senior secured revolving AREX Liquidity and Capitalization credit facility in place, with aggregate lender commitments AREX Capitalization as of 12/31/2015 ( MM) and borrowing…
Strong track record of reserve and production growth RESERVE GROWTH PRODUCTION GROWTH MMBoe MBoe/d 180 16.0 160 14.0 140 12.0 120 10.0 100 8.0 80 60 6.0 40 4.0 20 2.0 0 2004 2005 2006 2007 2008 2009 2010 2011 2012…
AREX Wolfcamp A Bench wells and locations PDP PDNP PUD Pangea West Production Corridor PROB/POSS/RES PDP Project Pangea PUD Production Corridor PROB/POSS/RES Potential 10,000 laterals Potential 10,000 laterals Production…
AREX Wolfcamp B Bench wells and locations PDP Pangea West PUD Production Corridor PUD PDP Project Pangea Production Corridor PROB/POSS/RES PROB/POSS/RES Potential 10,000 laterals Potential 10,000 laterals Production…
AREX Wolfcamp C Bench wells and locations PDP PUD Pangea West Production Corridor PDP PROB/POSS/RES PUD Project Pangea Production Corridor PROB/POSS/RES Potential 10,000 laterals Potential 10,000 laterals Production…
Established infrastructure in place is critical to low cost structure Over 500 miles of pipelines in place More than 100 MMcfg/d gathering and gas lifting capacity Expandable up to 500 MMcfg/d One Centralized Super Water Recycle…
Enhanced completion design drives outperformance from 2015 wells 120,000 100,000 2015 Wolfcamp B&C bench completions Average completed lateral length = 6886' Cumulative Production (Boe) 80,000 60,000 40,000…
Key investment highlights Low-Risk, Oil-Rich Asset Base in Midland Basin Drilled over 170 HZ Wolfcamp wells, acreage derisked and type curve exceeded by actual results Recent wells achieving 15% IRR at current NYMEX strip prices…
Current hedge position Based on the midpoint of current 2016 guidance, approximately 51% of forecasted oil production and 65% of forecasted natural gas production are hedged at weighted average prices of 49.67/Bbl and 2.60/MMBtu,…
Production and expense guidance 2016 Guidance Production Oil (MBbls) 1,300 1,400 NGLs (MBbls) 1,440 1,540 Natural Gas (MMcf) 9,600 10,100 Total (MBoe) 4,340 4,625 Cash operating costs (per Boe) Lease operating 5.00 - 6.00…
AREX Wolfcamp acreage is offset by large operators APA REAGAN PXD ENDEAVOR PXD DVN APA BROADOAK IRION UPTON EAP EOG / EAP EOG HENRY ELEVATION SCHLEICHER DVN AREX AREX EP ENERGY Pangea West DVN AREX AREX EOG APA EP…
AREX Flowback and produced water recycle facility 32,000 32,000 2.2 MM Bbls flowback and BBL produced water recycled since 20 Treated Flowback & Produced Frac Water Supply Line BBL Treated Treated Water Water inception Tank…
Adjusted net (loss) income (unaudited) The amounts included in the calculation of adjusted net (loss) income and adjusted net (loss) income per diluted share below were computed in accordance with GAAP. We believe adjusted net (loss)…
EBITDAX (unaudited) We define EBITDAX as net (loss) income, plus (1) exploration expense, (2) depletion, depreciation and amortization expense, (3) share-based compensation expense, (4) impairment of oil and gas properties, (5)…
Cash operating expenses (unaudited) Cash operating expenses We define cash operating expenses as operating expenses, excluding (1) exploration expense, (2) depletion, depreciation and amortization expense, (3) share-based compensation…
F&D costs (unaudited) All-in finding and development (F&D) costs are calculated by dividing the sum of F&D Cost reconciliation property acquisition costs, exploration costs and development costs for the year by the sum of reserve…
PV-10 (unaudited) The present value of our proved reserves, discounted at 10% (PV-10), was estimated at 504 million at December 31, 2015, and was calculated based on the first-of-the-month, twelve-month average prices for oil, NGLs and…